The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.
The current dual-watchdog estimation system has individually calculated the construction, the engineering and the procurement cost. The dual-watchdog estimation system is inefficient and prolonged estimation period because of the lack of the interoperability and the difference of material unit cost and construction unit cost. In order to resolve this problem, new estimation software was developed. The estimation software is developed by making up for the weak points in existing estimation method. The cost data with the same standard is the key point. And this software enhanced accuracy and speed of the data search in stylized estimation standard. A summary of the construction, the engineering and the procurement cost was generated in this estimation software. The unit rate about the labor cost, equipment and expense through a sheet was handled. The developed estimation software has five categories on engineering cost, procurement cost, construction cost and subcontractor management sheet. In this study, the estimation software to supplement the faults of the existing estimation method was developed. And estimation software on petrochemical projects increases an efficiency of the estimation work.
최근 정부는 이러닝 콘텐츠 개발의 대가 기준에 대한 조사를 기반으로 명확한 대가 기준을 수립하고 이러닝 산업의 특성을 반영한 이러닝 콘텐츠 개발 대가 산정 가이드라인(기준)을 공개하였다. 그러나 제도적인 뒷받침이 없으면 제도가 취지와 목적을 달성하지 못하고 사문서화될 소지를 안고 있어 정책적 기반 마련이 필요하다 이에 본 연구는 대가기준 활용 활성화를 위해 이론적 배경 정리와 분석을 통해 대가기준의 단계적 적용 활성화, 대가기준의 제정 고시 및 정기적 조정, 대가기준운영위원회 운영, 이러닝산업 실태조사와의 연계성, 저작권 공동 소유 문화 확산, 개발과정의 체계적인 모니터링, 대가기준 적용 활성화 정책 연구, 표준계약서와 연동을 통한 정책 실효성 제고 등의 정책을 제언하게 되었다.
The reference guide for the cost of establishing the digital documents has been used as a basis for establishing the budget for the construction of the knowledge information resource. However, due to the abolition of the nominal unit price notification in terms of IT projects, it is necessary to conduct research to convert the standard of the current labor force grade standard to the national incompetency standard (NCS). In this study, we investigate and revise the system and contents of the current knowledge information cost estimation model. In specific, i) we conducted gap analysis of cost estimation model and existing NCS model. As the contents conforming for the construction of the knowledge information resource were not adoptable, we define the description of the construction of the knowledge information resource and to identify the core elements of NCS prior to the improvement of the cost model. ⅱ) then we proposed improve the cost model considering integration with newly proposed NCS model for knowledge information construction job. In order to ensure the validity of the application of NCS development and cost estimation model, the experts reviewed relevant contents and made plans for improvement by using experts from supply and demand groups of various fields of national knowledge informatization projects.
Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.
본 논문의 목적은 소프트웨어 사업대가기준의 중장기 발전 방향을 도출하고 소프트웨어 사업대가기준의 프레임워크를 제시하는 것이다. 본 논문에서는 첫째, 소프트웨어 생명주기상의 모든 단계와 현재의 소프트웨어 사업대가기준과 모형들이 검토되고 분석되어졌다. 둘째, 소프트웨어 사업대가기준의 중장기적 발전 대안으로 단가와 지침을 분리하여 운영하고, 시장자율기능을 확대하는 방안을 도출하였다. 그리고 소프트웨어 사업대가기준의 중장기 발전대안의 선결과제로 비용 리포지토리의 구축, 소프트웨어 사업대가 지침화, 다양한 사업대가기준 모형화 및 인증제 도입, 사업대가 전문가제도 도입이 제시되었다. 마지막으로 소프트웨어 사업대가기준의 중장기 발전대안의 단계별 이행계획이 제시되었다.
건설 프로젝트는 생산과정 이전에 설계도면을 바탕으로 예상되는 비용이 산정되며, 기획단계는 소요예산을 책정하고 설계단계는 예산에 합당한 효율적 대안을 찾으며, 정확한 입찰금액을 예측하기 위해 수차례 이루어진다. 특히, 물량산출 이전까지 예측되는 공사비의 정확도와 신뢰도는 매우 중요하다. 그러나, 국내의 경우 면적당 단가 방식 공사비 예측을 벗어나지 못할 뿐 아니라, 단계별 예측방법, 프로세스, 데이터 분석 및 관리기술 등이 표준화되어 체계적이고 종합적으로 관리되지 못하고 있다. 이에 국내 공사비 예측기술 및 관리기술 발전을 위하여 첫째, 표준화된 공사비 데이터베이스 구축과 국가차원의 종합적 관리가 필요하며, 구축 방법으로 다차원 공사비 데이터베이스 개념모델 CUBE를 제시하였다. 둘째 단계별 공사비 예측의 목적에 맞는 코스트 모델 적용이 필요하며, 코스트 모델의 방법론을 기획단계와 설계단계로 구분하여 제시하였다. 셋째, 이러한 두 가지 코스트 모델을 적용한 코스트 플래닝 프로세스를 제시하였고, 넷째, 공사비 예측 및 관리 전문인력 양성의 필요성을 제시하였다.
The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.
Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.
The government has applied the Construction New Excellent Technology Endorsement System to enhance national competitiveness and advance domestic construction technology since 1989. Nevertheless, It's application hasn't been expanded to overall construction industry, due to insufficient verification of the cost effectiveness. So, the government has established the standardized cost estimation guideline to verify the cost effectiveness in 2011. This research classified the technology group based on 27 cases of the cost estimation reports to increase understanding of the cost effectiveness of the new excellent technology. It is expected to contribute establishing reasonable and feasible cost estimation standards.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.