• Title/Summary/Keyword: Substation-Structure

Search Result 51, Processing Time 0.028 seconds

Application Standards for Substation Types and Facility Scales (변전소 형태 및 설비규모의 결정)

  • Min, Byeong-Wook;Shin, Myoung-Sik;Bahng, Seon-Woong;Kim, Young-Dal
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.438-439
    • /
    • 2011
  • Substations in Korea are classified into an outdoor steel structure type, an outdoor GIS(Gas Insulated Switchgear) type, an indoor GIS type, an underground GIS type, and a complex GIS type. Before 1970, substations were built in outdoor steel structure types only. In 1980, an 154kV indoor GIS type substation was built for the first time in Pusan. And the first 345kV indoor GIS type substation, the first 765kV full GIS substation were built in 1984 and in 2002 each. In 1998, 154kV indoor type substations were standardized into regular type and urban type which applied steel frames to structures. In 2002, this was re-standardized into five different types in detail. In 2007, hub substations which had high capacity were built in the region of industrial zone and heavy load areas. And 154kV compact substation was developed and standardized by compacting an indoor GIS type substation in 2009. This paper would present a series of substation type transition and application standards for substation types and facility scales.

  • PDF

The configuration of optimal structure for substation SCADA system (최적규모의 변전소 집중원방감시제어(SCADA) 시스템 구성)

  • 이용해;남태현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.678-682
    • /
    • 1988
  • Current substation SCADA system has only one control center where two or three operaters monitor and control more than 40 substations spreaded far and wide. The scope of this system is too wide to cope with the concurrent multiple accidents in electric network by the typhoon and large mow. This paper describes the method to organize the optimal structure of substation SCADA system using remote console and small scale control center.

  • PDF

A Study on the Substation for the Bad Measuring Devices Detection and Correction (변전소 측정기기의 검.교정 알고리즘에 관한 연구)

  • Lee, H.J.;Park, S.M.;Kim, Y.H.;Kim, J.K.
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.313-315
    • /
    • 2001
  • The power system automation, especially the substation automation is a major issue. so it has been widely studied each country in the world. Since the substation system includes lots of measuring devices. a lot of data and system information are transmitted to operators. The measured values usually have the error that results from the communication process, and it can degrade the reliability of estimated values. So. the detection and correction of measured values at a substation are important factors for substation automation. In this paper, we study the detection and col of measured values at the domestic 154kV/2 distribution substation of double bus structure study will be useful for expected economic dispatch measuring device's inspection and corr management by SCADA system operation, substation automation.

  • PDF

SCL based HMI Development Methodology for IEC 61850 SAS (IEC 61850 자동화 변전소에 SCL 기반 HMI 개발방법 연구)

  • Choi, Young-Jun;Kim, Tae-Wan;Choi, Myeon-Song;Lee, Seung-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.255-261
    • /
    • 2010
  • In this paper, a substation HMI based on IEC 61850 is proposed that uses SCL to have all information in substation to include standard concept of IEC 61850. A proposed substation HMI using SCL based on IEC 61850 expresses different display by each substation structure and component device change in substation. A proposed substation HMI is designed by IEC 61850 standard, and it suits for future substation HMI based on IEC 61850. A proposed HMI is proved by a program that is made by Visual C++ to use SCL file based on XML.

An improvement to seismic design of substation support structures

  • Mohammadi, Reza Karami;Akrami, Vahid;Nikfar, Farzad
    • Structural Engineering and Mechanics
    • /
    • v.45 no.6
    • /
    • pp.821-835
    • /
    • 2013
  • The acceleration that the electrical equipment experiences on a structure can be several times the ground acceleration. Currently, substation support structures are being designed according to ASCE (Substation Structure Design Guide 2008), without any consideration about effects of these structures on dynamic behavior of mounted equipment. In this paper, a parametric study is implemented in order to improve seismic design of candlestick substation structures based on this design guide. To do this, dynamic amplification factor (DAF) of different candlestick support-equipment combinations is evaluated and compared to the target DAF presented in IEEE STD 693 (2006). Based on this procedure, a new criterion is developed to restrict maximum acceleration at support-equipment intersection.

A Study on the Load Flow Program for 765[㎸] Substation Simulator (765[㎸] 변전소 시뮬레이터를 위한 조류계산 프로그램에 관한 연구)

  • 여상민;김철환;이종포
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.4
    • /
    • pp.201-206
    • /
    • 2003
  • Power system is analyzed by three methods of load flow, fault calculation, and voltage stability. Among there, load flow is calculated to flow of power in power in system at steady state. But, load flow is difficult to analyze to flow of power in substation, because power flow frequently alter by various equipments such as circuit bleaker, disconnect switch and shunt reactor. Particular, in 765[㎸] system, because of form of 1.5GB for stable operation, structure of substation has been very complex. In this paper, we describe technique for application of load flow algorithm in simulator for 765[㎸] substation. For this technique, we built each database for various equipments and considered form of 1.5GB Data as form of bus and line, for application of load flow, are acquired from built database, and then calculate load flow in substation. And. results of load flow are outputted in screen of operator console program.

A Study on standardization of control cable numbering for high speed railway substation (고속전기철도 변전소 제어케이블 번호부여체계 표준화에 관한 연구)

  • An, Seung-Hwa;Kim, Si-Koo;Kim, Baik;Rho, Sung-Chan;Jung, Sang-Ki;Ann, Young-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.337-346
    • /
    • 2008
  • In this paper, a study an standardization of control cable numbering for high speed railway substation. Standard numbering structure of substation control cable and consistency of the number system are important for the railway substation construction and maintenance. However, currently control cable number system of railway substation was not standardization which was different according to a bander and a construct company. Therefor there is many difficult which does a same function to differ in maintenance and repair to accident. Therefor Standardizes the number system of the substation control cable is useful for an improve of construction and maintenance.

  • PDF

Evaluation of Acceleration Amplification Factors Based on the Structural Type of Substation for the Seismic Design of Power Facilities (전력설비의 내진설계를 위한 변전소 구조형식에 따른 가속도 증폭계수의 평가)

  • Park, Seong-Jae;Chun, Nakhyun;Hwang, Kyeong-Min;Moon, Jiho;Song, Jong-Keol
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.3
    • /
    • pp.159-169
    • /
    • 2020
  • Acceleration amplification factors, which are variables used in the seismic design of power facilities installed inside substation structures, are presented in the seismic design standards of the United States (US), Japan, and Korea. Unlike the coefficients presented in the design standards of the US and Japan, those presented in domestic design standards can be obtained only by performing dynamic analysis when the substation structure has more than four floors. Because most substation structures in Korea have 4-5 stories, the existing acceleration amplification factor is insufficient to be applied to actual substation structures. To suggest an acceleration amplification factor suitable for domestic substation structure types, the acceleration amplification factor was evaluated for seven representative substation structures. The acceleration amplification factors were evaluated by constructing in-structure response spectra based on a study of far-field and near-fault earthquakes. In general, the acceleration amplification coefficients αJ and αA according to the US and Japan seismic design criteria tend to be overestimated compared with the acceleration amplification factors obtained through dynamic analysis based on the study of near-fault and far-field earthquakes.

Study on the Supervisory Monitoring System for Substation Automation (변전소 자동화를 위한 상태감시 시스템에 관한 연구)

  • Lee, Heung-Jae;Lee, Eun-Jae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.2
    • /
    • pp.84-91
    • /
    • 2014
  • This paper introduces the application of supervisory monitoring system for substation automation based on IEC 61850. The objective of proposed system is detection of such a malfunction or degradation of devices. The supervisory monitoring procedure consists of a two step - topology processor and state estimation. The topology processor using artificial intelligence is a preprocessing step of state estimation. Topology processor identifies the topology structure of switches in substation and detects an error of ON/OFF state data. The state estimation is an algorithm that minimizes an error between optimal estimation values and real values. The proposed system is applied to standard digital substation based on IEC 61850 for performance verification.

A Sutdy on the Apllicability of the Energy Pile System on Substation (변전소 구조물의 에너지파일 시스템 적용성 연구)

  • Lee, Daesoo;Oh, Gidae;Lee, Kangyul
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.198-198
    • /
    • 2011
  • Cooling and Heating system using Geothermal energy in the country has shown rapid development in the research and business field during about 10 years. However, like other renewable energy sources, high initial construction cost is acting as an obstacle to apply widely. Therefore Energy pile system(Heat Exchanger inserted inside the structure pile) that can save about 25 % initial construction cost has been studied in European countries and recently being studied in our country. Therefore, KPECO(Korea Electric Power Corporation) is also studying energy pile system to improve cooling & heating system in substation that install about 200 pile. KPECO is aimed to make energy pile design, construction and maintenance standards because substation has good applicability. In this study, we studied to make new grout material and design program to make optimized design & counstruction method of energy pile system. And planing to peform field test for energy pile system in a 154 kV substation to obtain long-term behavior and efficiency of the system.

  • PDF