• Title/Summary/Keyword: Substations

Search Result 295, Processing Time 0.023 seconds

Design of Automatic Inspection System for Maintenance of Unmanned Monitoring Facility (무인감시설비 유지보수를 위한 자동점검시스템 설계)

  • Moon, Chaeyoung;Kim, Semin;Ryoo, Kwangki
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2018.05a
    • /
    • pp.515-517
    • /
    • 2018
  • Access to public facilities such as substations, dams and railway facilities is strictly controlled, and unmanned surveillance equipment has been introduced and operated recently due to the development of IT technology and the government's cost reduction policy. However, if an unmanned surveillance system is broken, surveillance space, information leakage caused by intruders, and damage to facilities may occur. Also, it is necessary to check periodical visit by the manager in order to check the surveillance facilities, which causes additional management costs. In order to solve this problem, we designed a system to check the operation status of the unmanned monitoring facility in real time, attempt to recover automatically when a problem occurs, and notify the administrator of the problem. The designed system consists of an NVR that receives and judges information such as image, sound, and lighting condition, and a control device that detects and restores the state of the unmanned monitoring facility. The system proposed in this paper is expected to contribute to the improvement of the economic efficiency due to the minimization of surveillance space due to the failure of the unmanned monitoring facility and the reduction of the inspection cost.

  • PDF

Simplified GIS Diagnostic SYSTEM (간이형 상시 GIS 진단장치)

  • Jeong, J.K.;Choi, Y.J.;Kang, C.I.;Jang, H.K.;Gwak, H.S.
    • Proceedings of the KIEE Conference
    • /
    • 2006.05a
    • /
    • pp.74-77
    • /
    • 2006
  • This research is focused on the development of GIS Diagnostic SYSTEM to prevent accidents beforehand by inspecting the internal defects of GIS (Gas Insulated Switchgear) which is a main power-facility for substations. GIS Diagnostic SYSTEM is categorized as 'Real time on-line test type' and 'Portable test type' depending on the types of testing, it uses PD(partial discharge) which mostly incurs in GIS internal defects, to inspect. As of now, mostly foreign equipments are imported for use due to the lack of the technology localization, and these are installed and operated on only some parts of highly-graded GIS power-facilities such as in 76skv or 345kv for its being expensive. Furthermore, other than foreign equipments being costly, it also has a weak point of very long unavailability in case of Diagnostic system break-down while using, because it takes a comparatively long period of corrective maintenance precesses. We have localized to develop personal real-time multi -functional GIS Diagnostic system which can test on all GIS power-facility comprehensively and economically therefore overcome all these problems mentioned above, a market expansion is expected from the decrease of price and replacing the import equipments in the future. As the equipment was developed to be Personal for the simple ways of installing and utilizing, it can be operated without any complex cable installation like other existing GIS Diagnostic system requires, therefore also decrease the cost of cable installation.

  • PDF

Evaluation of Implementation Potential of Offshore Wind Farm Capacity in Korea Using National Wind Map and Commercial Wind Farm Design Tool (국가바람지도와 상용 단지설계 프로그램을 활용한 국내 해상풍력단지 공급가능 잠재량 산정)

  • Song, Yuan;Kim, Chanjong;Paek, Insu;Kim, Hyungoo
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.4
    • /
    • pp.21-29
    • /
    • 2016
  • Commercial wind farm design tools and the national wind map are used to determine the implementation potential of offshore wind power in Korea in this study. For this, the territorial waters of Korea were divided into nine analysis regions and a commercial CFD code was used to obtain wind resource maps at 100m A.S.L. which is the hub height of a 5MW wind turbine used in this study. With the wind resource obtained, factors including water depth, distance from substations, minimum and maximum capacity of a wind farm, distance between turbines and wind farms were considered to determine wind power potential. Also, the conservation areas, military zones, ports, fishing grounds, etc. were considered and excluded. As the result, a total capacity of 6,720 MW was found to be the implementation potential and this corresponds to $3.38MW/km^2$ in API. Also if the distance from the substation is not considered, the potential increased to be 10,040 MW. This offshore wind farm potential is considered enough to satisfy the target of wind farm capacities in the 7th national plan for electricity demand and supply.

Analysis of Harmonic Effects on Substation Power System and its Countermeasure (지하철 전력계통의 고조파 영향 분석 및 그 대책에 관한 연구)

  • Song, Jin-Ho;Hwang, Yu-Mo
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.51 no.4
    • /
    • pp.210-220
    • /
    • 2002
  • We analysised the effect of harmonics on electric machines of substation power system barred on quantitatively measured harmonics and proposed the methods for prevention of harmonics through checking on transformer, rectifier and cable's capacities against harmonics with reference to KEPCO's electricity service standard. In order to analysis harmoninics of silicon rectifier that is power source in DC substation, computer simulations for a substation with TR of high voltage distribution switchboard are performed. Simulation results show that the total harmonic distortion factor becomes smaller for TR primary and receiving points in order rather than silicon rectifier which is harmonic generation source so that the harmonics generated frets each rectifier are outflowed to power supply and high voltage distribution switchboard The result of higher distortion factors of voltage and current for rectifier with 100% load than those with 50 % and 30% indicates that the waveform of voltage and current for the real substation power system at the office-going and the closing hours with heavy loads might be more distorted. As proposed methods for harmonic reduction, the conventional 6 pulse-type for substation is required to be replaced by 12 pulse-type for reduction of 5th and 7th harmonics. The active filter rather than the passive filter is more effective due to severe variance of rectifier loads, but the high cost is price to be paid. In view of installation area and costs, the use of 12 pulse-type transformer is desirable and then the parallel transformer and the rectifier within the substation must be replaced at the same time. Other substations with parallel feeder can use 6 pulse-type transformer.

Design of an Algorithm for the Validation of SCL in Digital Substations

  • Jang, B.T.;Alidu, A.;Kim, N.D.
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.2
    • /
    • pp.89-97
    • /
    • 2017
  • The substation is a critical node in the power network where power is transformed in the power generation, transmission and distribution system. The IEC 61850 is a global standard which proposes efficient substation automation by defining interoperable communication and data modelling techniques. In order to achieve this level of interoperability and automation, the IEC 61850 (Part 6) defines System Configuration description Language (SCL). The SCL is an XML based file format for defining the abstract model of primary and secondary substation equipment, communications systems and also the relationship between them. It enables the interoperable exchange of data during substation engineering by standardizing the description of applications at different stages of the engineering process. To achieve the seamless interoperability, multi-vendor devices are required to adhere completely to the IEC 61850. This paper proposes an efficient algorithm required for verifying the interoperability of multi-vendor devices by checking the adherence of the SCL file to specifications of the standard. Our proposed SCL validation algorithm consists of schema validation and other functionalities including information model validation using UML data model, the Vendor Defined Extension model validation, the User Defined Rule validation and the IED Engineering Table (IET) consistency validation. It also integrates the standard UCAIUG (Utility Communication Architecture International Users Group) Procedure validation for quality assurance testing. Our proposed algorithm is not only flexible and efficient in terms of ensuring interoperable functionality of tested devices, it is also convenient for use by system integrators and test engineers.

A Study on DC Traction Power Supply System Using PWM Converter (PWM컨버터를 적용한 경전철 전력공급시스템에 관한 연구)

  • Kim, Joorak;Park, Chang-Reung;Park, Kijun;Kim, Joo-Uk
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.29 no.4
    • /
    • pp.250-254
    • /
    • 2016
  • Currently, power conversion system which converts AC to DC Power is applied in domestic urban railway. The diode rectifier is used in most of them. However the diode rectifier can not control the output voltage and can not regenerate power as well. On the other hand, PWM (pulse width modulation) converter using IGBT (isolated gate bipolar transistor) can control output voltage, allowing it to reduce the output voltage drop. Moreover the Bi-directional conduction regenerates power which does not require additional device for power regeneration control. This paper compared the simulation results for the DC power supply system on both the diode rectifier and the PWM converter. Under the same load condition, simulation circuit for each power supply system was constructed with the PSIM (performance simulation and modeling tool) software. The load condition was set according to the resistance value of the currently operating impedance of light rail line, and the line impedance was set according to the distance of each substations. The train was set using a passive resistor. PI (proportional integral) controller was applied to regulate the output voltage. PSIM simulation was conducted to verify that the PWM Converter was more efficient than the diode rectifier in DC Traction power supply system.

Development and Simulation Verification of Operation System for Mobile ESS Test Equipment (ESS 이동형 시험장비용 운영시스템의 개발과 모의검증)

  • Shin, Je-Seok;Han, Hyun-Gyu;Kim, Jin-Tae;Lee, Seung-Min;Park, Chan-Wook;Lim, Geon-Pyo
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.3
    • /
    • pp.168-174
    • /
    • 2018
  • The performance test for 376MW ESS for frequency regulation currently operating in 13 substations is conducted based on the test procedure in the first and second steps. In the first step, components of ESS is moved to the certification authority where the test equipment is located in order to be proceeded with the test. In the second step, the performance test is conducted manually for the ESS equipments installed on site using the movable measurement equipment, and thus it can only be performed on some limited test items and requires a lot of time and manpower. Therefore, mobile test equipment for ESS(MOTES) is being developed that can perform automatically more test items for ESS in the field using the MOTES, and reduce manpower and time. To do this, an algorithm and a prototype of the operating system(MOS) are also being developed that can control MOTES automatically. In this paper, a development of the MOS prototype is introduced and then a simulation is performed to verify the prototype and its algorithm before the field demonstration.

Seismic mitigation of substation cable connected equipment using friction pendulum systems

  • Karami-Mohammadi, Reza;Mirtaheri, Masoud;Salkhordeh, Mojtaba;Mosaffa, Erfan;Mahdavi, Golsa;Hariri-Ardebili, Mohammad Amin
    • Structural Engineering and Mechanics
    • /
    • v.72 no.6
    • /
    • pp.785-796
    • /
    • 2019
  • Power transmission substations are susceptible to potential damage under seismic excitations. Two of the major seismic failure modes in substation supplies are: the breakage of brittle insulator, and conductor end fittings. This paper presents efficient isolation strategies for seismically strengthening of a two-item set of equipment including capacitive voltage transformer (CVT) adjacent to a Lightning Arrester (LA). Two different strategies are proposed, Case A: implementation of base isolation at the base of the CVT, while the LA is kept fixed-base, and Case B: implementation of base isolation at the base of the LA, while the CVT is kept fixed-base. Both CVT and LA are connected to each other using a cable during the dynamic excitation. The probabilistic seismic behavior is measured by Incremental Dynamic Analysis (IDA), and a series of appropriate damage states are proposed. Finally, the fragility curves are derived for both the systems. It is found that Friction Pendulum System (FPS) isolator has the potential of decreasing flexural stresses caused by intense ground motions. The research has shown that when the FPS is placed under LA, i.e. Case B (as oppose to Case A), the efficiency of the system is improved in terms of reducing the forces and stresses at the bottom of the porcelain. Several parametric studies are also performed to determine the optimum physical properties of the FPS.

DNP3 Protocol Security and Attack Detection Method (DNP3 프로토콜 보안 현황 및 공격 탐지 방안)

  • Kwon, Sung-Moon;Yoo, Hyung-Uk;Lee, Sang-Ha;Shon, Tae-Shik
    • Journal of Advanced Navigation Technology
    • /
    • v.18 no.4
    • /
    • pp.353-358
    • /
    • 2014
  • In the past, security on control system was guaranteed by isolation of control system networks from external networks. However as devices of the control systems became more various and interaction between the devices became necessary, effective management system for such network emerged and this triggered connection between control system networks and external system networks. This made management of control system easier but also made control system exposed to various cyber attack threats, Therefore researches on appending security measures on each protocols are in progress. This paper focused on DNP(distributed network protocol)3 protocol which is used for communication between control center and substations. It describes characteristics of DNP3 protocol and research on adding security elements to the protocol. It also analyzed known vulnerabilities of DNP3 protocol and proposed data mining methodology for detecting such vulnerabilities.

Synchronized Sampling Structure applied HW/SW platform for LAN-based Digital Substation Protection (LAN 기반 디지털 변전소 보호를 위한 동기 샘플링 구조적용 HW/SW 플랫폼 기술)

  • Son, Kyou Jung;Nam, Kyung-Deok;An, Gi Sung;Chang, Tae Gyu
    • Journal of IKEEE
    • /
    • v.24 no.1
    • /
    • pp.178-185
    • /
    • 2020
  • This paper proposes precise time synchronization-based synchronized sampling structure applied HW/SW platform for LAN-based protection of future digital substations. The integrated software of the proposed platform includes IEC 61850 protocol, IEEE 1588 precision time protocol and synchronized sampling structure. The proposed platform expected to provide a basis of an application of future distributed sensing data-based protection and control methods by providing synchronized measurement among IEDs. The implementation of the proposed HW/SW platform technique was performed using TMDXIDK572 multi-core/multi-processor evaluation module and its time synchronization performance and synchronized sampling function were confirmed through the performance tests.