• Title/Summary/Keyword: Subway dust

Search Result 54, Processing Time 0.018 seconds

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (열차운행속도 상승에 따른 레일마모 및 캔트조정 연구)

  • Shin, Gil-Cheol;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1121-1128
    • /
    • 2007
  • Subway routes $1{\sim}4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (속도 상승에 따른 캔트조정 사례 분석)

  • Shin, Gil-Cheol;Yang, Hoe-Seong;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.151-157
    • /
    • 2008
  • Subway routes $1\sim4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

Design and Development of Monitoring System for Subway Station based on USN (USN 기반의 지하역사 모니터링 시스템의 설계 및 개발)

  • Lee, Seok-Cheol;Jeong, Shin-Il;Kim, Chang-Soo
    • Journal of Korea Multimedia Society
    • /
    • v.12 no.11
    • /
    • pp.1629-1639
    • /
    • 2009
  • This paper describes the environmental monitoring system for supporting comfortable subways based on USN. Our development system includes the sensor field based on integrated sensor, monitoring system for supporting the local and remote monitoring and middle-ware performs the collecting, analyzing, and storing the data. In this paper, we installed the temperature, humidity, micro-dust sensor and water-level sensor for supporting the rail-roads and make up the integrated sensor enables to reuse the analog device from 4~20mA output with connection of wireless sensor device. Middleware includes the modules of collecting, analysis, and storing the data and monitoring system supports the local for administrator and remote monitoring for citizen services based on web. The middleware and monitoring in this paper is comprised of some components can reuse and support the change of application and sensors. Our development system supports the mobility of sensor devices and distributes system. Data collection and management function supported by middleware will use assessment.

  • PDF

Characteristics of Wind Speed and PM10 Concentration underneath Railway Trains (도시철도 차량 하부의 풍속 및 미세먼지 농도 특징)

  • Kim, Jong Bum;Woo, Sang Hee;Jang, Hong-Ryang;Chou, Jin-Won;Hwang, Moon Se;Park, Hyung-Koo;Yoon, Hwa Hyeon;Jung, Joon-Sig;Bae, Gwi-Nam
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.11-19
    • /
    • 2017
  • Since operation of railway trains is a major source of particle pollution in tunnel air, a particle removal device can be an effective measure to remove wear particles. To obtain design conditions of the particle removal device that will be installed underneath the railway trains, the wind speed and particle concentration underneath the trains were investigated using a three-dimensional ultrasonic anemometer and a DustTrak aerosol monitor, respectively. The measurements were made for the trains running on Seoul Metropolitan Subway Line 5 on February 10, 2015. The data were analyzed according to the track geometry (straight, curved) and train speed pattern (acceleration, cruising, and deceleration) between stations. Train speed was also analyzed. The average wind speed and $PM_{10}$ concentration underneath the trains were ~30% of the train speed and ${\sim}200{\mu}g/m^3$ for both straight and curved sections. Average $PM_{10}$ concentration for deceleration sections was higher than that for acceleration sections.