In order to solve the problem of calculating the reasonable completed bridge state of a self-anchored hybrid cable-stayed suspension bridge (SA-HCSB), this paper proposes an analytical method. This method simplifies the main beam into a continuous beam with multi-point rigid supports and solves the support reaction forces. According to the segmented catenary theory, it simultaneously solves the horizontal forces of the main span main cables and the stay cables and iteratively calculates the equilibrium force system on the main beam in the collaborative system bridge state while completing the shape finding of the main span main cable and stay cables. Then, the horizontal forces of the side span main cables and stay cables are obtained based on the balance of horizontal forces on the bridge towers, and the shape finding of the side spans are completed according to the segmented catenary theory. Next, the difference between the support reaction forces of the continuous beam with multiple rigid supports obtained from the initial and final iterations is used to calculate the load of ballast on the side span main beam. Finally, the axial forces and strains of each segment of the main beam and bridge tower are obtained based on the loads applied by the main cable and stay cables on the main beam and bridge tower, thereby obtaining analytical data for the bridge in the reasonable completed state. In this paper, the rationality and effectiveness of this analytical method are verified through a case study of a SA-HCSB with a main span of 720m in finite element analysis. At the same time, it is also verified that the equilibrium force of the main beam under the reasonably completed bridge state can be obtained through iterative calculation. The analytical algorithm in this paper has clear physical significance, strong applicability, and high accuracy of calculation results, enriching the shape-finding method of this bridge type.
Purpose: Intussusception is a common cause of intestinal obstruction in children. While most patients can be treated by enema reduction, about 20% require surgery. We investigated the usefulness and feasibility of laparoscopic surgery and the intraoperative risk of bowel resection. Methods: We retrospectively reviewed pediatric patients who underwent surgery for intussusception from 2010 to 2017. We collected data for age, gender, body weight, associated symptoms, duration of symptoms, white blood cell count, operating time, and postoperative complications. Results: Of 155 patients, 37 (23.8%) underwent surgery due to enema reduction failure in 29 (78.3%), recurrence in 6 (16.3%), a suspicious lead point in 1, and suspicious ischemic change observed on ultrasonography in 1. The mean age was $26.8{\pm}18.9$ months (range, 3.5~76.7 months), and the mean body weight was $12.9{\pm}3.9kg$ (range, 5.4~22.2 kg). Laparoscopic surgery was successful in 29 patients (78.4%), and 7 (18.9%) needed bowel resection and anastomosis. The mean operating time was $56.7{\pm}32.8min$. A lead point was found in 3 patients in the bowel resection group (p=0.005); in addition, the operating time and hospital stay were longer in this group. There were no intra- or postoperative complications. Conclusion: Laparoscopic surgery was successful in 78.4% of the patients with a short hospital stay and early oral intake. The only predictive factor for bowel resection was the presence of a lead point. Laparoscopic surgery may be an optimal treatment intervention for children with intussusception, except for those who show initial peritonitis.
Journal of Korean Academy of Fundamentals of Nursing
/
v.6
no.3
/
pp.522-531
/
1999
This research identifies the ingress to egress primary factors that causes a patient to receive delayed emergency medical care. This material was collected between February 1st to 28th, 1998. Research envolved 4,118 people who visited the college emergency medical center in Kyeongido Province, South Korea. Medical records were examined, using the retrospective method. to determine the length of stay and the main cause for waiting. Results are as follows : 1. The age group with the highest admission rate was 10 and under, approximately 1,394 (33.9%). Followed by an even distribution for ages between 11-50 at 10-15% for their respective ranges. The lowest admission rate was 50 years and above. 2. From the 4,118 records examined, 3,489 received outpatient treatment (84.7%); 601 were admitted for inpatient care (14.6%); 25 arrived dead on arrival (0.6%); and 4 people died at the hospital. 3. Between 7PM to 12AM, 42.9% were admitted to the EMC. The hours from 9PM to 11PM recorded the highest admission rate and 5AM to 8AM was the lowest From 8PM to 12AM, the most beds were occupied. 4. For most patients. the average length of stay was approximately 2.2 hours. By medical department, external medicine was the longest for 2.8 hours. Pediatrics was the shortest for 1.6 hours. The average waiting period for inpatient admission was 2.6 hours. Inpatient admission for pediatrics and external medicine was 3.4 hours and 2.2 hours respectively. 5. Theses are primary factors for delay at EMC: 1) pronged medical consultations to decide between inpatient versus outpatient treatment, and delaying to be inpatient, 2) when you call physicians they are delayed to come 3) Understaffing during peak or critical hours, 4) Excessive consulting with different medical departments, 5) some patients require longer monitoring periods, 6) medical records are delayed in transit between departments, 7) repeated laboratory tests make delay the result, 8) overcrowded emergency x-ray place causes delay taking x-ray and portable x-ray, 9) the distance between EMC and registration and cashier offices is too far. 10) hard to control patient's family members. The best way to reduce EMC waiting and staying time is by cooperation between departments, both medical and administrative. Each department must work beyond their job description or duty and help each other to provide the best medical service and satisfy the patient needs. The most important answer to shortened the EMC point from ingress to egress is to see things from a patient point of view and begin from there to find the solution.
Proceedings of the Safety Management and Science Conference
/
2006.04a
/
pp.229-236
/
2006
In the country, already a 400 species and some Interchanges of different Section of Industry have been organized and a number of related industry come to a 4000 species. In this study, we will be helpful to activity of Interchanges of different Section of Industry by concretely suggestion of the utility operation method of Interchanges of different Section of Industry in the many-sided point. But in the present, Interchanges of different Section of Industry stay at a form of a friendly society as yet.
Proceedings of the Safety Management and Science Conference
/
2003.11a
/
pp.309-313
/
2003
In the country, already a 400 species and some Interchanges of different Section of Industry have been organized and a number of related industry come to a 4000 species. But in the present, Interchanges of different Section of Industry stay at a form of a friendly society as yet. In this study, we will be helpful to activity of Interchanges of different Section of Industry by concretely suggestion of the utility operation method of Interchanges of different Section of Industry in the many-sided point.
Proceedings of the Korea Society for Industrial Systems Conference
/
2006.05a
/
pp.345-350
/
2006
In the country, already a 400 species and some Interchanges of different Section of Industry have been organized and a number of related industry come to a 4000 species. In this study, we will be helpful to activity of Interchanges of different Section of Industry by concretely suggestion of the utility operation method of Interchanges of different Section of Industry in the many-sided point. But in the present, Interchanges of different Section of Industry stay at a form of a friendly society as yet.
Proceedings of the Safety Management and Science Conference
/
2002.05a
/
pp.231-236
/
2002
In the country, already a 400 species and some Interchanges of different Section of Industry have been organized and a number of related industry come to a 4000 species. But in the present, Interchanges of different Section of Industry stay at a form of a friendly society as yet. In this study, we will be helpful to activity of Interchanges of different Section of Industry by concretely suggestion of the utility operation method of Interchanges of different Section of Industry in the many-sided point.
Proceedings of the Safety Management and Science Conference
/
2004.11a
/
pp.329-335
/
2004
In the country, already a 400 species and some Interchanges of different Section of Industry have been organized and a number of related industry come to a 4000 species. But in the present, Interchanges of different Section of Industry stay at a form of a friendly society as yet. In this study, we will be helpful to activity of Interchanges of different Section of Industry by concretely suggestion of the utility operation method of Interchanges of different Section of Industry in the many-sided point.
Proceedings of the Safety Management and Science Conference
/
2003.05a
/
pp.203-209
/
2003
In the country, already a 400 species and some Interchanges of different Section of Industry have been organized and a number of related industry come to a 4000 species. But in the present, Interchanges of different Section of Industry stay at a form of a friendly society as yet. In this study, we will be helpful to activity of Interchanges of different Section of Industry by concretely suggestion of the utility operation method of Interchanges of different Section of Industry in the many-sided point.
In the country, already a 400 species and some Interchanges of different Section of Industry have been organized and a number of related industry come to a 4000 species. But in the present, Interchanges of different Section of Industry stay at a form of a friendly society as yet. In this study, we will be helpful to activity of Interchanges of different Section of Industry by concretely suggestion of the utility operation method of Interchanges of different Section of Industry in the many-sided point.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.