A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

Dental implant cost by top-down approach (하향식(Top-down)방식을 적용한 치과 임플란트 원가산정)

  • Shin, Hosung;Kim, Min-Young
    • The Journal of the Korean dental association
    • /
    • v.52 no.7
    • /
    • pp.416-424
    • /
    • 2014
  • The purpose of this study is to analyze the cost of dental implant by top-down method and, on that basis, to provide salient information for the suitable standard of dental insurance fee. A survey data and accounting documents from 36 samples of dental clinics secured with the organisation authority are used and analysed for extracting the representative sample of dental clinic. A researcher visited the dental clinics in person and conducted additional interviews in the omitted case of accounting documents. A dental implant cost by top-down method was estimated to 1,430,000 won. Labor cost accounted for 43% of the total cost structure, ranking it 1st and, management cost, material cost and interest cost on investment cost in order are investigated. Labor cost counts of the total cost that shows the similar aspect to the existing result. Cost in cost accounting of medical care would be used for the judge that cost pursed value for dental service, not price or fee.

A Study on DEM-based Automatic Calculation of Earthwork Volume for BIM Application

  • Cho, Sun Il;Lim, Jae Hyoung;Lim, Soo Bong;Yun, Hee Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.2
    • /
    • pp.131-140
    • /
    • 2020
  • Recently the importance of BIM (Building Information Modeling) that enables 3D location-based design and construction work is being highlighted around the world. In Korea, the road map has been established to settle the design based on BIM using drone survey results by 2025. As the first step, BIM would be applied to road construction projects worth more than 50 billion Korean Won from 2020. On the other hand, drone survey regulation has been enacted and the data for drone survey cost were also included on Standard of construction estimate in 2020. However, more careful improvement is required to reflect drone survey results in BIM design and construction. Currently, Engineering instructions and Standard of construction estimate specifies that earthwork volume must be calculated by cross section method only. So it is required to add the method of DEM (Digital Elevation Model) based volume calculation on these regulations to realize BIM application. In order for that, this study verified the method of DEM based earthwork volume calculation. To get an accurate DEM for accurate volume computation, drone survey was carried out according to the drone survey regulation and then could get an accurate DEM data which have errors less than 3cm in X, Y and 6.8cm in H. As each DEM cell has 3D coordinate component, the volume of each cell can be calculated by obtaining the height of area of the cell then total volume is calculated by multiplying total number of cells by volume of each cell for the construction area. Verification for the new calculation method compare with existing method was carried out. The difference between DEM based volume by drone survey and cross section based volume by traditional survey was less than 1.33% and it can be seen that new DEM method will be able to be applied to BIM design and construction instead of cross section method.

A Study for the Improvement on Use Transparency of the Occupational Safety and Health Management Cost in Construction (건설업 산업안전보건관리비 사용 투명성 강화 방안 연구)

  • Lee, Sun Yong;Jeong, Seong-Choon;Oh, Se Wook
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.1
    • /
    • pp.34-44
    • /
    • 2020
  • The purpose of this study is to suggest ways to improve the transparency of occupational safety and health management cost (OSHMC) in order to create a safe working environment that can guarantee the health of construction workers. It was performed in the following procedures and methods. (1) collecting and analyzing resources related to the OSHMC in construction, (2) gathering stakeholder opinions for interviewing actual conditions, (3) deriving the improvement plans based on survey results and (4) suggesting direction for improvement of related laws based on the results of the research. As a result of this study, the following ways were found to be effective for enhancing transparency of the OSHMC in construction. (1) disclosure of usage details in sites, (2) Expansion of the standard for the OSHMC in construction, (3) Increase in fines for false use, (4) Establishment of the plan to improve the OSHMC ratio of small-scale construction sites, (5) Strengthen the role of supervisory and support organizations such as the Ministry of Employment and Labor and the Korea Occupational Safety & Health Agency. The result of this study is expected to be used as a basic data for future improvement of the occupational safety and health acts in Korea.

A Study on the optimum scale of the number of beds of both the standard and the high-class (기준병상수와 상급병상수의 적정규모에 관한 연구)

  • Back, Seung-Joon;Yu, Seung-Hum;Sohn, Tae-Yong
    • Korea Journal of Hospital Management
    • /
    • v.6 no.3
    • /
    • pp.109-129
    • /
    • 2001
  • The purpose of this study was the acquisition of the optimum scale of the apportionment of standard & high-class bed for the maximum profit representative of the desire of customers in a General Hospital with 1,100 beds located in Seoul. This investigation was proceeded by the analysis of the result of the simulation with the survey of both the patients' needs for bed and the degree of the medical service by the grade of the ward. And finally the consequence was obtained as follows: 1. The result of the investigation of the inpatients' preference for the grade of ward classes shows that a private ward reflected 4.3 percent, a semi-private ward 1.7 percent, a three-bed ward 0.1 percent, and a ward with six beds 93.9 percent each other. 2. A questionnaire poll was paralleled of service terms of a medical doctor and a nurse by ward class, the data were used for the standard of the allotment of labor cost by the ward class. The poll shows that the service tenn of a medical doctor and a nurse based on a ward with six beds by ward class showed 1.7 times in internal medicine and 1.9 times in surgery at a private ward; 1.4 times in internal medicine and 1.7 times in surgery at a semi-private room; and 1.2 times both in internal medicine and in surgery at a three-bed ward 3. The resultant findings revealed the most profit per bed and per patient in a private ward. However, an analysis of profit with a standard of unit area by ward class represented a higher profit in both the internal medicine and the surgery semi-private ward than other ward classes. 4. The result of the analysis through simulation based on the data of the prime cost per the ward class proved the optimum scale of the distribution of beds by class as follows: sixteen beds of the internal medicine and twenty three beds of the surgery in the private ward; two hundreds and two of the internal medicine and one hundred and ninety eight of the surgery in the semi-private room; three of both the internal medicine and the surgery each other in the three-bed ward; one hundred and ninety eight of the internal medicine and two hundred and fifty two of the surgery in the ward with six beds. The result of this research exhibits that the income and expenditure of the hospital could be improved by changing parts of wards into private ones(containing the maximum profit per a unit of width) in case the scale of the number of beds is reset with the consideration of the profit per the unit width. In the near future it's strongly expected that the research for the more scientific standard of the allotment of labour cost by ward class and for definition of the optimum scale of the number of beds that actualize the maximum profit with the change of the three elements of the prime cost: cost of materials; labor costs; management expenses.

  • PDF

Cost Analysis for Dentures Performed at Dental Clinics in Korea (치과의원 의사의 틀니진료 원가 분석)

  • Chung, Seol Hee;Lee, Hye Jin;Oh, Ju-yeon;Woo, Kyung suk;Kim, Han sang
    • Health Policy and Management
    • /
    • v.25 no.2
    • /
    • pp.107-117
    • /
    • 2015
  • Background: The purpose of this study is to analyze the cost for the denture treatment in accordance with the government's plan to expand the National Health Insurance coverage for dental prothesis from July 1, 2012. Methods: We developed the draft of classification of the treatment activities based on the existing researches and expert's review and finalized the standard procedures through confirming by Korean Dental Association. We also made the list of input at each stage of treatments. We conducted survey of 100 dental clinics via post from April 4 to May 20 in 2011 and 37 clinics took part in the survey. The unit of cost calculation is the process from the first visit for denture treatment to setting of denture and adjustment. The manufacturing process performed by dental technician was not included in the cost analysis. Results: The process for the complete denture treatment was classified with 10 stages. The partial denture treatment was classified with 8 stages. The treatment time per each denture is about 5.6 hours for complete dentures and about 6.6 hours for partial dentures. The treatment cost were from 591,108 won to 643,913 won for complete denture and from 670,219 won to 738,840 won for partial denture in 2011, depending on the location, type of the clinics and the types of physician's income. Conclusion: This study shows the example of cost analysis for the treatment to set the fee schedule. Measures to get representative and accurate information need to be made.

The Improvement of Tunnel Construction Cost Standards Considering the Site Conditions in Korea (현장실태를 고려한 국내 터널공사 공사비산정기준 개선)

  • Ahn, Bang-Ryul;Lee, Han-Soo;Oh, Jae-Hoon;Song, Tae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.26-35
    • /
    • 2020
  • Tunnel construction is an important part of Korean public construction projects. Although the development of various equipment and technologies has led to advances in tunnel construction methods that are implemented on sites, the cost standards related to such works do not yet reflect the realities of the construction sites. A literature review and site surveys were conducted to suggest reasonable cost standards for tunnel work that reflects the realities of the field. First, each item in the cost standards for tunnel work, as established in the Construction Standard Production Rates, were analyzed. The results were compared with the actual costs implemented on tunnel projects. The key items analyzed included those regarding the work cycle time, such as rock classification, profiling survey, drilling speed, and muck-disposal processing equipment combination, as well as the number of people put to tunneling work. Based on the site survey results, improved estimates regarding the cycle time per one tunnel drilling blast, drilling speed of the machine, muck disposal processing equipment combination, and the number of people put to tunneling work were suggested. This study suggests the cost standards that reflect the realities of tunneling sites. The results are expected to help ensure adequate costs for tunnel construction projects.

A Study on the Cost Criteria for Street Tree Pruning through Field Survey (현장실태 조사를 통한 가로수전정 원가기준 마련 연구)

  • Oh, jar-hoon;Ahn, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.210-211
    • /
    • 2022
  • Pruning is the most important work for the growth and aesthetics of street trees. It is also the most actively conducted maintenance work. However, the specifications, application methods, and cost criteria for pruning have not been systematically established. This has recently caused a lot of confusion in the practice of street tree pruning, such as indiscriminate pruning and lack of construction costs. Therefore, this study clarified the contents of work according to the form of pruning. It added 'aesthetic pruning,' which takes into account design. In addition, It revised equipment not in conformity with the law and excluded personnel necessary for on-site traffic control so that they could be reflected separately. As a result, this study is expected to contribute a lot to securing appropriate construction costs for maintaining street trees.

  • PDF

A Study for Time Standard Estimation with Activity Sampling Method (가동샘플링기법에 의한 표준시간추정에 관한 연구)

  • 이근희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.6 no.9
    • /
    • pp.1-5
    • /
    • 1983
  • This study takes over the application of survey sampling theory to activity sampling and the application of activity sampling to time standard estimation. Cluster, stratified, and multistage sampling are studied in conjunction with random and systematic sampling. Estimation procedures that will maximize the information obtained per cost expended on the study and specification of the procedure to be used to estimate the accuracy of the estimates for the adopted procedure are considered. The use of multiple regression md linear programming to estimate standard element performance time from typical job lot production data is also considered.

  • PDF

A Criterion for Estimating Supervision Cost Considering the Change Factors by Construction Works (공사별 변동요인을 고려한 적정 감리대가의 산정기준 연구)

  • Lee, Bae Ho;Kang, Leen Seok;Lee, Yang Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.5
    • /
    • pp.1199-1208
    • /
    • 1994
  • In the country, supervision cost is being estimated by percentages of construction cost or cost plus a fixed fee without a reasonable standard. This type has no function for adjusting supervision cost according to variables, such as construction work complexity, extent of supervisory services, fluctuations in prices. In this study, an objective criterion to estimate supervision cost with improved supervisory services has been developed, in which adjusting functions as stated above should be properly considered. A comparative study of supervisory service systems in foreign countries and a survey through questionnaire were carried out for the study. An objective criterion from the results is proposed in the form of an expression or table.

  • PDF