Journal of The Korea Institute of Healthcare Architecture
/
v.13
no.4
/
pp.25-35
/
2007
In Germany, community based daycare facilities has been supported by long term care policies since the 1970s. With the legislation of Care Insurance, those policy has been developed further. As the use of daycare facilities decreased and the financial burden for consumers increased, administrators of facilities has been seeking for innovative programs and management methods in order to improve the service. For the same reason, policy makers have been pursuing new regulations of architectural standards of facilities. By looking at legislations (i.e., Law of Care Insurance, Law of Heim, and DIN18025) that stipulate architectural standard of facilities in Germany, this study will identify the development process of architectural change of daycare facilities. In addition, the study aims to contribute to the discussion on the use of day care facilities in Korea in terms of the legislation of Care Insurance soon to be introduced.
Proceedings of the Korean Institute of Interior Design Conference
/
2007.05a
/
pp.49-52
/
2007
The purpose of this study was to investigate unit care characteristics of large skilled nursing facilities for the elderly, which are located in city areas, and to discuss the way of encouraging home-like atmosphere in perspective of spatial unit. First of all, the analysis of five facilities opened before 2002 was performed, based on previous studies, to compare with them opened in recent 5 years. Most of the previous facilities did not have differentiation between their residential and nursing units, and the number of residents in each unit were excessive in comparison with the standard limit(12-28). On the contrary, the facilities established in recent 5 years had systematic spatial unit structure. The residential units had basically rooms and spaces for small group and the number of elderly residents per unit was appropriate on the basis of standard limit which was suggested by Kwon(2002). The nursing units were consist of nursing station, 2-3 residential units, spaces for large group of residents, hair dressing, nurse, living assistant, bathing, storage and etc. But, there was a problem In space usage even though they have distinct unit care systems. Some spaces for groups were empty without residents, furniture, and other equipments, which were necessary for unit care.
Urban transit system consist of complex system such as vehicle, signal, train control equipment, railway facilities, electricity facilities, station facilities and information & communications facilities. So a study on construction of management system for complex system. using system-engineering tool, Urban transit standardization of steps 2 perform architecture for urban transit standardization, requirement management and data-base construction. A study expect that provide more efficient and methodical information system to all user for using standardization.
The analysis of reliabilities of process facilities often uses models based on the Weibull distribution. The parameters in these models are functions of operating conditions, and determined by experiments. Using these values, we calculate the reliability, mean time to failure, and standard deviation. The conventional method assumes that the operating condition is constant, and thus treats the model parameters as constants. In this paper, a reliability function is proposed which is applicable when the scale parameter is a function of time, and an analysis method based on this is also presented. A case study on a cooling fan resulted in a big difference from the conventional method to which the average operating conditions were applied. The proposed method is also applicable to other process facilities, and expected to effectively take into account the effects of changes in the operating conditions on the reliabilities of the facilities.
Journal of the Korean Society for Library and Information Science
/
v.38
no.4
/
pp.167-178
/
2004
The purpose of the study is to identify the degree of relevancy on the facilities for the older persons in the public library buildings. To achieve the purpose, the study has researched and analyzed' the guidelines of the law contributing to the convenience of the handicapped, older persons, pregnant women etc(1999)' for the older persons accessing to the facilities in the public library buildings. And then, the older persons' physical standard sizes in 'Size Korea(1997)' are researched and reconfigured. The study has selected the 10 kinds in such facilities as followed : Door, Accessible Route, Stair, Elevator, Escalator, Ramp, Toilet Stall, Urinal, Table, and Post Box. As the result, the study has identified the relevancies of each facilities based on the older persons's physical standard sizes.
Journal of The Korea Institute of Healthcare Architecture
/
v.24
no.1
/
pp.7-14
/
2018
Purpose: This study analyzes mental healthcare delivery services and types of facilities, the status of installation and operation, and planning standard. The purpose of the study is to propose a basic data for the performance of related research and work tasks, along with an understanding of the Chinese mental healthcare facility type and support system. Furthermore, it will show a lack of current function management as the changes of mental health concept and demand for services increases, and it is intended to provide implications for the construction of mental health facilities. Methods: This study was conducted by a research on law and regulation of China's mental healthcare delivery service system and mental healthcare facility. The analyzed data are the national standard GB, the optional national standard GB/T, the building construction standard JGJ, and the report issued by the Health Planning and Development Committee. Results: At present mental healthcare facility construction in China is in the period of rapid development and it exposes the layout of medical facilities, which is not currently reasonable and the service does not reach the designated position and so on. Overall, it requires more detailed guidelines to enhance the quality of mental healthcare service. Implications: It is expected that the research of this paper will provide effective reference for future research on Chinese Mental healthcare system and facilities, and can promote construction of Chinese mental healthcare facility theory in perfect condition.
The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.
Lee Seong-Won;Kim Seung-Hwan;Shin Seung-Kyo;Kim Tae-Wook
Proceedings of the KSR Conference
/
2005.05a
/
pp.550-555
/
2005
In this research, safety requirements for guard rail, buffer stop, car stop scotch block, protection device, fire protection facilities, safety siding, escape facilities and inundation protection facilities are studied to establish a standard. First, various kinds of guard rails and their construction methods are investigated. Researches on the level difference of main track and guard rail, joint, length, and fastening force of guard rail are done. Second, the classification of buffer stop and car stop scotch block and its characteristics are examined, and the impact force, speed limit and capacity of buffer stop are summarized. Details of protection device, fire protection facilities, safety siding, escape facilities and inundation protection facilities are also investigated. From this fundamental research results, basic data on the safety facilities of railroad system are established.
The standardization of information communication is doing a Internal each other connection and each other characteristic stability operation security in objective. From the low-speed network of the subway operation beginning currently it changes with the superhigh speed digital information transmission communication service environment which is a quality service, the hazard which plans the quality improvement of the efficient communication service use which hits to here and passenger service the standardization of the technical standard which stands and the improvement which hits to an engineering standard and facility must come to accomplish. The facility which existing is been old or the enclosure communication equipments which are insufficient. it improves, establishment itexpands efficiently, like this facilities it is stabilized and it is economic and rationally use maintenance it manages with the plan for the inside and outside of the country information communication relation technical standard and engineering standard service feature improvement and future expandability and economical efficiency, the possibility of having a pliability in order to be, rational technical standard and standard it takes a triangular position, efficient characteristic security of information communication service there is a place objective which promises the rational development of course city railroad communication system with character. Function improvement of enclosure communication base equipment, against an improvement and standardization plan it described trom the prosecution which it sees.
Journal of The Korea Institute of Healthcare Architecture
/
v.22
no.4
/
pp.57-66
/
2016
Purpose: According to the trend of the global burden of disease, in the future our society is expected to face with gradually increasing problems related to mental health and the demand for the various types of quality mental health facilities. This study investigates whether the accreditation of Mental health facilities serves as a building evaluation tool, and contribute to environmental welfare of the mentally ill. Methods: The facility assessment items related to architectural design are extracted through the analysis about the accreditation program of KOIHA. Extracted items should review if they comply with the relevant regulations, and establish building design standard. Results: This study shows that the accreditation of KOIHA can certify psychiatric hospitals meet the legal requirements, the minimum standard of facilities. But it is not the evaluation of environmental quality. It is difficult to assess the quality of facility in terms of architectural design, because it has no specific standards or the level of assessment. Implications: The accreditation for mental health facilities should be able to provide the right and opportunity to choose a more quality facility for the customer. The introduction of a certification system for the evaluation of environmental quality is required in order to overcome the limitations of the accreditation of KOIHA. Development of design guidelines for mental health facilities that are the basis for certification should be also followed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.