• 제목/요약/키워드: Steel Making Plant

검색결과 45건 처리시간 0.027초

FASTMET$\circledR$ Process for Steel Mill Waste Recycling

  • Tanaka, Hidetoshi;Harada, Takao;Sugitatsu, Hiroshi
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2001년도 The 6th International Symposium of East Asian Resources Recycling Technology
    • /
    • pp.387-392
    • /
    • 2001
  • Kobe Steel, LTD. and Midrex Technologies Inc. jointly developed the FASTMET$\circledR$ process as a steel mill waste recycle technology in which the DRI product meets BF feed material or BOF/EAF feed material requirements. FASTMET(R) process turns value-less wastes into valuable DRI and sellable zinc oxide, and gives the solution for the steel mill wastes recycling from both economical and environmental viewpoints. During the development of the process, Laboratory, Pilot Plant and Demonstration Plant tests were carried out from 1990 to 1998. The first FASTMET(R) commercial plant began operation in April, 2000 and the second commercial plant started in April, 2001 Both commercial plants have proceeded successfully preying that FASTMET$\circledR$ is a suitable process for recycling steel mill waste and for producing DRI as an iron source.

  • PDF

시스템 엔지니어링 방식에 의한 철강 연속 주조 시스템 설계 (A Systems Engineering Approach to Designing Continuous Casting System in Iron and Steel Making Plant)

  • 신기영;홍대근;윤수철;서석환
    • 시스템엔지니어링학술지
    • /
    • 제10권2호
    • /
    • pp.21-31
    • /
    • 2014
  • Recently, global market competition of iron and steel products is ever increasing due to over-supply from increased number of industries in rapidly growing countries, such as China, Brazil, and Indonesia. To occupy the big market, major industries are trying to develop high quality, high performance steel products via developing a new iron and steel making process. In other words, development of a new and innovative steel plant is a key to cope with the tough situation. Design and development for the life cycle of iron and steel making plant is very much complex and multi-disciplinary. In this paper, Plant Systems Engineering (PSE), a tailored SE process for industrial plant based on ISO/IEC 15288 is used for the design of Continuous Casting Process (CCP) Plant system. The CCP is a crucial process in steel making plant, whose design technology is occupied by the advanced foreign companies. For the sake of increasing engineering capability for the design of CCP, we applied PSE Process for the renovation of the existing CCP Process. Through the study, we were convinced that the applied method can be used for other plant systems, and SE is really the way of thinking, design, and development of modern complex and multi-disciplinary systems where high risk factors are present throughout the whole life cycle.

The Investigation of the Plasma Sprayed Coatings for the Application of OG Cooling Tube in Steel Making Plant

  • Kim, HyungJun;Kwon, YoungGak
    • Corrosion Science and Technology
    • /
    • 제4권1호
    • /
    • pp.23-28
    • /
    • 2005
  • Several plasma-sprayed ceramic coatings with two- and three-layers were characterized and tested for the application of cooling tube coatings of oxygen convert gas recovery system (OG cooling system) in the steel making plant. Thermal cycling tests using a torch heating with compressed air cooling were carried out and characterized before and after the tests. The effects of metallic bond coat as well as ceramic top coat were also studied. Possible failure mechanisms with low carbon steel substrate were assessed in term of microstructure, porosity, bond strength, thermal expansion coefficient, and the phase transformation. Finally, the results of field tests at the OG cooling system are presented and discussed their microstructural degradation. Test results have shown that three-layered coatings perform better than two-layered coatings.

시스템 엔지니어링 표준 기반 제철 플랜트 엔지니어링 업무표준 개발 사례 (A Case Study of Steel-making Plant Engineering Standard Development Based On Systems Engineering Standards)

  • 이태경;조래혁;;이중윤
    • 시스템엔지니어링학술지
    • /
    • 제12권1호
    • /
    • pp.7-23
    • /
    • 2016
  • Plant engineering industry is considered as a key industry which will drive the future of Korea. However, Korean plant engineering companies have recently made huge losses in overseas businesses and the lack of engineering capability is pointed out as a main cause of this situation. Unlike Korean plant engineering companies, world leading engineering companies such as Flour and Bechtel have their own systems Engineering Standards/Guides ensuring successful fulfillments of the concept and basic design processes. An engineering standard for an organization is an essential means to shorten the time for engineering design, to maintain the engineering quality and to secure the engineering efficiency in the development of the complex system. Korean plant engineering companies'lack of engineering capability comes from the absence of the engineering standard. In the paper, we have developed a steel-making plant engineering standard based on a systems engineering standard. We chose both ISO/IEC/IEEE 15288 and NASA SE Handbook as main reference standards. First, we have introduced a life-cycle definition and a physical hierarchy of a general steel-making plant. Then we have introduced detailed engineering processes of each life-cycle stage. The full scope of the study was from the feasibility study to the basic design but in the paper, we have only introduced detailed engineering processes and exit criteria for the feasibility study and the concept design.

원자력 발전소용 대형 튜브시트 단강품의 개발 (Development of the Large Tubesheet Forgings for Nuclear Power Plant)

  • 김동권;김영득;김동영
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2006년도 춘계학술대회 논문집
    • /
    • pp.176-179
    • /
    • 2006
  • Large tubesheet forgings of the steam generator for the 1,400MW nuclear power plant has been developed. Steam Generator is one of the most important structural part for nuclear power plant. It is manufactured by various steel forgings such as shell, head, torus and tubesheet. These steel forgings have been made by open die forging process. After steel melting and ingot making, open die forging has been carried out to get a good quality which means high soundness and homogeniety of the steel forgings by using high capacity hydraulic press. This paper introduced the forging process development and manufacturing experience of large tubesheet forgings which will be used for the steam generator of 1,400MW nuclear power plant.

  • PDF

Technology Readiness Level Assignment to Industrial Plant System Life Cycle

  • Salim, Shelly;Jo, Raehyeok;Lee, Taekyeong;Lee, Joongyoon
    • 시스템엔지니어링학술지
    • /
    • 제11권2호
    • /
    • pp.1-11
    • /
    • 2015
  • During the industrial plant system life cycle, required technologies are developed and assessed to analyze their performance, risks and costs. The assessment is called technology readiness assessment (TRA) and the measure of readiness is called technology readiness level (TRL). The TRL consists of 9 levels and through the TRL assessment, the technology to be developed and its components are assigned to their appropriate TRL. TRL assessment should be performed in each life cycle stages to monitor the technology readiness and analyze the potential risks and costs. However, even though the concept of TRL has been largely adopted by numerous organizations and industry, direct and clear assignment of target TRL for each life cycle stage has been overlooked. Direct mapping/assignment of target TRL for each life cycle has benefits as follow: (1) the technical risks condition of each life cycle stage can be better understood, (2) cost incurred if the technology development is failed can be analyzed in each life cycle stage, and (3) more effective decision making because the technology readiness achievement for each life cycle stages is agreed beforehand. In this paper, we propose a steel-making plant system life cycle and TRL assignment to each of the system life cycle stage. By directly assigning target TRL for each life cycle stages, we look forward to a more coordinated (in terms of exit criteria) and highly effective (in terms of technical risks identification and eventually prevent project failure) technology development and assessment processes.

대형 튜브시트 단강품의 자유단조 (Open Die Forging of Steel Forgings for the Large Tubesheet)

  • 김동권;김재철;김영득;김동영;김정태
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2004년도 추계학술대회논문집
    • /
    • pp.333-337
    • /
    • 2004
  • Steam Generator is one of the most important structural part of nuclear power plant. It is manufactured by various steel forgings such as shell, head, torus and tubesheet. These steel forgings have been made by open die forging process. After steel melting and ingot making, open die forging has been carried out to get a good quality which means high soundness and homogeniety of the steel forgings by using high capacity hydraulic press. This paper introduced the open die forging process and manufacturing experience of large tubesheet forgings which will be used for the steam generator of 1,400MW nuclear power plant.

  • PDF

제철플랜트용 석탄건조설비에서 운전조건 변경이 건조성능에 미치는 영향 (Effect of Operating Conditions on Drying Efficiency for Coal Drying Facilities in a Steel Making Plant)

  • 전해석;문승재;유호선
    • 플랜트 저널
    • /
    • 제5권4호
    • /
    • pp.73-79
    • /
    • 2009
  • Increase of consumption in limited coal reserves leads prices surging. As a result, iron works which produce products with coal are in difficulties. Accordingly, it is required a lot of research of using non-caking coal that is relatively low cost and has abundant reserves. Direct drying and indirect drying are two major methods of drying the coal. Recently, to minimize the needed calories and to save energy, using fluidbed or fluidizing method is a recent main trend of minimizing the size of the facility and maximizing energy efficiency. However there is also disadvantage such as increasing facility investment because of installing additional facilities in the latter part. In this study, we will have theoretical researches on the indirect drying method with heat exchange system which have been traditionally used. As a result it is expected to increase the efficiency of the facility operation.

  • PDF

대형 압력용기 단강품의 자유단조 (Open Die Forging of Steel Forgings for the Large Pressure Vessel)

  • 김동권;김재철;김영득;김동영
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2003년도 춘계학술대회 논문집
    • /
    • pp.756-759
    • /
    • 2003
  • Steam Generator is one of the most important structural part of nuclear power plant. It is manufactured by welding process of various steel forgings such as shell, head, torus and tube sheet. These steel forgings have been made by open die forging process. After steel melting and ingot making, open die forging has been carried out to get a good quality which means high soundness and homogeniety of the steel forgings by using high capacity hydraulic press. This paper introduced open die forging status and investigated forging method of the ultra large steel forgings which is used for the steam generator of 1000MW nuclear power plant. For the same thing. the type of steel forgings consisting steam generator is classified by shell, head, torus and tube sheet. And corresponding forging processes of the steel forgings have been investigated.

  • PDF

원자로용 대형 헤드 단강품의 자유단조 (Open Die Forging of the Large Head Forgings for Reactor Vessel)

  • 김동영;김영득;김동권
    • 소성∙가공
    • /
    • 제14권6호
    • /
    • pp.565-569
    • /
    • 2005
  • Reactor Vessel is one of the most important structural parts of nuclear power plant. It is manufactured by various steel forgings such as shell, head and transition ring. Head forgings have been made by open die forging process. After steel melting and ingot making, open die forging has been carried out to get a good quality which means high soundness and homogeniety of the steel forgings by using high capacity hydraulic press. This paper introduced the open die forging process and manufacturing experience of large head forgings which can be used for the reactor vessel of 1,000MW nuclear power plant.