A Study on Comparative Analysis of Power Consumption Characteristics and the revulsion of investment on the application of a BESS in Subway Substation (도시철도 변전소 단위구간의 전력사용 실태 및 피크제어용 BESS 도입에 따른 경제성 분석)

  • Jung, Hyun-Ki;Kim, Se-Dong;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.85-90
    • /
    • 2014
  • This paper shows a reasonable demand power, that was made by the systematic and statistical way considering actual conditions, such as investigated transformer capacity and peak power for the last 6 years of subway substation customer as to AMR. In this dissertation, it is necessary to analyze the key features and general trend from the investigated data. It made an analysis of the feature parameters, such as average, standard deviation, median, maximum, minimum and thus it was carried by the linear and nonlinear regression analysis. And we studied on the application of a BESS. Analysis showed that the revulsion of capital is about 3 years and 4 months.

Modelling Voltage Variation at DC Railway Traction Substation using Recursive Least Square Estimation (순환최소자승법을 이용한 직류도시철도 변전소의 가선전압변동 모델링)

  • Bae, Chang-Han
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.20 no.6
    • /
    • pp.534-539
    • /
    • 2015
  • The DC overhead line voltage of an electric railway substation swings depending on the accelerating and regenerative-braking energy of trains, and it deteriorates the energy quality of the electric facility in the DC railway substation and restricts the powering and braking performance of subway trains. Recently, an energy storage system or a regenerative inverter has been introduced into railway traction substations to diminish both the variance of the overhead line voltage and the peak power consumption. In this study, the variance of the overhead line voltage in a DC railway substation is modelled by RC parallel circuits in each feeder, and the RC parameters are estimated using the recursive least mean square (RLMS) scheme. The forgetting factor values for the RLMS are selected using simulated annealing optimization, and the modelling scheme of the overhead line voltage variation is evaluated through raw data measured in a downtown railway substation.

Developing electric railway load pattern inspection program (전철 변전소 전력부하패턴 점검 프로그램 개발)

  • Jeon, Yong-Joo;Lee, Gi-Chun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.893-898
    • /
    • 2007
  • At present, one of the big characteristics in electric power market in korea is unique seller but in the near future competitions are expected in the market. so additional service for the electric power are expected. Also with development of IT technology, remote inspection for power usage are possible so as consumption pattern analysis. KORAIL is one of the biggest consumer in electric power market so it is necessary to investigate power consumption pattern. This paper presents electric load consumption pattern for representative substation like urban subway, high-speed train, industrial line and simulation program for electric power rate definition program based on billing system database. Base on the substation annual power usage DB data, the characteristic of the substation power consumption are investigated and effective electrical billing system are compared each other. Through this program it is verified that we can save more then several hundred million won for a year.

  • PDF

Power Demand Forecasting in the DC Urban Railway Substation (직류 도시철도 변전소 수요전력 예측)

  • Kim, Han-Su;Kwon, Oh-Kyu
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.11
    • /
    • pp.1608-1614
    • /
    • 2014
  • Power demand forecasting is an important factor of the peak management. This paper deals with the 15 minutes ahead load forecasting problem in a DC urban railway system. Since supplied power lines to trains are connected with parallel, the load characteristics are too complex and highly non-linear. The main idea of the proposed method for the 15 minutes ahead prediction is to use the daily load similarity accounting for the load nonlinearity. An Euclidean norm with weighted factors including loads of the neighbor substation is used for the similar load selection. The prediction value is determinated by the sum of the similar load and the correction value. The correction has applied the neural network model. The feasibility of the proposed method is exemplified through some simulations applied to the actual load data of Incheon subway system.

Performance Evaluation of Evacuation in Subway Station Stairs using Movement Recording Apparatus (이동정보 기록장치를 이용한 전철 계단 피난평가 연구)

  • Kim, Young Gil;Kim, Eung Sik
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.6
    • /
    • pp.123-127
    • /
    • 2018
  • Recent catastrophic accidents at the underground subway stations in South Korea have proven that the subway evacuation is an important safety concern. Previous studies have used commercial programs for safety assessment or have been focused on development of computing algorithms rather than the basic analysis data which form the foundation of studies. In this study, we designed a new movement recording apparatus which measured and analyzed crowd movements including but not limited to moving velocity, specific flow rate and crowd density. Moreover, We propose new effective analysis method for evacuation studies with this apparatus.

A Study on a Substation Static Load Model Including the Mobility of a Railway Load (철도 부하의 이동성을 반영한 변전소 정태부하모델링 수립에 대한 연구)

  • Chang, Sang-Hoon;Youn, Seok-Min;Kim, Jung-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.315-323
    • /
    • 2015
  • Nowadays, it is expected that mobility loads such as electric railways and electric vehicles will be penetrated gradually and affect on the power system stability by their load characteristics. Various researches have been carried out about electric vehicles for the recent decade though the load of electric railway could be forecasted because of the specified path and timetable, is a field with a long historic background. Some precise 5th polynomial equations are required to analyze the power system stability considering mobility load to be increased in the immediate future while the electric railway dispatching simulator uses load models with constant power and constant impedance for the system analysis. In this paper, seasonal urban railway load models are established as the form of 5th polynomial equations and substation load modeling methods are proposed merging railway station load models and general load models. Additionally, load management effects by the load modeling are confirmed through the case studies, in which seasonal load models are developed for Seoul Subway Line No. 2, Gyeongui Line and Airport Railroad and the substation load change is analyzed according to the railway load change.

A Study on the Integrated Diagnosis System for Unmanned Substation and Transmission Network in Local Control Center (지역급전 제어소의 무인변전소와 송전망 통합진단 시스템에 관한 연구)

  • Lee, Heung-Jae;Lim, Chan-Ho;Choi, Gi-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 1995.11a
    • /
    • pp.516-518
    • /
    • 1995
  • This paper presents an integrated fault diagnosis expert system for power systems. The proposed system diagnoses various faults occurred in both substations and transmission lines even in the case that substation fault is spreaded over the network. To cope with this problem, A meta-inference method is proposed. This scheme shares same the data structure with the pre-developed intelligent operational aid expert system installed in a practical sub-control center, without modification. This advanced integrated diagnosis system is developed using a low cost personal computer owing to the special modular programming technique. Case studies show a promising possibility of the proposed method.

  • PDF

Peak Power Optimization for Metro Railway using by Source Impedance Control (전원 임피던스 제어를 통한 도시철도 최대전력 최적화)

  • Kim, Han-Su;Kwon, Oh-Kyu
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.6
    • /
    • pp.841-849
    • /
    • 2014
  • Urban railway with rectifiers is connected by parallel circuits because substations are joined by the power rail. Thus, if an input voltage of a substation is increased, then the voltage of rectifiers is also increased, and which leads to an increase in the peak power of the substation. To solve this problem, this paper proposes a new method reducing the peak power of substations by adjusting the operation number of rectifiers. Its feasibility is exemplified by some simulations performed for Incheon subway Line 1 and GA(Genetic Algorithm) method has been applied to obtain the optimal input. Simulation results show that peak power can significantly be reduced using the method proposed in this paper.

Study on capacity calculation of regenerative inverter for DC electrified transit substation (직류전기철도변전소의 회생인버터 용량산정에 관한 연구)

  • Bae, C.H.;Han, M.S.;Kim, Y.G.;Jang, S.J.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1607-1609
    • /
    • 2005
  • This paper presents capability calculation methods for regenerative inverter in DC electrified transit system. The proposed method uses a train performance and power simulation tool to calculate the regenerative power generated in the DC substation and decide the capability of regenerative inverter. The capability of regenerative inverters for Seoul subway line 5, 6, 7, and 8 has been calculated.

  • PDF

The Development of GTO circuit breaker for subway substation (지하철 변전소용 GTO 싸이리스터 차단기 개발)

  • Yun, J.H.;Choi, S.K.;Jung, M.K.
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.524-526
    • /
    • 1997
  • High speed DC circuit breakers (HSCB) are indispensable for protection of DC electric subway substations from fault current. However, the HSCB has mechanical contact to wear, which requires rather frequent maintenance, we have succeeded in developing and manufacturing a GTO DC circuit breaker using GTOs and ZnO varistors. In this paper, we describes the outline of the system itself, its characteristics and test data.

  • PDF