• 제목/요약/키워드: Summer peak time

검색결과 118건 처리시간 0.023초

SEASONAL VARIATIONS IN THE HYPOPHYSIAL RESPONSIVENESS TO GnRH IN CYCLING BUFFALO (Bubalus bubalis)

  • Palta, P.;Madan, M.L.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제9권6호
    • /
    • pp.711-714
    • /
    • 1996
  • The present study investigated the hypophysial responsiveness in terms of GnRH induced LH and FSH release in cycling buffalo during the tropical summer and winter climatic conditions (seasons). Peripheral plasma LH and FSH levels were measured at 1 hour before and 6 hours subsequent to the administration of GnRH (1 ug/kg body weight) or saline on Day 14 of oestrous cycle in 2 groups of buffalo (n = 6 each) during summer and winter seasons. Although GnRH induced LH peak concentrations did not differ during the two seasons, time to attain LH peak concentration was shorter (p < 0.05) and the area under LH peak was 39% higher (p < 0.05) during winter season in comparison to summer season. However, season had no effect on GnRH induced peak FSH concentration, time to attain peak FSH concentration and the area under FSH peak. Pretreatment basal LH and FSH levels did not differ during the two seasons. The present study suggests that the summer season adversely affects the GnRH stimulated release of LH in buffalo.

하계최대부하 억제를 위한 디맨드 콘트롤러 적용사례 및 경제성 평가 (Application of Demand Controller for Summer Peak Demand Shaving and Valuation of its Economical Efficiency)

  • 강원구;이기원;김인수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.720-723
    • /
    • 1996
  • The recent summer power peak crisis has been caused by excessive use of cooling loads at daily peak time in summer. The yearly load shape of KEPCO has gradually became very steep valley. Under this situation, more efficient DSM(Demand Side Management) tools are fully required for summer peak clipping and shaving. In this paper, the KEPCO's Jeju-Do model project for DSM, especially for Demand Controller, is presented. Demand Controller was evaluated to have the very high economical efficiency against the investment in equipment, as compared with another DSM tools. There were some serious problem to apply Demand Controller to many customers in the aspect to synchronization with KEPCO's watthour meter. But these problems have solved by Keyin's new Demand Controller using vision algorithm.

  • PDF

관찰기법을 이용한 도시민의 야외 운동장소 이용특성 분석 - 이용 시간과 공간을 중심으로 - (Analysis on the Time and Spacial Characteristic of Citizen Outdoor Activity)

  • 이연숙;안창헌;이동주;이유빈
    • KIEAE Journal
    • /
    • 제11권2호
    • /
    • pp.83-90
    • /
    • 2011
  • This study has observed 12 parks (20 spots) in Seoul to know the number of users, gender, age groups for the units of 30 minutes from 06:00AM till 10:00PM. According to the systematic characteristic of the surveyed outdoor exercise place, the details of their users during the summer time were analyzed from the objective viewpoint. Major results of analysis are as follows: Firstly, in case of the riverside of the Han River 07:00AM marked a mini peak and 21:00PM reached the peak, and in case of sub-stream neighborhoods, 21:00PM showed only one peak. On the other hand, in case of neighborhood parks (including pocket park) no peak time was noticeable. Secondly, in case of the riverside of the Han River and the neighborhoods of sub-streams, people used the exercise equipment remarkably at night, and in case of neighborhood parks people used the exercise equipment a little bit more in the morning than in the afternoon. Thirdly, in case of nights in summer the riverside of the Han River was preferred by men, while the neighborhoods of sub-streams were preferred by women and the neighborhood parks showed no difference in the number of users among men and women. Fourthly, differently from men, women do not regard the exercise so seriously as men and their purpose of using outdoor exercise place is to use their leisure time mostly with their family members or neighbors, and women prefer light and comfortable exercises. Fifthly, in summer even those who like to exercise a lot like to exercise in the morning to avoid summer heat. Therefore, provision of shades in summer is very important.

원격제어 에어컨 개발 보급현황 및 향후전망 (A development of direct load control system for air-conditioner)

  • 강원구;김충환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 D
    • /
    • pp.2446-2448
    • /
    • 2001
  • In addition to the stabilization of electricity supply and the quality management of electricity, load balance has been an important strategy for achieving high quality load management. Among many techniques for load management, direct load management has been actively studied and applied for increasing the efficiency of power facility and suppressing peak load. In Korea, the highest peak load is demanded in summer rather than in winter, and almost 50% of the peak load comes from cooling load. Currently, applicable systems are limited to air conditioners that have the cooling capacity less than 2kW. This paper describes the development of remote controlled air conditioners and the result of the field test of the new type air conditioner. The technical specification based on the test will be applied to the new model of the remote controlled air conditioner. The wide distribution of the air conditioners to the public will be helpful to control peak demand due to cooling load in summer time. Financial investment to generating, transmission, distribution facilities will be decreased from flatting the seasonal power load.

  • PDF

제주도 지역별 대용량 태양광발전소들의 여름 피크타임 기여도 연구 (Contribution of Large-Scale PV Plants in the Respective Region of the Jeju Island to Electric Power during Summer Peak Times)

  • ;고석영;사공준;권훈;이개명
    • 전기학회논문지
    • /
    • 제66권12호
    • /
    • pp.1873-1878
    • /
    • 2017
  • Both the introduction of the Renewable Energy Portfolio Standard (RPS) system into the electric energy market in 2012 and a decrease in the cost of constructing photovoltaic (PV) power plants have been increasing the number of MW PV plants in South Korea. Jeju Island is located at the center of three nations, South Korea, China and Japan, and its provincial government declared in 2012 that the island will be a clean region where greenhouse gases are not emitted by 2030. The Jeju provincial government is now doing its best to install PV plants and wind farms to realize a carbon-free island. In this study we investigated contribution of MW PV plants to the power of the electric grid during summer peak times on Jeju Island. Mt. Halla the highest mountain in South Korea, is located at the center of Jeju Island, and we divided the island into four regions and carried out analyses of a total of 24 PV plants. The average contribution of the PV plants in the respective region to electric power of Jeju Island during summer peak times was investigated and compared with those of the other regions. The best average contribution during the 12.5% maximum load period was obtained from the PV plants in the western region, and the value was 33% during 2015 and 2016.

2004년 하계 첨두부하 시 계통운영 실적 분석 (The Analysis of 2004 Summer Peak Load in Korea Power system)

  • 송태용;황봉환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.113-115
    • /
    • 2004
  • This year korea power system had recorded highest peak load for 6 times and finally it made new peak load 51,264MW at July 29th 3:00 PM. The new peak load is increased 8.2% from the last year peak load 47,385MW and korea power system entered 50,000MW load era. The Korea Power Exchange (KPX) snapped power system data at the peak load time using state estimation function in the EMS. And authors converted the power system data at peak load to PSS/E power flow format. Using this PSS/E peak load power flow data, this paper explains demand analysis result shun capacitor operation, voltage distribution at the peak load. And the paper shows the simulation result of 2 contingency analysis using the snapped PSS/E peak load data.

  • PDF

최근 한반도 여름철 강수특성의 변화 (Recent Changes in Summer Precipitation Characteristics over South Korea)

  • 박창용;문자연;차은정;윤원태;최영은
    • 대한지리학회지
    • /
    • 제43권3호
    • /
    • pp.324-336
    • /
    • 2008
  • 본 연구에서는 최근의 한반도 여름철 강수특성을 파악하기 위해 장기간($1958{\sim}2007$년) 관측을 수행하고 있는 기상관측소를 대상으로 강수량의 변화 경향을 시 공간적으로 분석하였다. 여름철($6{\sim}9$월) 강수량의 연변화를 분석하고 여름철을 장마와 장마 후 강수기간으로 구분하여 그 특징을 살펴보았다. 장마기간에는 남서풍과 준정체전선의 영향으로 산악지역의 풍상측에서 최대 강수량이 발생하였으며 장마 후 강수기간에는 한반도 주변의 서쪽 및 남동쪽에서 유입되는 하층순환장과 함께 태풍, 대류불안정, 저기압성 강수에 의해 주로 남해안과 영동 산간 및 해안지방에서 최대 강수량이 나타났다. 여름철($6{\sim}9$월) 강수량의 시계열 변화에서는 모든 지점에서 강수량이 증가하는 경향을 보여주었으며 이 중에서도 최근 10년이 가장 큰 증가 경향을 보였다. 일 강수량을 10년 단위로 평균하여 분석한 결과, 모든 지점에서 최근 10년에 장마 및 장마 후 강수기간의 강수량이 가장 크게 증가하는 것으로 나타났다. 지점별로 증가 경향은 차이를 보여주었는데, 강릉은 장마 후 강수기간의 강수량이 장마기간보다 더 많았으며 최근 들어 장마 후 강수기간의 강수량이 가장 크게 증가하였다. 서울과 부산의 경우는 최근 10년 동안 여름철 강수량의 두 개 최대값 사이의 강수량이 크게 증가하는 경향을 보여주었다.

하절기 최대 전력수요 저감 프로그램의 효과 (Empirical Analyses of the Effect of DSM on Peak Time Power Demand in Korea)

  • 김수덕;김영산;이우진
    • 자원ㆍ환경경제연구
    • /
    • 제17권2호
    • /
    • pp.213-233
    • /
    • 2008
  • 현재 한국전력이 시행하고 있는 하절기 부하관리 프로그램의 성과를 평가함에 있어, 해당 프로그램이 시행되지 않은 상태의 수요가 확인되지 않은 상태에서 단순 합산한 것임에도 불구하고 이 크기의 전체를 수요관리 효과로 집계하고 있다. 본 연구는 이러한 문제에 대해, 이들 프로그램 중에서 가장 비중이 큰 두 가지 프로그램-휴가보수기간 조정제도와 자율절전제도-이 하절기 피크 시간대인 오후 2시~4시 사이의 전력수요에 얼마나 큰 영향을 미치는지를 계량적으로 분석한다. 연구 결과에 의하면 이들 두 제도의 효과를 따로 분석할 경우에는 휴가보수기간 조정제도는 보된 실적치 1kW당 실제로 피크 시간대 전력수요가 시간당 0.53kW만큼 감소하였으며, 자율절전의 경우 실적치 1kW당 피크 시간대 전력수요는 시간당 0.57kwh만큼 감소하였다. 이들 결과는 이들 수요관리 프로그램들이 실제로 피크부하를 감소시키는 데에 상당한 효과가 있음을 보여 준다. 그러나 이 두 제도의 효과를 한꺼번에 분석하는 경우에는 각각의 효과가 크게 약해짐을 볼 수 있었다.

  • PDF

Efficiency of Heatsynch Protocol in Estrous Synchronization, Ovulation and Conception of Dairy Buffaloes (Bubalus bubalis)

  • Mohan, Krishna;Sarkar, M.;Prakash, B.S.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제22권6호
    • /
    • pp.774-780
    • /
    • 2009
  • The objectives of this study were to test the efficacy of induction of estrus and determine the timing of ovulation in relation to preovulatory LH and estrogen surges in cycling Murrah buffaloes subjected to Heatsynch protocol (GnRH-$PGF_2{\alpha}$-Estradiol benzoate). In experiment 1, the buffaloes (n = 10) were treated with Heatsynch protocol and observed for estrus and ovulation. In experiment 2 and 3, 30 cycling Murrah buffaloes were used to investigate the efficacy of Heatsynch protocol in terms of conception rates in summer (experiment 2) and winter (experiment 3) seasons. Fixed time A.I. was performed in all the buffaloes at 48 and 60 h post-estradiol benzoate (EB) injection. All buffaloes responded to the Heatsynch protocol with expression of estrus for which ovulations were induced in 8 buffaloes (80%). Mean time interval from the EB injection to ovulation was 50.0${\pm}$2.0 h (range 44.0 to 60.0 h). The interval from the end of LH surge to ovulation was 18.5${\pm}$2.47 h (range 8 to 26 h). The interval from end of estrogen surge to ovulation was 26.75 ${\pm}$2.07 h (range 22 to 36 h). Mean LH peak after EB injection occurred at 20.81${\pm}$1.61 h (range 14 to 28 h) and mean estrogen peak after EB injection occurred at 9.62${\pm}$1.03 h (range 7 to 16 h). Hence, the mean estrogen peak preceded the mean LH peak by 11 h. It was observed that the percentage of conceptions to total number of estruses for control buffaloes was 18 and 30 in summer and winter, respectively, whereas it increased to 26 and 40 in Heatsynch treated buffaloes in respective seasons. The results suggest the possibility of using Heatsynch treatment followed by fixed time A.I. in buffaloes for fertility improvement, especially since the incidence of silent heat in buffaloes is very high.

퍼지 논리를 이용한 일일 냉방부하 예측에 관한 연구 (A Study on Daily Cooling Load Forecast Using Fuzzy Logic)

  • 신관우;이윤섭
    • 제어로봇시스템학회논문지
    • /
    • 제8권11호
    • /
    • pp.948-953
    • /
    • 2002
  • The electric power load during the peak time in summer is strongly affected by cooling load, which decreases the preparation ratio of electricity and brings about the failure in the supply of electricity in the electric power system. The ice-storage system and heat pump system are possible solutions to settle this problem. In this study. the method of estimating temperature and humidity to forecast the cooling load of ice-storage system is suggested, then the method of forecasting the cooling load using fuzzy logic is suggested by simulating that the cooling load is calculated using actual temperature and humidity. The forecast of the temperature, humidity and cooling load are simulated, and it is shown that the forecasted data approach to the actual data. Operating the ice-storage system by the forecast of cooling load with night electric power will improve the ice-storage system efficiency and reduce the peak electric power load during the summer season as a result.