• Title/Summary/Keyword: Standard facility

Search Result 926, Processing Time 0.029 seconds

SAMPLING BASED UNCERTAINTY ANALYSIS OF 10 % HOT LEG BREAK LOCA IN LARGE SCALE TEST FACILITY

  • Sengupta, Samiran;Dubey, S.K.;Rao, R.S.;Gupta, S.K.;Raina, V.K
    • Nuclear Engineering and Technology
    • /
    • v.42 no.6
    • /
    • pp.690-703
    • /
    • 2010
  • Sampling based uncertainty analysis was carried out to quantify uncertainty in predictions of best estimate code RELAP5/MOD3.2 for a thermal hydraulic test (10% hot leg break LOCA) performed in the Large Scale Test Facility (LSTF) as a part of an IAEA coordinated research project. The nodalisation of the test facility was qualified for both steady state and transient level by systematically applying the procedures led by uncertainty methodology based on accuracy extrapolation (UMAE); uncertainty analysis was carried out using the Latin hypercube sampling (LHS) method to evaluate uncertainty for ten input parameters. Sixteen output parameters were selected for uncertainty evaluation and uncertainty band between $5^{th}$ and $95^{th}$ percentile of the output parameters were evaluated. It was observed that the uncertainty band for the primary pressure during two phase blowdown is larger than that of the remaining period. Similarly, a larger uncertainty band is observed relating to accumulator injection flow during reflood phase. Importance analysis was also carried out and standard rank regression coefficients were computed to quantify the effect of each individual input parameter on output parameters. It was observed that the break discharge coefficient is the most important uncertain parameter relating to the prediction of all the primary side parameters and that the steam generator (SG) relief pressure setting is the most important parameter in predicting the SG secondary pressure.

Effects of Regular Inspection Facility Standards Improvement on Particulate Matter (PM10) Emissions (정기검사 시설기준 개선이 입자상물질(PM10) 배출에 미치는 영향)

  • Choi, Soungkyu;Kim, Yongdal;Lee, Jaeyoung;Kim, Hogyeong;Noh, Kiseong;Park, Jungsoo
    • Journal of Auto-vehicle Safety Association
    • /
    • v.11 no.1
    • /
    • pp.36-39
    • /
    • 2019
  • The particulate matter that was emitted always come up by atmospheric environmental problem. Running on the road vehicles must have regular inspection at regular period and make sure the emissions of exhaust gases exceed the legal standards. Emission test for the atmospheric environment, but it is not free from the particulate matter. Currently, emission test of vehicle inspection is divided into regular inspection and close inspection. Regular inspection and close inspection differ not only the method of emission test, but also the facility standards that must have for this inspection. According to the "Regulations on the Implementation of Comprehensive vehicle Inspection, etc.", close inspection must have trapping device that is trap particulate matter by emission test to vehicle. However, regular inspection is different. Regular inspection do not specify any criteria for trapping facilities. Therefore, this study is confirm how to prevent the emission of particulate matter to the atmosphere during the year when mandatory trapping facilities are required to trapped particulate matter in the regular inspection.

The Study on the Analysis of Elemental Maintenance Costs for Educational Facilities

  • Hyun-Wook Kang;Seung-Wook Lee;Sung- Ryul Bae;Byoung-Jun Min;Moon-Sun Park;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1254-1259
    • /
    • 2009
  • The purpose of this study is to analyze elemental maintenance costs for educational buildings. The adapted research method selected three school buildings in Seoul as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and to estimate analyzed maintenance costs through that system. According to the analysis, the study proposed a partial maintenance costs standard and analyzed proper maintenance costs. The results of this study are as follows 1) The system is divided into 8 large-groups and 24 small-groups for the analysis elemental maintenance costs. 2) The average rations followed by analysis of partial maintenance costs of the three school buildings are as followings, the total maintenance costs are analyzed 3,992 million won and each part of average rations is exterior of building 10.9%, interior of building 41.58%, electricity & fire fighting facility 14.22%, water supply & healthy facility 11.39%, heating & water supply facility 12.93%, landscape 6.3%, civil engineering works 2.69%.

  • PDF

Design standard for fairway in next generation

  • Ohtsu, Kohei;Yoshimura, Yasuo;Hirano, Masayoshi;Takahashi, Hironao;Tsugane, Masanori;Ohtsu, Kohei
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.10a
    • /
    • pp.230-239
    • /
    • 2006
  • The depth, width and alignment of fairway that are main port water facilities should be designed considering the various elements including particulars of design ships, weather and sea conditions around fairway and method of ship-handling. However not only the existing Japanese design standard for fairway and also those of other countries do not take into consideration of such kind of elements and no design standard is made by quantitative analysis. In this circumstance the new design standard (Approach Channels, A Guide for Design) depending on classified various elements and quantitative analysis was proposed in 1997 by PIANC and IAPH. But it was proved that calculated values according to this standard were unfounded and had some problems to output the discontinuous value by small difference of calculation condition because the each value fur each element was simply added. And also it is hard to apply this standard to the design of port water facilities in Japan because this [A Guide for Design] is the design standard for long channels in European port. The proposal of more reasonable Japanese standard will be expected by applying the study result of naval architecture and navigation and by the cooperation of ship operators to use fairway, naval architects to built ships and civil engineers to dredge fairway. The concept of a fairway in 'Design standard fur fairway in next generation' is defined as passage for approach channel) and traffic lane designated by light buoys as navigable water for safe navigation. In 'Design standard for fairway in next generation' depth, width and alignment are picked up among many design elements of a fairway. Design method for those elements is shown based on design ships and navigational environments. This standard shows the method of design for each dimension depending on characteristic on design ship and weather and sea condition. On the other hand, in case of existing fairway, it is possible to decide the size of ship and navigation criteria by opposite analysis.

  • PDF

A Study of the Rationalization of Handling Facility Safety Management Standard for Hazardous Chemicals : Focusing on Dike (화학물질 안전관리 시설기준 합리화 연구 : 방류벽 중심)

  • Kim, Nam-Suk;Yoo, Byung-Tae
    • Journal of the Korean Institute of Gas
    • /
    • v.24 no.2
    • /
    • pp.29-35
    • /
    • 2020
  • The Chemical Control Act has revised in 2015 to promote chemical safety, particularly enhancing the standards for the installation and management of hazardous chemical handling facilities. However, in some existing facilities, it was difficult to comply with some facility standards because of lack of land, safety accident possibility during rebuilding. In this study, we attempted to provide a more rational approach of dike standard which was the highest(2017: 117, 2018: 83) complaint for two years(2017~2018, 1,087) by prior study, FLACS simulation, analyze safety management standard and conduct a survey. Therefore, considering the purpose of installing the discharge wall only at existing facilities in operation, additional sensors that can detect chemical leakage and leakage were recognized as an additional alternative to installing and operating closed circuit television (CCTV). This will help the safety and cost aspects of small or medium-sized businesses or small and medium-sized enterprises that cannot secure legal grounds or fail to enforce legal regulations due to economic problems such as construction costs.

Analysis on Timely Refusal to Accept Discrepant Documents in Documentary Credit Transactions -with a special emphasis on Federal Bank Ltd. v. VM Jog Engineering Ltd, Indian Supreme Court Decision- (화환신용장 거래에서 은행의 불일치서류 거절의 적시성에 관한 연구 -Federal Bank Ltd. v. VM Jog Engineering Ltd.의 사건에서의 인도 최고법원의 판결을 중심으로-)

  • Hahn, Jae-Phil
    • Journal of Arbitration Studies
    • /
    • v.16 no.3
    • /
    • pp.161-189
    • /
    • 2006
  • This paper is aiming at analyzing case law of India in relation with reasonable time to make decision whether to accept or to refuse the documents received from the presenter in credit transactions. As specified in UCP, the failure to refuse to accept the documents within a reasonable time precludes the Issuing Bank, Confirming Bank (if any) and Nominated Bank from asserting that they are discrepant. Compliance of the stipulated documents on their face with the terms and conditions of the credit shall be determined by international standard banking practice as reflected in this Articles of UCP 500. The Issuing bank is only to be held responsible for honoring the documents presented by beneficiary through the nominated banks if they are strictly in compliance with terms and conditions of the Credit. As any well experienced banker knows, however, a word-by-word, letter-by-letter correspondence between the documents and the credit terms means a practical impossibility. Thus the notion of reasonable care in conjunction with the doctrine of strict compliance mixed with International Standard Banking Practices has not played a right functional standard for checking the documents as stipulated in the credit and UCP 500. And so the rejection rate is highly estimated at approximately 50% in EU and 40 to 70% according to their geographical locations in the USA. As a result, it can possibly be inferred from this fact that the credit industry would be facing the functional failure as the international trade credit facility, if not supported with motive power as a relevant scheme in UCP 500. It is quite important to note that UCP 500 Article 13(b) which specify the time limit for the banks to notify the presenter their decision not to accept the documents within a reasonable time not to exceed seven banking days following the day of receipt of documents would be the motive engine to improve the negotiability of documents in international trade financial facility.

  • PDF

Status of Laboratory Biosafety and Biosecurity in Veterinary Research Facilities in Nigeria

  • Odetokun, Ismail Ayoade;Jagun-Jubril, Afusat Toyin;Onoja, Bernard A.;Wungak, Yiltawe Simwal;Raufu, Ibrahim Adisa;Chen, Jessica Corron
    • Safety and Health at Work
    • /
    • v.8 no.1
    • /
    • pp.49-58
    • /
    • 2017
  • Background: This study determined current status of laboratory biosafety in Nigerian veterinary research facilities. Methods: A questionnaire was developed to obtain information from researchers across Nigeria from July 2014 to July 2015. Information regarding demographics, knowledge of laboratory biosafety, availability and proper use of personal protective equipment (PPE), any priority pathogens researched, attitude on and use of standard laboratory practices, and biosafety awareness was obtained using a numeric scoring system. Data were analyzed with descriptive statistics, and univariate and multivariate logistic regression. Results: A total of 74 participants from 19 facilities completed the questionnaire. General knowledge scores ranged from 3 to 28 (out of 28 possible points), with 94.6% of respondents receiving low scores (scores < mean + 1 standard deviation). Very few (17.6%) reported availability or use PPE. Many participants (63.5%) reported no access to biosafety level (BSL)-1-3 facilities. None reported availability of a BSL-4 facility. Knowledge scores pertaining to biosafety management practices ranged from 0 to 14 (out of 14 possible points) with 47.3% of respondents receiving good scores (scores > mean + 1 standard deviation). Only 16.2% of respondents (from four facilities) reported having biosafety officers. Rabies virus was the most researched pathogen (31.1% of respondents). The majority (71.6%) were unaware of laws guiding biosafety. Researchers [odds ratio (OR) = 18.0; 95% confidence interval (CI): 1.63, 198.5; p = 0.023], especially in BSL-2 (OR = 258.5; 95% CI: 12.71, 5256; p < 0.001) facility of research institute (OR = 25.0; 95% CI: 5.18, 120.6; p < 0.001), are more likely to have adequate access to and properly utilize biosafety devices and PPE. Conclusions: Current knowledge of laboratory biosafety is limited except among a few researchers.

Development of Standard Checklist for Safety Management of Toxic Gas facility in Domestic University Laboratory (국내 대학 실험실 독성가스 시설의 안전관리를 위한 표준 체크리스트 개발)

  • Lee, Sungjin;Kim, Byung-Duk;Ha, Dong-Myeong
    • Journal of the Korean Institute of Gas
    • /
    • v.19 no.6
    • /
    • pp.92-98
    • /
    • 2015
  • Toxic gases are managed by High Pressure Gas Safety Control Act. Toxic Gases are "31 designated species and each gas of which the permissible concentration($LC_{50}$) is equal to or less than 5000 ppm as defined in High Pressure Gas Safety Control Act.". Korean toxic gas usage in accordance with the growth of the electronic industry has increased explosively. The demand of toxic gas research in domestic university laboratories has grown together. But the research associated with toxic gas safety management in the domestic laboratory is nonexistent state. In this study, we identified weak points of toxic gas safety management through a survey of domestic university laboratory facilities. This paper presented toxic gas safety measures in order to overcome those weak points. Also this paper developed a standard checklist to improve and ensure safe management of toxic gas facility in accordance with the proposed measures. This research is to enforce safety management of toxic gas facilities in domestic university laboratory and it will provide safety guidelines for every laboratory.

Study on the Improvement of the Ship Capacity Standard of Korean Harbour Facilities based on the Gross Tonnage - Focused on Anchorage among Water Facilities - (총톤수 중심으로 지정된 국내 항만시설의 선박수용능력 산정기준 개선방안에 관한 고찰 - 수역시설 중 정박지를 중심으로 -)

  • Lee, Hong-Hoon;Lee, Chang-Hyun;Kwon, Yu-Min
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.1
    • /
    • pp.72-82
    • /
    • 2022
  • The anchorage among harbour facilities should ensure sufficient water surface area for safe anchoring. A general method is to consider the L.O.A of the target ship and the depth and bottom quality of anchorage to calculate the water surface area of anchorage. However, the gross tonnage is used as a unit of the ship capacity standard of anchorage based on the detailed rules for harbour facilities operation in Korea. In this study, the gross tonnage is converted to L.O.A to calculate the actual anchoring radius of the target ship. This actual anchoring radius exceeds at 25 anchorages (among 90 anchorages) compared with the designated water surface area. Therefore, as an improvement plan of the ship capacity standard for anchorage, L.O.A should be used as a unit for anchorage based on the detailed rules for harbour facilities operation and related Korean maritime laws.

Study on the Development of K-City Roadmap through the Standard Analysis of the Test-Bed for Automated Vehicles in China (중국 자율주행차 테스트베드 관련 표준 분석을 통한 K-City 고도화 방안 수립에 관한 연구)

  • Lee, Sanghyun;Ko, Hangeom;Lee, Hyunewoo;Cho, Seongwoo;Yun, Ilsoo
    • Journal of Auto-vehicle Safety Association
    • /
    • v.14 no.1
    • /
    • pp.6-13
    • /
    • 2022
  • The Ministry of Land, Infrastructure and Transport (MoLIT) and the Korean Automobile Testing and Research Institute (KATRI) are supporting the development of Lv.3 automated vehicle (hereinafter, AV) technology by constructing an automated driving pilot city (as known as K-City) equipped with total 5 evaluation environments (urban, motorway, suburban, community road, and autonomous parking facility) which is a test bed exclusively for AV (2017~2018). An upgrade project is in a progress to materialize harsh environments such as bad weather (rain, fog, etc.) and reproduction of communication jamming (GPS blocking, etc.) with the purpose of supporting the development of Lv.4 connected & automated vehicle (hereinafter, CAV) technology (2019~2022). We intend to proactively establish a national level standard for CAV test-bed and test road requirements, test method, etc. for establishment of a road map for the construction of the test bed which is being promoted step by step and analyze and, when required, benchmark the case of China that has announced and is utilizing it. Through this, we plan to define standardized requirements (evaluation facility, evaluation system, etc.) on the test bed for the development of Lv.4/4+ CAV technology and utilize the same for the design and construction of a test bed, establishment of a road map for the construction of a real car-based test environment related to the support for autonomous driving service substantiation, etc. through provision of an evaluation environment utilizing K-City, and the establishment of a K-City upgrade strategies, etc.