• 제목/요약/키워드: Substations

검색결과 295건 처리시간 0.021초

Selection of Transformer for the Augmentation of an Existing AIS EHV Substation in Hilly Terrain at 3000m+ Altitude

  • Kim, Kwang-Soo;Kang, Byoung-Wook;Kim, Jae-Chul
    • 조명전기설비학회논문지
    • /
    • 제26권12호
    • /
    • pp.28-36
    • /
    • 2012
  • Augmentation of existing EHV substations located in hilly terrain and at high altitude require many different considerations as compared to substations located in plain areas and at lower altitude. Owing to high altitude and steep terrain, meticulous engineering and preparations are required, considering the actual available space at the existing substation. Historical fault events too must be considered to enhance reliability and performance of the substation equipment. This paper proposes ways to augment the existing 2 banks of 20MVA, 220/66kV power transformers ($3{\times}6.67MVA$, single-phase) to $2{\times}50$/63MVA, 220/66kV power transformers to meet continuously increasing demand of the capital city over the next 20 years. Upgrading and augmentation of existing substations, especially the main transformers and associated equipment, require replacement with minimum or no disturbance to the existing power supply system. Considerations should also be made during engineering and design, the operational flexibilities, maintenance aspects, future expandability and value addition, in terms of reliability and space usage of the existing substation.

전력계통에서의 초전도 한류기 설치를 위한 기초적 연구 (Preliminary investigation of a proposed site for SFCL installation in the power systems)

  • 김용학;윤용범;최효상;현옥배
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제4권2호
    • /
    • pp.38-41
    • /
    • 2002
  • We have conducted Preliminary investigation to propose a suitable site for superconducting fault current limiter (SFCL) installation in the KEPCOs 154kV grid This investigation limited the application SFCL to the bus-tie position of the grid in the Seoul area. First, we calculated maximum Potential fault current for all substations. Then, among substations where the fault current exceeds the CB capacity, rye selected two substations where buses are being operated untied. For the selected two. S S/S and M S/S. fault currents at the M S/S were estimated to be 22.5㎄ and 24.3㎄ for two buses untied respectively, but 44.2㎄ if buses were tied. Simulation using a hypothetical SFCL of 5 Ohm impedance showed that it controlled the fault current up to 20. 1㎄ for bus-tie Position, 28.4㎄ and 29.9㎄ for both buses. respectively, each of which are under the capacity of the currently installed 31.5㎄ GIS. For both substations a SFCL with 5 Ohm impedance successfully controls the fault current under the CB capacity, and 10 Ohm SFCL may be recommendable to maximize the SFCL effect.

도심지 변전소 지락사고시 인근 저항성간섭 영향 해석 (Analysis of Conductive Interference Around Substation Exclusively Fed by Cables Under Ground Fault Condition)

  • 최종기;이동일;김재준;유연표;정창수;김경철
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권12호
    • /
    • pp.592-596
    • /
    • 2005
  • Recently, substations have been constructed in GIS (Gas Insulated Switchgear) and indoor type because of the increasing difficulties of securing locations. In case of urban substations, it is also common that the substations are exclusively fed by underground cables. Sometimes, the infrastructures in urban area, such as communication facilities, are located near substations to be constructed. In this paper, we examined such a case that a branch office building of KT(Korea Telecom) was located near 154 kV underground GIS substation under construction with about 100 meters of the lateral distance between two facilities. GPR (Ground Potential Rise) at the substation and the transferred earth potential at the KT building through the earth in SLG (Single-Line-to- Ground) fault condition were investigated based on a series of computer simulations. The calculated earth potential at a distance of 100 m from the substation was below 120 V which satisfying the limit value of 650 V.

Initial Firing Angle Control of Parallel Multi-Pulse Thyristor Dual Converter for Urban Railway Power Substations

  • Kim, Sung-An;Han, Sung-Wo;Cho, Yun-Hyun
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권2호
    • /
    • pp.674-682
    • /
    • 2017
  • This paper presents an optimal initial firing angle control based on the energy consumption and regenerative energy of a parallel multi-pulse thyristor dual converter for urban railway power substations. To prevent short circuiting the thyristor dual converter, a hysteresis band for maintaining a zero-current discontinuous section (ZCDS) is essential during mode changes. During conversion from the ZCDS to forward or reverse mode, the DC trolley voltage can be stabilized by selecting the optimal initial firing angle without an overshoot and slow response. However, the optimal initial firing angle is different depending on the line impedance of each converter. Therefore, the control algorithm for tracking the optimal initial firing angle is proposed to eliminate the overshoot and slow response of DC trolley voltage. Simulations and experiments show that the proposed algorithm yields the fastest DC voltage control performance in the transient state by tracking the optimal firing angle.

Coordinated Voltage-Reactive Power Control Schemes Based on PMU Measurement at Automated Substations

  • Choi, Yun-Hyuk;Kang, Sang-Gyun;Lee, Byongjun
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권4호
    • /
    • pp.1400-1407
    • /
    • 2015
  • This paper deals with methodology to control an automatic substation system. The control system can predict the power system condition by a voltage stability index (VSI). The strategies in this paper is called as Voltage-Reactive Power Control (VRPC), which regulates an abnormal voltage of a target substation by using coordination between tap changers and shunt capacitor/reactor. This method is efficient for better voltage profile. The monitoring substation includes whole of substations around the contingency event. The control quantities of the monitoring substations are decided by the calculation of the VSI, called as a Z-index. Case studies with BC Hydro-Quebec system are presented to illustrate this approach using real-time simulator.

The Analysis Results of Lightning Overvoltages by EMTP for Lightning Protection Design of 500kV Substations

  • Ju Hyung-Jun;Lee Heung-Ho
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권4호
    • /
    • pp.366-370
    • /
    • 2005
  • To meet increasing power demand, 500 kV power systems are under consideration in the regions of some Middle Asian countries. As the power system voltage becomes higher, the cost for the power system insulation increases significantly. 500 kV transmission systems will become the basis of a region's power system and they require much higher system reliability. Consequently, by the methods of limiting overvoltages effectively, a reasonable insulation design and coordination must be accomplished. In particular, the Substations must be constructed to be of outdoor type. In order to determine the various factors for the insulation design, the EMTP (Electro-magnetic transient program) is used for the magnification of transient phenomena of the 500 kV systems in the planned network. In this paper, we will explain the calculation results of lightning overvoltages by the EMTP for lightning protection design for the 500 kV substations. To obtain reliable results, the multi-story tower model and EMTP/TACS model are introduced for the simulation of dynamic arc characteristics.

직류 1500V 전기철도용 변전소의 회생인버터 용량 및 설치위치 선정 방법 (Determining the Capacity and Installation Positions of Regenerative Inverters at DC 1500V Electric Railway Substations)

  • 배창한;한문섭;김용기;권삼영;박현준
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제55권9호
    • /
    • pp.478-484
    • /
    • 2006
  • The paper presents methods of determining the capacity and installation positions of regenerative inverters installed in DC 1500V electric railway system. We suggested a method that approximates using parameters related to substations where regenerative inverters are installed, railway lines and operating motor cars, and another that calculates using regenerative power obtained from Train performance Simulation (TPS) and Power Flow Simulation (PFS). We carried out TPS and PFS for Seoul Subway Line $5{\sim}8$, calculating regenerative power and determining substations where regenerative inverters would be installed and the optimal capacity and number of inverters to be installed.

직류전기철도 시스템에 있어서의 변전소 송출전압에 따른 회생전력유효이용 (An Effective Utilization of Regenerative Power According to the Output Voltage of Substations in the DC Electric Railways)

  • Kim, Yang-Mo
    • 대한전기학회논문지
    • /
    • 제39권2호
    • /
    • pp.149-156
    • /
    • 1990
  • In DC electric railway systems, the feeding currrnt is not permitted to flow backward in almost all the substations and the pantograph voltages at the regenerating cars rise extremely by the voltage drop of the resistance of the feeder line. In order to prevent the overrise of the pantograph voltage in power regenerating cars, the squeezing circuits for the regenerative current are equipped and this leads to double losses, which are an extra worn-out of the brake-shoes and an ineffective use of regenerative power. In this study, the insertion of resistors in the feeder line system is proposed as a possible method for the effective utilization of the regenerative power in the electric railways. Also it is investigated how the output voltages of substations affect the effective use of regenertive capability. The investigation results show that the energy savings and the reduction of the worn-out of the brake-shoe can be achieved at the same time by the insertion of resistors in the feeder line system.

  • PDF

345kV 의령변전소 예방진단시스템의 데이터 분석 (Data Analysis of the Preventive diagnostic system of the 345kV Eui-Ryung substations)

  • 권동진;강연욱;주병수;이옥배;이호진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 C
    • /
    • pp.1899-1902
    • /
    • 2002
  • KEPCO is planning to operate 765kV Sin-Tao-Back and Sin-Ga-Pyong substations from 2004. A preventive diagnostic system to obtain the reliability of transformer and GIS is being adopted in 765kV substations. KEPRI has developed a preventive diagnostic system for 765kV substation since 1997. The preventive diagnostic system developed in that project was installed to the 345kV Eui-Ryung substation in June, 2000, and it is under circumstance durability test and operation capacity tests. In this paper, we analyze data of the preventive diagnostic system in 345kV Eui-Ryung substation.

  • PDF

변전소의 다중상태를 고려한 송전시스템의 내진 신뢰성 평가 (Seismic Reliability Evaluation of Electric Power Transmission Systems Considering the Multi-state of Substations)

  • 고현무;박영준;박원석;조호현
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2003년도 추계 학술발표회논문집
    • /
    • pp.66-73
    • /
    • 2003
  • The technique for the seismic reliability evaluation of the electric power network is presented. In the previous study, the state of the substations was represented by the bi-state which is classified as failure or survival. However, the hi-state model can result in oversimplified analysis, because substations are worked by the parallel operating system. In this paper, Considering the characteristics of the parallel operating system, the damage of the substation is expressed by the multi-state for the more realistic seismic reliability evaluation. Using Monte-Carlo simulation method, the seismic reliability for Korean 345㎸ electric power network is evaluated. Analysis results show that reliability levels of the network by the multi-state analysis is higher than that by the hi-state analysis and the electric power network in southeastern area of the Korean Peninsular may be vulnerable to earthquakes.

  • PDF