• Title/Summary/Keyword: Substation-Structure

Search Result 51, Processing Time 0.024 seconds

Synchronized Sampling Structure applied HW/SW platform for LAN-based Digital Substation Protection (LAN 기반 디지털 변전소 보호를 위한 동기 샘플링 구조적용 HW/SW 플랫폼 기술)

  • Son, Kyou Jung;Nam, Kyung-Deok;An, Gi Sung;Chang, Tae Gyu
    • Journal of IKEEE
    • /
    • v.24 no.1
    • /
    • pp.178-185
    • /
    • 2020
  • This paper proposes precise time synchronization-based synchronized sampling structure applied HW/SW platform for LAN-based protection of future digital substations. The integrated software of the proposed platform includes IEC 61850 protocol, IEEE 1588 precision time protocol and synchronized sampling structure. The proposed platform expected to provide a basis of an application of future distributed sensing data-based protection and control methods by providing synchronized measurement among IEDs. The implementation of the proposed HW/SW platform technique was performed using TMDXIDK572 multi-core/multi-processor evaluation module and its time synchronization performance and synchronized sampling function were confirmed through the performance tests.

A study on the application of the IEC61850 based eCMD convergence structure in Digital Substation (IEC61850 기반 디지털 변전시스템에서의 eCMD 융합화구조 적용에 관한 연구)

  • Lee, D.C.;Kim, H.S.;Bae, U.L.;Min, B.W.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07e
    • /
    • pp.19-22
    • /
    • 2006
  • The CMD(Condition Monitoring & Diagnosis) System is used to monitor and analyze the PD(Partial Discharge), Arc, Temperature, Pressure, Gas in Oil and so on for reliability and availability of the substation. Although this system comes into the spotlight as the forecast and management of the failure and fault, there are some problems. For example, the unified standard was not defined, and the effective management of the layed communication network does not performed, limitation of physical space, etc. To resolve above problems, this paper suggests the IEC61850 compatible eCMD system architecture for monitoring and analyzing the CMD factor in substations. The suggested eCMD system consists of CMD-LU(Condition Monitoring & Diagnosis-Local Unit), IED(Intelligent Electronic Device), and engineering centers. The IEC61850 is the international standard that defines communication networks and system in substation.

  • PDF

Study on selection and basic specifications design of shield TBM for power cable tunnels (터널식 전력구 쉴드TBM 선정 및 기본설계 사양 제시에 관한 연구)

  • Jung Joo Kim;Ji Yun Lee;Hee Hwan Ryu;Ju Hwan Jung;Suk Jae Lee;Du San Bae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.3
    • /
    • pp.201-220
    • /
    • 2023
  • Power cable tunnels is one of the underground structures meant for electricity transmission and are constructed using shield TBM method when transitting across urban and subsea regions. With the increasing shaft depth for tunnels excavation when the shield TBM excavated the rock mass, the review of selecting closed-type shield TBM in rocks becomes necessary. A simplified shield TBM design method is also necessary based on conventional geotechnical survey results. In this respect, design method and related design program are developed based on combined results of full-scale tests, considerable amount of accumulated TBM data, and numerical simulation results. In order to validate the program results, excavation data of a completed power cable tunnel project are utilized. Thrust force, torque, and power of shield TBM specification are validated using Kernel density concept which estimates the population data. The robustness of design expertise is established through this research which will help in stable provision of electricity supply.

Development of Alarm Processing Algorithm for SAS (변전소 자동화를 위한 Alarm Processing 방법 개발)

  • Jin, B.G.;Hyun, S.H.;Lee, S.J.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.161-162
    • /
    • 2006
  • There are many alarms in Substation Automation System because of data types and quantities increasing, so it is very difficult for operators to know the actual situations. In order to help operators easily make decision, some unnecessary alarms should be removed or combined as one. In this paper, alarm processing is using the structure of substation system and the relation of measured data and events to make some rules. Conventional alarm processing just gives data, but proposed alarm processing gives the whole information. In a simulation model system, the data such as voltage, current and CB status are collected by HyperSim and saved in DB, then proposed alarm processing has been testified using those data based on real-time simulation.

  • PDF

A Study on the Integrated Diagnosis System for Unmanned Substation and Transmission Network in Local Control Center (지역급전 제어소의 무인변전소와 송전망 통합진단 시스템에 관한 연구)

  • Lee, Heung-Jae;Lim, Chan-Ho;Choi, Gi-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 1995.11a
    • /
    • pp.516-518
    • /
    • 1995
  • This paper presents an integrated fault diagnosis expert system for power systems. The proposed system diagnoses various faults occurred in both substations and transmission lines even in the case that substation fault is spreaded over the network. To cope with this problem, A meta-inference method is proposed. This scheme shares same the data structure with the pre-developed intelligent operational aid expert system installed in a practical sub-control center, without modification. This advanced integrated diagnosis system is developed using a low cost personal computer owing to the special modular programming technique. Case studies show a promising possibility of the proposed method.

  • PDF

Basic design of the preventive diagnostic expert system for 765kV substation equipments (765 KV 변전설비 예방진단 전문가 시스템 기본설계)

  • Choi, I.H.;Kweon, O.J.;Jung, G.J.;Sun, J.H.;Kim, K.H.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07e
    • /
    • pp.2133-2135
    • /
    • 1999
  • In this paper, we describe the basic design of the preventive diagnostic expert system for 765kV substation equipments. This expert system is developed to use expert system development tool and the main subjects considered are 765kV class power transformer and GIS. We basically designed the total structure of expert system and considered database interface methods, inference engine and control, triggering system which compose expert system.

  • PDF

The Characteristics of Maximum Tolerable Voltage about Earth-Layer Structure in the Grounding System (접지시스템에서 지층구조의 변화에 대한 최대 허용전압의 특성)

  • Shim, Keon-Bo;Kim, Kung-Chul;Lee, Hyung-Su
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.05a
    • /
    • pp.254-259
    • /
    • 2007
  • During the ground fault conditions, the flow of current to earth will produce potential gradients within and arround a substation. The common physiological effects of electric current on the body, stated in order of increasing current magnitude, are threshold perception, muscular contraction, unconsciousness, fabrillation of the heart. In this study, determined the tolerable voltage about earth-layered structure in the grounding system.

  • PDF

A study on the utilization of abrasive waterjet for mechanical excavation of hard rock in vertical shaft construction (고강도 암반에서 수직구 기계굴착을 위한 연마재 워터젯 활용에 관한 연구)

  • Seon-Ah Jo;Ju-Hwan Jung;Hee-Hwan Ryu;Jun-Sik Park;Tae-Min Oh
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.5
    • /
    • pp.357-371
    • /
    • 2023
  • In cable tunnel construction using TBM, the vertical shaft is an essential structure for entrance and exit of TBM equipment and power lines. Since a shaft penetrates the ground vertically, it often encounters rock mass. Blasting or rock splitting methods, which are mainly used to the rock excavation, cause public complaints due to the noise, vibration and road occupation. Therefore, mechanical excavation using vertical shaft excavation machine are considered as an alternative to the conventional methods. However, at the current level of technology, the vertical excavation machine has limitation in its performance when applied for high strength rock with a compressive strength of more than 120 MPa. In this study, the potential utilization of waterjet technology as an excavation assistance method was investigated to improve mechanical excavation performance in the hard rock formations. Rock cutting experiments were conducted to verify the cutting performance of the abrasive waterjet. Based on the experimental result, it was found that ensuring excavation performance with respect to changing in ground conditions can be achieved by adjusting waterjet parameters such as standoff distance, traverse speed and water pressure. In addition, based on the relationship between excavation performance, uniaxial compressive strength and RQD, it was suggested that excavation performance could be improved by artificially creating joints using the abrasive waterjet. It is expected that these research results can be utilized as fundamental data for the introduction of vertical shaft excavation machines in the future.

Protection Coordination Analysis for Distribution Systems Integrated with Distributed Generation (분산전원이 도입된 배전계통의 보호협조 해석방법)

  • Kim, Jae-Eon;Kim, Eui-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.5
    • /
    • pp.2279-2284
    • /
    • 2011
  • In most of radial distribution systems, the overcurrent protection coordination is adopted for the protection of apparatus and the improvement of electrical power system reliability. The protection coordination structure in distribution substation is composed of several circuit breakers(CB) with distribution lines originating from one substation bus under one transformer, which trip for their fault current. But sufficient analysis is necessary for the capacity of CB's in distribution systems with several distribution generations(DG). In this paper, a protection coordination method not to exceed the traditional capacity of CB's was proposed and certified through simulation by the PSCAD-EMTDC S/W.

Development of AC/DC Hybrid Simulation for Operator Training Simulator in Railway System

  • Cho, Yoon-Sung;Lee, Hansang;Jang, Gilsoo
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.1
    • /
    • pp.52-59
    • /
    • 2014
  • Operator training simulator, within a training environment designed to understand the principles and behavior of the railway system with respect to operator's entries and predefined scenario, can provide a very strong benefit in facilitating operators' handling undesired operations. This simulator consists of computer system and applications, and the purpose of applications is to generate the power and voltage and analyze the AC substation and DC railway, respectively. This paper describes a novel approach to the new techniques for AC/DC hybrid simulation for the operator training simulator in the railway system. We first propose the structure the database of railway system. Then, topology processing and power flow using a linked-list method based on the proposed database, full or decoupled newton-rapshon methods are presented. Finally, the interface between the analysis for AC substation using a newton-rapshon method and the analysis for DC railway system using a time-interval power flow method is described. We have verified and tested the developed algorithm through the extensive testing for the proposed test system. To demonstrate the validity of the developed algorithm, comparative simulations between the proposed algorithm and PSS/E for the test system were conducted.