• Title/Summary/Keyword: Subsystem test

Search Result 139, Processing Time 0.028 seconds

Reliability Analysis Procedures for Repairable Systems and Related Case Studies (수리 가능 시스템의 신뢰성 분석 절차 및 사례 연구)

  • Lee, Sung-Hwan;Yum, Bong-Jin
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.9 no.2 s.25
    • /
    • pp.51-59
    • /
    • 2006
  • The purpose of this paper is to present reliability analysis procedures for repairable systems and apply the procedures for assessing the reliabilities of two subsystems of a specific group of military equipment based on field failure data. The mean cumulative function, M(t), the average repair rate, ARR(t), and analytic test methods are used to determine whether a failure process follows a renewal or non-renewal process. For subsystem A, the failure process turns out to follow a homogeneous Poisson process, and subsequently, its mean time between failures, availability, and the necessary number of spares are estimated. For subsystem B, the corresponding M(t) plot shows an increasing trend, indicating that its failure process follows a non-renewal process. Therefore, its M(t) is modeled as a power function of t, and a preventive maintenance policy is proposed based on the annual mean repair cost.

Operational Status of 20mN class Ion Engine Subsystem for ETS-VIII

  • Ozaki, Toshiyuki;Kasai, Yukikazu;Nakagawa, Takafumi;Kajiwara, Kenichi;Ikeda, Masafumi
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.03a
    • /
    • pp.511-518
    • /
    • 2008
  • The Engineering Test Satellite VIII(ETS-VIII) of Japan Aerospace Exploration Agency(JAXA) uses a 20mN class xenon ion engine subsystem(IES) for North-South Station Keeping(NSSK). The IES was modified for a larger satellite with longer lifetime based on the former IES. ETS-VIII, a three-ton class geosynchronous satellite with 10 years bus lifetime, was launched 18 Dec. 2006 JST; it reached the planned orbit and all bus systems were checked out. The IES showed good results and is now under normal operation. The total accumulated operation time of the IES in orbit was about 2300 hours till $19^{th}$ Dec. 2007.

  • PDF

Development of Reliability Analysis Procedures for Repairable Systems with Interval Failure Time Data and a Related Case Study (구간 고장 데이터가 주어진 수리가능 시스템의 신뢰도 분석절차 개발 및 사례연구)

  • Cho, Cha-Hyun;Yum, Bong-Jin
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.5
    • /
    • pp.859-870
    • /
    • 2011
  • The purpose of this paper is to develop reliability analysis procedures for repairable systems with interval failure time data and apply the procedures for assessing the storage reliability of a subsystem of a certain type of guided missile. In the procedures, the interval failure time data are converted to pseudo failure times using the uniform random generation method, mid-point method or equispaced intervals method. Then, such analytic trend tests as Laplace, Lewis-Robinson, Pair-wise Comparison Nonparametric tests are used to determine whether the failure process follows a renewal or non-renewal process. Monte Carlo simulation experiments are conducted to compare the three conversion methods in terms of the statistical performance for each trend test when the underlying process is homogeneous Poisson, renewal, or non-homogeneous Poisson. The simulation results show that the uniform random generation method is best among the three. These results are applied to actual field data collected for a subsystem of a certain type of guided missile to identify its failure process and to estimate its mean time to failure and annual mean repair cost.

A study on the Reliability Experiment and the Structural Improvement of Sliding Cover (슬라이딩 커버의 신뢰성 시험 및 구조개선 연구)

  • Song Jun Yeob;Kang Jae Hun;Kim Tae Hyung;Kim Ok Koo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.22 no.7 s.172
    • /
    • pp.146-154
    • /
    • 2005
  • Recently, the high-speed and intelligence technology of machine tools are developed for the high efficiency of productivity Under the operating condition from the high-speed of machine tools, the various failure modes can occur in core units of manufacturing system. Therefore it is for the reliability concept of machine tool to be required in a design level. And the above-stated technology must be accommodated in the feeding and spindle subsystem, etc those are the core units of machine tools. In this study, we are developed the test-bed of sliding cover (C-plate) in order to evaluating reliability and estimating failure modes of feeding subsystem under operating conditions. The reliability experiment using the developed test-bed and the additional structural analysis executed on single and double structure. We found out the weak parts of sliding cover and were able to predict a life cycle from the experiment results. In this study, we propose the new C-plate model with double link structure to apply the high-speed machine tool in the fundamental guideline.

Design and development of VDL Mode 2 System (VDL 모드 2 데이터링크 시스템 설계 및 구현)

  • Bae, Joong-Won;Kim, Hyoung-Kyoung;Kim, In-Kyu;Kim, Tae-Sik
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.30-39
    • /
    • 2008
  • This paper presents the result of VDL Mode 2 system design and implementation with AOA (ACARS Over AVLC) protocol based on international VDL Mode 2 specifications for the bit-oriented ATS applications. The designed VDL Mode 2 system is composed of airborne and ground subsystem. Airborne subsystem consists of VDR, CMU and Ground system consists of Ground Station and DSP. For the test of whole system, simplified CPDLC, ADS and AFN applications are implemented in test equipments.

  • PDF

EMC Safety Margin Verification for GEO-KOMPSAT Pyrotechnic Systems

  • Koo, Ja-Chun
    • International Journal of Aerospace System Engineering
    • /
    • v.9 no.1
    • /
    • pp.1-15
    • /
    • 2022
  • Pyrotechnic initiators provide a source of pyrotechnic energy used to initiate a variety of space mechanisms. Pyrotechnic systems build in electromagnetic environment that may lead to critical or catastrophic hazards. Special precautions are need to prevent a pulse large enough to trigger the initiator from appearing in the pyrotechnic firing circuits at any but the desired time. The EMC verification shall be shown by analysis or test that the pyrotechnic systems meets the requirements of inadvertent activation. The MIL-STD-1576 and two range safeties, AFSPC and CSG, require the safety margin for electromagnetic potential hazards to pyrotechnic systems to a level at least 20 dB below the maximum no-fire power of the EED. The PC23 is equivalent to NASA standard initiator and the 1EPWH100 squib is ESA standard initiator. This paper verifies the two safety margins for electromagnetic potential hazards. The first is verified by analyzing against a RF power. The second is verified by testing against a DC current. The EMC safety margin requirement against RF power has been demonstrated through the electric field coupling analysis in differential mode with 21 dB both PC23 and 1EPWH100, and in common mode with 58 dB for PC23 and 48 dB for 1EPWH100 against the maximum no-fire power of the EED. Also, the EMC safety margin requirement against DC current has been demonstrated through the electrical isolation test for the pyrotechnic firing circuits with greater than 20 dB below the maximum no-fire current of the EED.

Development of the Ku band Antenna Subsystem for the CBS Payload System (Ku 대역 통신방송위성(CBS) 탑재체 안테나 개발)

  • 윤소현;김영철;이점훈;박종흥;이성팔;우형제
    • Proceedings of the IEEK Conference
    • /
    • 2003.07a
    • /
    • pp.258-261
    • /
    • 2003
  • 한반도와 그 주변 지역에 멀티미디어 서비스를 제공하기 위해 통신방송위성(CBS: Communications and Broadcastings Satellite) 탑재체의 Ku 대역 안테나가 개발되었다. Ku 대역 안테나는 성능 요구 조건을 만족하도록 설계 되었으며 일련의 시험을 통해 성능 검증이 이루어졌다. 일련의 시험은 초기 성능 시험(IFPT: Initial Functional Performance Test), 환경 시험, 최종 성능 시험(FFPT: Final Functional Performance Test)으로 구성되며 이를 통해 반사 손실, EOC(Edge Of Coverage) 이득, 사이드로브 레벨, 교차 편파 분리도등의 전기적 성능과 발사 및 우주 환경에서 강건함이 확인되었다.

  • PDF

DEVELOPMENT OF KITSAT-1 AND 2 MECHANICAL SYSTEM AND RESULTS OF ENVIRONMENT TEST (우리별 1, 2호의 기계구조 개발 및 환경시험 결과)

  • 배정석;이동우;이상현;박성동;최순달
    • Journal of Astronomy and Space Sciences
    • /
    • v.13 no.2
    • /
    • pp.94-104
    • /
    • 1996
  • The satellite experiences the launch environment such as vibration, acceleration, shock induced by rocket and the orbit environment such as high vacuum, no gravity, high temperature and cryogenic. Therefore, the satellite should be designed and manufactured to endure such environments. Also, special care must be taken on the assembly of parts and subsystem. Finally, we describe the environment test of microsatellite to ensure the reliable operation during launch period as well as in-orbit operation.

  • PDF

THE IMPLEMENTATION METHOD AND TEST OF TELEMETRY TREND ANALYSIS IN KOMPSAT-2

  • Kim Myungja;Jung Won-Chan;Kim Jae-Hoon
    • Bulletin of the Korean Space Science Society
    • /
    • 2004.10b
    • /
    • pp.235-238
    • /
    • 2004
  • In this paper, we will present the implementation method of telemetry trend analysis in KOMPSAT-2 (KOrea Multi Purpose SATellite II), and then we will show the test result of trend analysis with telemetry data. Trend Analysis function is one of the module of Satellite Operations Subsystem and that analyzes the telemetry data of satellite state of health and telemetry trend for operation support. With this system many clients can analyze telemetry data simultaneously.

  • PDF

INSTALLATION AND PERFORMANCE VERIFICATION OF VLBI CORRELATION SUBSYSTEM (VLBI 상관서브시스템의 현장설치 및 시험결과 고찰)

  • Oh, Se-Jin;Roh, Duk-Gyoo;Yeom, Jae-Hwan;Park, Sun-Youp;Kang, Yong-Woo;Oh, Chung-Sik;Oyama, Tomoaki;Kawaguchi, Noriyuki;Kobayashi, Hideyuki;Kawakami, Kazuyuki
    • Publications of The Korean Astronomical Society
    • /
    • v.27 no.1
    • /
    • pp.1-16
    • /
    • 2012
  • In this paper, we describe the installation of VLBI Correlation Subsystem (VCS) main product and its performance at the Korea-Japan Correlation Center (KJCC). The VCS main product was installed at KJCC in August 2009. For the overall performance evaluation of VCS, playbacks, Raw VLBI Data Buffer (RVDB) system, and Data Archive (DA) system were installed together. The VCS main product was connected between RVDB and DA, and the correlation results were put into the DA to confirm the normal operation of VCS 16 station mode configuration. The evaluation test was first performed with 4 station mode, same as the factory test of VCS main product. Based on the results of 4 station mode, the same evaluation test was conducted for 16 station mode of VCS. We found that the correlation results of VCS were almost similarly compared to those of the Mitaka FX Correlator. Through the test results, we confirmed that the problems such as spectrum errors, delay parameter processing module and field programmable gate array errors in antenna unit, which were generated at the factory test of VCS main product, were clearly solved. And we verified the performance and connectivity of VCS by obtaining the expected correlation results and we also confirmed that the performance of VCS was sufficient for real VLBI observation data in both 4 and 16 station modes.