• Title/Summary/Keyword: Standardization System Construction

Search Result 239, Processing Time 0.025 seconds

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

A Strategy of Information Management System for Construction Company (건설산업의 효율적 정보관리체계 구축전략)

  • Lee Tai Sik;Kim Yong Chan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.458-461
    • /
    • 2001
  • The whole of industry sectors are getting achieved BPR(Business process Reencountering) which innovate the inefficient product organization through examined the value chain. Besides, they try to integrate ERP, CRM, and SCM which is based on value chain. Construction Industry, however, not only is not regularized it but is not inadequacy about information mind. Nowadays Korean government lead the construction CALS, only some large company Innovate and restructure the organization and product structure. It Is necessary to efficient manage the project information and historical data and develop CIC/PMIS to transfer from the function based information-flow to the project based information-flow. The purpose of the Information management system's success In Korea, therefore, this paper analyzes the information-intensive problems and proves the device to achieve the Information Management System through the Standardization, Synchronization, Centralization for Construction Company.

  • PDF

A Research on the Development of Management Process System of Public Ordering Service Results and Estimation (건설기술용역 실적 관리 프로세스 시스템 개발에 대한 연구)

  • Lee, Kyu-Sung;Lee, Han-kyu;Kim, Nam-Gon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.168-169
    • /
    • 2014
  • Construction Technology Service is currently hardly managed due to failure to offer standard management system of service performance, company performance, and business evaluation in every Ordering Agencies. After Construction Technology Promotion Act is enforced in May 2014, Ordering Agency obligates them to report to Minister of Land and Transportation within 10 days upon contract/ amendment/ completion. In 2013, in advance to enforcement of this law, performance management system for construction technology service was developed for a test run. However this system only applies to main contractors while management and operation of subcontractors are unavailable that causes problems on connection and integration with Experience Management Trustee. Therefore, this research will establish systematic foundation that enables real-time information of service performance and evaluation of subcontractors to result standardization of performance and evaluation for public ordered services.

  • PDF

Development of the Railroad Geotechnical Information Management System Using Web GIS (웹 GIS 기반 철도 지반정보 관리프로그램의 개발)

  • 황선근;이성혁;김현기;김정무
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.1
    • /
    • pp.20-25
    • /
    • 2004
  • Railroad geotechnical information management system was developed by using Web GIS and DB in this study. The standardization of railroad geotechnical information is progressed by classifying three groups as like basic informations, vibration informations along railway lines and design drawings. The basic informations consisted of basic and dynamic properties of soils, geophysical exploration and seismic survey/exploration. And the specification for 'human exposure to whole-body vibration' was adopted to construct the vibration informations along railway lines. The informations as like drawings and photographs were saved by changing to graphic files in the standardization of design drawings. In the case of standardization of geographical information, the topographical maps(NGIS, 1:5000) were primarily used as digital maps. Another digital maps(KRRI, 1:5000) and their geographical DB based on NGI code system were added on this maps. The standardized informations were used to construct their database. And railroad information management system was developed using Entity-Relation(ER) model which had a good feasibility for expansion and transition to other system in designing stage of database. This system consisted of layer selection, search and analysis of geotechnical informations and Zeus DB was adopted for GIS operating and user interface. This system could be a good tool for saving, searching and analyzing the geotechnical and geophysical informations. These DB systems would offered the basic informations to plans, design and construction of railroad lines etc. in practical use.

A Study on the Nucleus System of Standard Hospitals in U.K. (영국의 표준병원에서 뉴클리우스 시스템에 대한 연구)

  • Moon, Chang-Ho
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.3 no.4
    • /
    • pp.59-68
    • /
    • 1997
  • This study is intended to review the Nucleus System of standard hospitals in U.K. The research is focused on the theoretical background, contents of Nucleus System, and the operational problems through the survey of sample hospitals. The contents of research include the development history of standardization, outlines, aimes, advantages, the data of Nucleus system, and the study-visits of sample hospitals. The conclusion could be summarized as follows ; 1) The form of standard hospitals is compact and low-rise the major movements are horizontal. The standard plans of the functional dpartments are unified as cruciform with $15m{\times}15m$ module. 2) The Nulceus System has been developed. The hospitals have 3 stories maximum and courtyards for natural light & ventilation. 3) The advantages of Nucleus System includes reduction of design & construction period, the buildability due to the repetitive construction, and the running cost. And the disadvantages are mentioned as the lack of storage, staff accomodation, pantry, and sanitary facilities. 4) Sample hospitals provide human scale, possibilities of growth & change, and curing environment from art decoration & artificial lake. 5) In case of Korean situation, even the minimum standardization such as hospital design guidelines should be developed in near future.

  • PDF

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.

Proposals On The Designe, Construction, Management Maintenance standardization Method Of Mechanical Field Fire Protection System By NFSC (화재안전기준(NFSC)에 따른 기계분야 소방설비 설계, 시공, 감리 유지관리 업무 표준화 방안에 대한 제안)

  • Kim, Sung-Il;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.3
    • /
    • pp.11-17
    • /
    • 2017
  • The study seeks to cooperate with the investigation of a fire investigation based on public-private partnership. Fire protection systems provide a wide variety of viewpoints from the perspectives of design, construction, management, maintenance, maintenance and maintenance systems at a particular point in time, construction, management, and maintenance systems. What is controversial is that there are illegal activities such as illegal activities of the Patent Office, misconduct of construction work and unreasonable construction of construction works.As a theoretical framework, the present study identified the four key elements of a successful disaster response system : responsiveness, control, professionalism, and bias.

A Study on Ken Ichiura's Research Activities of 'Dwellings' - Focused on 1930 to 1945 (시포건의 "주택" 분야 연구활동에 관한 연구 - 1930년부터 1945년까지를 중심으로 -)

  • Kim Jin-Mo
    • Journal of the Korean housing association
    • /
    • v.17 no.1
    • /
    • pp.9-17
    • /
    • 2006
  • In the modem society of Japan, specially before and after the World War II, one of the most important problem is socially to build housing of working classes. In those days, Ken Ichiura had been led the dwelling of modem Japanese architecture. He had worked in wide spheres of action like private residence, public housing, collective housing area and urban planning for about fifty years. But until now, because studies on public housing of Japan has been discussed only aspect of architectural design, there was almost no study about Ken Ichiura who acted in practical affairs. So this study aims to consider about the Ken Ichiura's research on dwelling and the relation with the then social circumstance. It was summarized as four details of Ken Ichiura's activities on Dwellings before the end of World War II. First, he proposed half-government-supervised system by economic reason on provision of dwellings. Second, he proposed dry construction system by material and structural reason on economic and stability supply. Third, he proposed standardization and industrialization by economic reason on industrialization form material to construction of industry. And the last, he also proposed standard plan and standard design by economical and mass production supply dwellings during the war.

A Preliminary Study of the evaluating and improving WLCM for construction project based on BIM (BIM기반 프로젝트의 WLCM (Whole Life-Cycle Management) 적용모델 개발을 위한 기초연구)

  • Lee, Geun-Ho;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.13-14
    • /
    • 2011
  • The main purpose of this research is to propose standardization of construction components design with BIM and to develop WLCM Framework and Application System for supply chain management on interaction of stakeholders based on proposed standard component. To accomplish main purpose of this research, we planned three years period, in first year, we will develop model for building lifecycle based on BIM, and this model can give the chance of collaboration with stakeholders of building project. In second year, we will develop WLCM system with model, and to improve performance of application model/system. This study can contribute on reduction of whole lifecycle cost, with preventing omission of factors on cost reduction possibility, develop concurrent engineering framework for construction stakeholders with proposed BIM.

  • PDF

The Development of Automated Building Equipment Design System Using 3D CAD Building Information (3차원 CAD정보를 활용한 건축설비 자동화시스템 구축에 관한 기초연구)

  • Song, Kyoo-Dong;Song, Seung-Yeong;Jeung, Woo-Shin
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.357-360
    • /
    • 2007
  • In the area of domestic construction industry, recently, standardization of construction. globalization of constructional and a building information arc required to advance increase productivity, shorten the term of works and reduce the cost of construction. The objective of this is to offer basic data of process new thesis and development for automated building equipment design system based on 3D CAD building information. This study contribute the development of automated Building equipment design system based on 3D which helps to conduct the equipment design handily and quickly.

  • PDF