• Title/Summary/Keyword: Steel Pipe Scaffolding

Search Result 12, Processing Time 0.016 seconds

Research & Development on the Scaffolding for Cylindrical Desulfurizers Facility Maintenance (원통형 탈황설비 정비용 비계 연구개발)

  • Lee, Kwang-Gil;Kim, Woo-Gon;Eum, Seok-Ho;Kang, Cheol-Min;Kang, Jeong-Ki;Oh, Cheol-Seok;Seo, Ju-Sik;Kim, Kyeong-Jae;Park, Jong-In;Jang, Mong-Yong;Kim, Moo-Seong;Kim, Dae-Nyeon;Jung, Soo-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.3
    • /
    • pp.1-8
    • /
    • 2020
  • The desulfurizers facility is cylindrical shape. To operate properly it needs nozzles cleaned, get rid of lime adhesion and sludge, repair the wear and corrosion of facility regularly. For this purpose, workers shall access the ceiling or vertical wall at high place. Ordinary scaffoldings such as steel pipe scaffolding or system scaffolding have been using so that workers can access them. With these ordinary scaffoldings, openings around cylindrical wall are inevitable which make workers can expose always to the risk of falling. The purpose of this study is to develop customized scaffolding to minimize the openings to prevent workers form falling during maintenance it. It consists of a hexagonal central tower and six trapezoidal outer towers. And the bracing among the towers have connected each other for self-standing and for maintaining the structure of towers. Span decks, the circumference footstools, steps, etc. are laid on each floor. The safety is reviewed by structural analysis and performance test. With this study, openings each floor of this scaffold are removed. The gap between the cylindrical wall and the edge of the work stage is approximately 100 mm. Therefore, we expect that workers can work safely and efficiently.

Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support - (조립 가설기자재 품질평가 및 관리 시스템 개발 - 강관 비계, 시스템 비계, 시스템 동바리를 중심으로 -)

  • Jang, Ji young;Lee, Ji yeon;Kim, Ha yoon;Lee, Jun ho;Kim, Jun-Sang;Kim, Jung-Yeol;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.43-55
    • /
    • 2022
  • Since assembled temporary equipment is widely used for construction work that should be carried out before this construction begins, it is essential to secure quality during assembly and prevent safety accidents caused by assembled temporary equipment after installation. However, it was investigated that most construction site managers are not aware of its importance, such as recognizing the quality management of assembled temporary equipment as a task of managing temporary structures that are dismantled after installation for this construction. The quality management work of assembled temporary equipment at the construction site is carried out in different ways for each construction site because there is no formalized procedure and the subject of performing. In addition, it is analyzed that the manager of the general construction company inspects and reflects the parts that need to be inspected without evidence, so transparency is not guaranteed and the result leads to a serious disaster. Therefore, the purpose of this study is to establish a document preparation-oriented system that provides systematic quality evaluation and management procedures for securing the quality of assembled temporary equipment, develops a checklist for quality evaluation and management, and supports history management on the web.