• Title/Summary/Keyword: Strategic Environmental Impact Assessment

Search Result 63, Processing Time 0.027 seconds

Environmental Impact Assessment in Europe : Legal Basis and Recent Developments (유럽에서의 환경영향평가)

  • Bunge, Thomas
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.55-61
    • /
    • 1995
  • The European Community (EC) began dealing with the subject of environmental impact assessment (EIA) in the mid-1970s. After ten years of preparatory work and more than 20 draft versions, the EC Council of Ministers adopted, in 1985, the Directive on the assessment of the effects of certain public and private projects on the environment (85/337/EEC). This directive requires the member states to make EIA mandatory for certain projects. Its Article 3 defines the purpose of the instrument: "The environmental impact assessment will identify, describe and assess the direct and indirect effects of a project. There are no rules on scoping or on post-project analysis. However, member states are free to adopt, in their domestic legislation, more stringent rules regarding the scope and procedure of EIA. Consequently, they have developed national EIA systems which differ considerably from each other. Also, EIA practice in each of these countries is different from that in the others. In 1992, the EC Council adopted the 'Flora, Fauna, Habitat' Directive which lays down an additional EIA requirement. Member states will have to develop a network of 'European' nature conservation areas. Each project or plan possibly endangering these areas will have to be assessed whether it is in line with the protection purposes laid down for them. Although the directive does not say so explicitly, this means that a kind of EIA will have to be carried out for those projects and plans. For several years, the Commission has been developing proposals for a directive on EIA of plans and programmes ("strategic EIA"). This would supplement directive 85/337/EED, and would require and EIA for plans and programmes influencing decisions on specific projects(e.g. agricultural plans or energy programmes). At present, procedural and methodological questions of strategic EIA are being discussed extensively both within and without the European Union.

  • PDF

A Study of Useability of Ecosystem Service Assessment on Strategic Environmental Assessment (전략환경영향평가 시 생태계서비스 평가 결과의 활용가능성에 관한 연구)

  • Park, Yoon-Sun;Kim, Choong-Ki;Lee, Who-Seung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.24 no.2
    • /
    • pp.115-126
    • /
    • 2021
  • Strategic Environmental Impact Assessment (SEA) is a decision-making process taking into account the environmental impact, economic and social impact of policies, plans, and programs at the higher stage prior to the project plan for promoting sustainable development. In this study, we analyzed the process and criteria for selecting appropriate alternatives when establishing development plan in SEA. First, the criteria for estimating changes in ecosystem services following the implementation of development project of industrial complex were presented. Second, alternative evaluations were conducted through an analysis of ecosystem service scenarios to explore suitable alternatives in Anseong. As a result, the environmental quality of selected area as the existing project site deteriorated according to the implementation of the project, and the dimensional reduction technique confirmed that the change in ecosystem service factors in project area was the optimal location. In addition, the results of the scenario assessment to explore suitable alternatives in Anseong City showed that the existing site had large capacity in terms of water quality control services (scenario 1), scenario 2 in terms of preconditioning services, and scenario 3 in terms of water supply services. The guidance of Ecosystem service assessment is expected to be available in decision-making of large-scale strategies (e.g., SEA) and projects by presenting more quantitative criteria for determining the adequacy and location feasibility of development plans and policy plans. This is expected to require various support, including legislation and revision of related laws, believed to be supported by advanced research.

A Comparative Study on Estimation Methodologies of Carbon Sequestration Amount by Vegetation for Environmental Impact Assessment on Development Projects (개발사업 환경영향평가시 식생의 탄소저장 및 흡수량 산정법에 대한 비교)

  • Hwang, Sang Il;Park, Sun Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.4
    • /
    • pp.477-487
    • /
    • 2011
  • In this study, we deduced the best estimation methodology for amount of carbon sequestration by vegetation, through the case study using the data obtainable from the environmental assessment procedure. Our results showed that the estimation methodology using the national vegetation map was the best for the strategic environmental assessment, whileas those using the vegetation growth equation were applicable for environmental impact assessment procedure. Furthermore, we found that the amount of carbon sequestration by farmland and/or grassland, not by vegetation, was not negligible. Therefore, we concluded that the area of farmland and/or grassland need to be taken into account during the landuse planning.

Strategic Environmental Impact Assessment for Development Basic Plan Considering complex Characteristics of Soil - Focused on the Bogeumjari housing supply plan and an urban management plan - (토양의 복합적 특성을 고려한 개발기본계획 전략환경영향평가 - 보금자리주택계획 및 도시관리계획을 중심으로 -)

  • Yang, Jihoon;Park, Sun Hwan;Yoo, Keunje;Kim, Tae Heum;Hwang, Sang Il
    • Journal of Environmental Impact Assessment
    • /
    • v.25 no.2
    • /
    • pp.155-164
    • /
    • 2016
  • Soil has been recognized as an important resource due to its finitude and valuable functions. Therefore, many countries have adopted soil quality related indicators in Strategic Environment Impact Assessment(SEIA). However, Korean SEIA has used limited indicators such as soil contamination until now. In this study, the SEIA on "Development Basic Plan" was modified for considering complex characteristics of soil and applied to "Bogeumjari Housing Supply Plan" and "Urban Management Plan". The performance of the SEIA considering soil characteristics was evaluated using a checklist for assessing consistency with upper plan, adequacy of alternatives, and feasibility of siting. Soil organic matter and soil erosion were derived as main indicators for "Basic Development Plans". The proposed SEIA technique equipped with soil indicators is proved to contribute to the soil resource conservation.

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

Utilization of Noise Map in the Stage of Environmental Assessment on Development Project (개발계획 환경평가 단계에서의 소음지도 활용방안)

  • Sun, Hyo-Sung
    • Journal of Environmental Policy
    • /
    • v.9 no.3
    • /
    • pp.29-46
    • /
    • 2010
  • This study presents plans to prevent environmental noise by using noise maps when establishing development projects and targets strategic environment assessments for urban master plans and environmental impact assessment for urban development projects. Strategic environment assessments for urban master plans include the examination of plan validity and location appropriateness in consideration of the effect of environmental noise by comparing development plans with noise maps, and the establishment of long-term measures through comprehensive assessment of present noise conditions and noise effects from development plans. Environmental impact assessments for urban development projects propose enforcement plans, including analysis of present noise conditions around development areas, overall evaluation of present noise conditions and the noise effect from development projects, and selection of optimal measures by comparing noise maps with various alternatives.

  • PDF

Environmental Impact Assessment in Urban Planning (도시계획과 환경영향평가)

  • Yong, Chung
    • Journal of Environmental Impact Assessment
    • /
    • v.2 no.2
    • /
    • pp.1-11
    • /
    • 1993
  • Most developing countries are experiencing rapid urbanization and the associated growth of industry and services. Cities are currently absorbing two-thirds of the total population in the developing world. Korea has about 85 percent of urban dwellers. World population will shift from being predominantly rural to predominantly urban around the turn of the century. Although cities play a key role in development process and make more than a proportionate contribution to national economic growth, especially cities are also the main catalysts of economic growth in developing countries, they can also be unhealthy, inefficient, and inequitable places to live. Most developing countries are increasingly unable to provide basic environmental infrastructure and services, whether in the megacities or in secondary urban centers. Of particular concern is the strain on natural resources brought by the increasing number of people, cars, and factories. They are generating ever greater amounts of urban wastes and emissions. They also exceed the capacity of regulatory authorities to control them and of nature to assimilate them. The environmental consequences are translated into direct negative impacts on human health, the quality of life, the productivity of the city, and the surrounding ecosystems. Environmental degradation threatens the long tenn availability and quality of natural resources critical to economic growth. Cities, with their higher and growing per capita energy use for domestic, industrial, and transport purpose also contribute a disproportionate share of the emission leading to global warming and acid rain. An important priority is to develop strategic approaches for managing the urban environment. The design of appropriate and lasting strategic responses requires first an understanding of the underlying causes of urban environmental deterioration, it is necessary that longer tenn objectives should be set for urban area to avoid irreversible ecological damage and to ensure lasting economic development. As a means to the preventive policies against the adverse effect, environmental impact assessment (EIA) serve to identify a project's possible environmental consequences early enough to allow their being taken into consideration in the decision making process for urban planning. This paper describes some considerations of EIA for urban planning-scoping, assessment process, measurement and prediction of impacts, pollution controls and supervision, and system planning for environmental preservation.

  • PDF

A Study on the Application and Development of the Strategic Environmental Assessment(SEA) Model with Reference to Urban Comprehensive Plan (전략환경평가 모형의 개발과 적용에 관한 연구(I): 도시기본계획 평가를 중심으로)

  • Sung, Hyun-Chan;Kim, Kwi-Gon
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.5-31
    • /
    • 1997
  • Strategic Environmental Assessment (SEA) is an assessment process integrated with policy and planning processes considering environmental impacts, not at the level of individual project, but at higher level of policy and plan. Presently, two systems for the SEA are being implemented in Korea. One is "the consultation of environmental investigation into a change in national land utilization", which is to be pre-discussed with the head of the related central administrative organizations, based on the respective individual code. The other is "the consultation of environmental investigation into an administrative plan and project", which is to be pre-discussed with the minister of the environments for the administrative plan. However, these two systems are not integrated procedures with the planning process. In other words, there is a separate post-environmental assessment after planning. Also concrete proposal is not yet prepared for the method and procedure of environmental investigation about details of the planning. Therefore, they do not playa role in taking precautions for environmentally sustainable development. In this study, for the effective environmental investigation at the level of planning, environmental assessment model to be integrated with urban comprehensive plans was developed. The results of this study can be summarized as follows: First, based on the analysis of systematic problems in environmental investigation of this country, the study compared and analysed the SEA method of foreign countries. derived the potential limitations in its applications to this country. Also, the new method in this study, is integrated into planning process by improving the limitations. Thus, we developed the SEA model for this country, which consists of seven steps ; Phase 1; establishing a work program, Phase 2; defining the scop. of the SEA, Phase 3; analyzing an existing environmental situation, Phase 4; examining the consistency with environmental policy, Phase 5; appraising and synthesizing the plan content, Phase 6; proposing recommendations, Phase 7; monitoring and feedback. Second, the two types of application program of the developed assessment model were proposed. One is to integrate this model into planning process, and the other is for the institute and ministry of environments to implement SEA after planning. An aim of this study was developing an environmental assessment model at the planning level which was not yet established in this country and was to apply the model to urban comprehensive plan for inspection. This research will make the effective operation of environmental investigation system possible at the planning level in this country and contribute to the environmental protection at the global level.

  • PDF

Green Belt Abolition and Strategic Environmental Assessment: The Case Study of Chongju City (개발제한구역의 해제와 전략환경평가: 청주시를 사례로)

  • Lee, Jong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.121-135
    • /
    • 2003
  • 1999년 7월 청주권을 비롯한 7개 지방중소도시권은 친환경적 도시기본계획을 수립한 후 개발제한구역을 해제하도록 하고, 수도권을 비롯한 7개 대도시권은 보전가치가 낮은 지역을 위주로 부분적으로 해제하도록 하였다. 그리하여 표고, 경사도, 농업적성도, 식물상, 임업적성도, 수질 등 6개 항목에 대한 환경평가를 통해 개발제한구역에 용도지역이 지정되었다. 청주시의 경우 환경평가와 주민의견 반영 후 도시계획재정비에 따라 용도지역이 지정되었으나, 평지나 산림생산성이 떨어지는 곳은 낮은 환경등급을 받아 개발이 가능한 용도지역이 지정됨으로써 벨트형 녹지 유지가 어려워져, 시가지 팽창, 대전과 연담화, 도시 허파기능 상실 등의 가능성이 커지게 되었다. 따라서 청주권 개발제한구역의 시가화 영향을 토지피복, 지목, 용도지역 등의 변화를 통해 살펴보고, 6개 항목에 대한 환경평가 과정상 문제점을 고찰한 후, 개발제한구역의 해제 영향을 도시성장측면과 환경용량평가를 통해 규명하고, 전략환경평가의 적용방안을 모색하고자 한다. 전략환경평가의 시행을 위해서는 먼저 오염총량관리제, 국토의 계획 및 이용에 관한 법률에 의한 개발밀도관리구역, 수도권정비계획법에 의한 인구집중시설에 대한 개발총량규제 등이 반영되어야 할 것이다. 그리고 이미 시행중인 개발사업 및 개발계획중인 사업에 대한 누적영향평가와 함께 해당 지역에 대한 환경용량평가가 이뤄져야 하고, 아울러 개발제한구역 해제지역에 대한 사전환경성검토업무편람의 내용을 토대로 하여 환경평가항목에 대한 스코우핑, 환경평가 지표 개발이 이뤄져야 할 것이다.

Social Impact Assessment on National Development Projects in Korea (대형 국책사업에 대한 사회영향평가)

  • Lee, Jong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.2
    • /
    • pp.197-204
    • /
    • 2010
  • 새만금사업, 신행정수도(행정중심복합도시, 세종시), 한반도 대운하사업(4대강 살리기사업) 등과 같은 대형국책사업은 대통령 선거공약으로 제시되었다. 그러한 대형국책사업이 국가의 이익을 위해 꼭 필요한 것으로 제시되었다 하더라도, 그 결과는 좋은 의도와는 다르게 나타날 수도 있다. 대통령 선거후 환경정책기본법과 환경영향평가법에 따라 대형국책사업에 대한 사전환경성검토(전략환경평가)와 환경영향평가가 이뤄졌지만, 예상하지 못했던 정치적, 사회경제적, 환경적 갈등이 발생하였다. 이러한 개발 및 환경 갈등의 원인은 여러 측면에서 찾을 수 있겠지만, 사회경제적 항목을 중심으로 하는 사회영향평가의 미흡을 그 원인으로 제시하는 연구가 많다. 대규모 국책사업을 둘러싼 개발 및 환경 갈등을 해소하기 위해, 우리나라와 외국의 사회영향평가의 현황과 연구 동향을 고찰하고, 국책사업의 주요 쟁점의 분석을 통하여 사회영향평가의 중요성과 필요성을 강조하였다. 그리고 사회영향평가의 도입, 강화, 지침 마련에 대해 다음과 같이 제안하였다. 첫째, 현재의 사전환경성검토(전략환경평가)시에 사회적 통합, 경제적 측면(B/C분석, 비용, 고용 등), 법제적 측면, 한반도 통일이나 국가균형발전 등과 같은 사회경제적 항목을 평가항목에 추가함으로써 사회영향평가를 도입하고; 둘째, 환경영향평가 시에 공공시설, 교육, 교통, 문화재, 경제적 타당성, 고용, 토지이용을 현재의 사회경제평가항목에 추가시켜 사회영향평가를 보다 강화시키고; 셋째, 한국의 환경적, 정치적, 경제적, 사회적, 문화적 상황을 반영하여(사회영향평가의 원리와 지침(가칭))을 마련하도록 한다.