A Study on Practicalization of Low Vibration New KINRECKER-II (미진동 발파용 New KINECKER-II 실용화에 관한 연구)

  • Jang, Seung-Ho;Park, Hee-Won;Lim, Jung-Hyuk;Lee, Chang-Yeop;Ahn, Bong-Do;Kang, Dae-Woo;Lee, Ha-Young
    • Explosives and Blasting
    • /
    • v.35 no.1
    • /
    • pp.43-52
    • /
    • 2017
  • Mountain and hill areas occupy by more than 70% in South Korea and Rock drilling should be applied in order to reduce noisy & vibration from massive civil engineering business such as road expansion, high-way construction, subway construction and construction of site renovation such as a newly-built & re-development of apartment, newly-built of high-rising building in downtown area. As Blasting noise & vibration such as vibration, noise, fly rock etc caused by blasting operation from large small scale construction occurs, neighboring residents who demand the compensation file a civil complaint so that the business reach a deadlock. As the excavation method for these areas, There are blasting of micro-vibration, mechanical excavation method(Rock splitter, Breaker etc), similar blasting method(plasma, gel fragmentation etc) to date. In this study, we are trying to find the feature & performance which get improved economic feasibility & construct ability through improving sympathetic detonation of New KINECKER-I used in blasting of micro-vibration & formulation and would provide convenience for use by introducing standard blasting pattern & construction method. Also, checked and confirmed all the blasting with connecting cap has been cleary detonated.

A preliminary study on the excavation sequence of a room-and-pillar underground structure by the drill-and-blast method (발파 굴착에 의한 주방식 지하구조물의 굴착공기 분석 연구)

  • Lee, Chulho;Hyun, Younghwan;Song, Junho;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.605-614
    • /
    • 2015
  • A room-and-pillar underground structure is characterized by its grid-type array of room and pillar. As a result, its construction and economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill and blast method which can be treated as a main sequence for excavation was examined by considering the regulation for blasting and construction standard of estimation in Korea. To evaluate the construction period for the room-and-pillar underground structure constructed in 4 kinds of square-type area ($30{\times}30{\sim}57{\times}57m$), the concurrent excavation pattern which was suggested in the previous researches was used. From the suggested condition, the total construction period by drill-and-blast method can be estimated with the consideration of the construction area, number of jumbo drill and faces in operation.

Methodology Study of Design Related to Accidental Explosion of Simple Explosive Storage Facility (화약류 간이저장소의 우발적 폭발을 고려한 안전설계 방법 연구)

  • Jung-Gyu, Kim;Seung-Won, Jung;Jun-Ha, Kim;Byung-Hee, Choi
    • Explosives and Blasting
    • /
    • v.40 no.4
    • /
    • pp.1-14
    • /
    • 2022
  • To review the appropriateness of current regulations on the simple explosive storage facility, the effects of internal explosion on the structural stability of the standard storage facility were analyzed by means of both FEM analyses and field experiments. As a result, it was found that the explosion-proof performance of the existing storage structure was not sufficient for 15 kg of emulsion-type explosive. Thus, an alternative method of splitting explosives was tested by conducting sympathetic detonation experiments. This method worked properly as expected, and the proper amount of splitted explosive was determined according to the test results. In addition, a storage structure with open ceiling was found to be very effective because explosion pressure was released so rapidly that the damage of the facility could be reduced significantly. Hence, such a structural pattern was proposed as a new design scheme for simple explosive storage facility.