A study on fire phenomena in a subway transit mass station has been carried out as a part of disaster prevention plan at the subway station. The ventilation facilities installed in both the platform and the trackway are designed to convert into a smoke exhaust system in emergency situation, creating an environment necessary for evacuation. 3 dimensional Numerical Simulations based on the CFD are carried out using a simulation tool, Fire Dynamic Simulator. Total of six different cases are made and performances are compared each other to find optimal vents operation to ensure safer environment for evacuation at the platform area considering the installation of platform screen door.
Cho Young-Min;Park Duckshin;Park Byung-Hyun;Park Eun-Young
Proceedings of the KSR Conference
/
2005.05a
/
pp.77-82
/
2005
Recently, people's rising interests toward a 'well-being' lifestyle together with research contributions are accelerating the concerns regarding indoor air pollution making indoor air quality management an emerging environmental challenge of the era. The Ministry of Environment began to regulate the air quality of railway stations last year. The newly established 'Indoor Air Quality Act' covers 17 facilities whereas only underground subway stations and underground markets were regulated by previous 'Underground Air Quality Management Act' of 1996. In this study, we carried out the measurement of temperature, relative humidity, CO(carbon monooxide), $CO_2$(carbon dioxide), HCHO(formaldehyde), PM-10(particulate matters), and VOCs(volatile organic compounds) in underground subway stations. Based on the obtained results, we will suggest a way to improve the indoor air quality of the subway stations.
So, Jin-Sub;Yoo, Seong-Yeon;Yun, Cha-Jung;Kim, Wan-Jong;Kang, Sung-Hae;Park, Duk-Sin;Cho, Young-Min;Kwon, Soon-Bark;Park, Eun-Young
Proceedings of the KSR Conference
/
2007.05a
/
pp.1325-1329
/
2007
Indoor air quality is an important determinant of human health and comfort. However, the complexity of pollution sources and the multitude of parties responsible for creating indoor exposures makes the improvement of air quality difficult. The HVAC(Heating, Ventilating and Air-Conditioning) system is important facility to provide comfortable environment passenger service. The Ministry of Environment is established "Indoor Air Quality Management guidelines in Public Facilities"in December 2006. Hereupon, the train and the subway are included. In this research air quality in the Subway compartment has been measured. As a result, the concentrations of PM10 and $CO_2$ were reached to 93% and 61% of the regulation values, respectively. Thus, the indoor air qualities of subway have been proved that they satisfy the recommended guidelines by the Ministry of Environment.
Journal of the Korean Professional Engineers Association
/
v.34
no.5
/
pp.77-81
/
2001
The industrial accident in subway of late is increasingly coming to the front as a serious problem of society because a scale of industrial accident is a large size, and powerfulness, while the percent of accident is decreasing as a result of industrial facilities with the largeness of equipment, automation, and high horse-powering. In this paper, a study on the estimation of accident loss prevention cost and risk analysis in subway construction is proposed as an alternative to the techniques currently used in the general construction projects safety. Then the concept of risk evaluation using a risk assessment model is presented to drive value of risk and numerical example for risk analysis. A means for this does grasp the importance of educational factor by way of analyzing the causes of accident through statistical data of labor department, emphasizing the necessity and the importance of safety education, being helpful to act safety by decreasing insecure activity which ranks the majority of accident causes with putting the education program, form, method into practice that are suitable for a place of business.
Journal of the Korean Society of Hazard Mitigation
/
v.10
no.5
/
pp.1-7
/
2010
Since subway fire disaster at Daegu, Korea smoke control system and passengers evacuation distance has been focused to reform. Existing smoke control facilities need to expand volume of ventilation capacity however, the complicate subway station structure can hardly react dispersion of smokes from massive subway cabin fire. Smoke flow at platform level move upward thought vertical stairway and passengers evacuation goes with same direction. The victims of evacuees from subway station fire mainly due to exposure of heat radiation and smoke. The study demonstration the effect of downward evacuates stairway system by separating evacuation route to smoke movement pass way including saving times of evacuation.
In this study, the space gamma dose rates in the apartments structured with concrete were measured in accordance with construction year. In addition, the environmental radiation rates coming from the subway platforms and the road tunnels were analyzed in the equivalent dose by multiplying the absorbed dose with the radiation weighting factors. The space gamma dose rates measured in apartments were higher than those of outdoor which was $0.08{\sim}0.11uSv/h$ in the natural conditions. Especially, the older construction year is, the higher becomes space gamma dose rate. The average gamma dose rates in the subway platforms were measured. In the case of Busan and Daegu subway, the earlier the opening year is, the higher becomes dose rate. However, the dose rates of Seoul subway Lines were high overall, regardless of opening year. Seoul subway Line 6 showed the highest value of 0.21uSv/h. The gamma dose rate in road tunnels was higher than one of the outdoor and increased with opening year like as apartment. In dose rate comparison of the concrete structures with the outdoor, therefore, the space gamma dose rate of indoor is higher than one of the outdoor and the older structures have a higher dose rate.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.5
/
pp.74-79
/
2016
The Seoul Metropolitan Subway, which started operating in 1974, plays a major role in transporting 7,289 thousands passengers daily. This trend of a steadily increase in passengers from 2012 has increased the congestion rate because of the limited capacity and time. To solve this problem, Seoul city is consistently working on improving the subway facilities, such as the construction of a detour path. This project, however, has only a slight effect on improving the congestion rate and is too expensive to construct the facilities. Hence, this study suggests The Congestion Standardization System based on the IoT for improving the subway congestion rate. Based on the system, the expected effect analysis was performed, which resulted in a decrease in ride passengers from 34 to 20. In addition, this expected effect analysis shows that the number of subway vehicles can increase from 20 to 24. The suggested system will have a significant effect on the efficiency of the management system.
Lee Woo-Dong;Shin Jeong-Ryol;Kim Gil-Dong;Han Suk-Youn;Park Kee-Jun;Hong Jai-Sung;Ahn Tai-Ki;Lee Ho-Yong;Kim Jong-Wook
Proceedings of the KSR Conference
/
2003.10c
/
pp.322-326
/
2003
Dae-gu subway accident raise whole points in connection with safety facilities and operating of national urban transit system like rolling stocks, facilities, management of human. Rolling stock is made every effort for improvement of performance, guarantee of comfortableness, insurance of economical efficiency. But Security like safety of fire is not thoroughgoing enough. Especially, interior material has used although it is not prove its degree of safety. it is a main cause of Dae-gu subway accident. Safety regulation of urban transit vehicle that legislate for security in March 2000 does not applied manufacturing vehicles before in 2000. It has be prescribed in the regulations that incombustibles must be used. But detailed test standard related with incombustibles is not prescribe. Thus that regulation be required reinforcement of detailed test standard. Main cause of Dae-Gu subway accident is a fire in vehicle. However, many defects are found in infrastructure and operating vehicle of urban transit, such as inexperienced disposal of driver and CCC in early stage of the fire accident, unskilled opening and closing doors, insufficient escape facilities and safety facilities of a station house and tunnel, and incomplete communication system between vehicle and CTC, extraordinary step. Thus the aims of this study are prevention of urban transit accident, improvement plan of safety driving, and proposal of quick action plan through analysis of total faculty of vehicle.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.2
/
pp.437-445
/
2015
The layout of facilities, in relation to information and navigational displays, has great influence on subway satisfaction, and tend to vary depending on the types of subway platform and transit station. However, until now, few studies have covered such aspects as of yet. Starting from this viewpoint, the purpose of this study was to use an IPA analysis technique to analyze that satisfaction on the importance of facilities to aid in accessibility, such as elevators and escalators, transit amenities and information and navigational displays depending on the types of platform and transit station. To do so, we've classified 15 metropolitan stations according to types of platform and transit station and analyzed differences in user importance and satisfaction as well as improvements for platforms and transit stations of similar type. By the analysis results of this study, we've concluded that the proper selection and positioning of elevator and escalator facilities and information and navigational displays was important when designing the subway station according to platform type (separate platform) and or according to the transit station type (cross, L, T types) where pedestrian flow heavily intersected. We considered that such analysis results would be helpful in the design of new stations and the enhancement of existing stations pursuant to a new direction that minimizes user inconvenience, and that improvement items should be developed first according to the platform and transit station types, which would be helpful in enhancing the efficiency of the subway improvement cost.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.21
no.3
/
pp.193-198
/
2003
The population is increased in the area of a subway station because the accessibility of passengers is improved. Therefore, facilities for commercial purpose are concentrated in this area. To develop the station area as the center among the most urbanized area, overall mater plan should be constructed far the station area. This study was to construct web server for management a variety of 3D spatial object database of station areas using GIS and web 3D technology. These results will be used to manage efficiently a urban space by the connection of a subway station and a adjacent facilities.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.