• Title/Summary/Keyword: Standardized type EMU

Search Result 3, Processing Time 0.018 seconds

Development and Test of Automatic/Driverless Operation System for Standardized EMU (표준전동차 자동/무인운전장치 개발 및 주행시험)

  • 안태기;이수길;한성호;이관섭
    • Journal of the Korean Society for Railway
    • /
    • v.3 no.3
    • /
    • pp.154-160
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design and testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control and Monitoring System), ATO(Automatic Train Operation), ATC(Automatic Train Control), and TWC(Train to Wayside Communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

Test operation and development of Automatic/Driverless operation system for the standardized type EMU (표준전동차 자동/무인운전기술 개발 및 시운전에 관한 연구)

  • 한성호;안태기;이수길;이관섭;김원경;최규형
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.172-179
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design iかd testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control md Monitoring System), ATO(Automatic train Operation), ATC(Automatic train Control), and TWC(Train to wayside communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

Test running and Development of Automatic/Driverless Operation Equipment for EMU (도시철도차량용 자동/무인운전제어장치(ATO) 개발 및 본선시운전에 관한 연구)

  • Han, Seong-Ho;Ahn, Tae-Ki;Lee, Su-Gil
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1451-1453
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design and testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control and Monitoring System), ATO(Automatic train Operation), ATC(Automatic train Control), and TWC(Train to wayside communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on the 7 line that has been developed on the basis of the standardized type EMU for korea railway systems.

  • PDF