Korea Atomic Energy Research Institute (KAERI) has operated an integral effect test facility, the Advanced Thermal-Hydraulic Test Loop for Accident Simulation (ATLAS), with reference to the APR1400 (Advanced Power Reactor 1400) for tests for transient and design basis accidents simulation. A test for a loss of coolant accident (LOCA) at the top of the reactor pressure vessel (RPV) had been conducted at ATLAS to address the impact of the loss of safety injections (LSI) and to evaluate accident management (AM) actions during the postulated accident. The experimental data has been utilized to validate system analysis codes within a framework of the domestic standard problem program organized by KAERI in collaboration with Korea Institute of Nuclear Safety. In this study, the test has been analyzed by using thermal-hydraulic system analysis codes, MARS-KS 1.5 and TRACE 5.0 Patch 6, and a comparative analysis with experimental and calculation results has been performed. The main objective of this study is the investigation of the thermal-hydraulic phenomena during a small break LOCA at the RPV upper head with the LSI as well as the predictability of the system analysis codes after the AM actions during the test. The results from both codes reveal that overall physical behaviors during the accident are predicted by the codes, appropriately, including the excursion of the peak cladding temperature because of the LSI. It is also confirmed that the core integrity is maintained with the proposed AM action. Considering the break location, a sensitivity analysis for the nodalization of the upper head has been conducted. The sensitivity analysis indicates that the nodalization gave a significant impact on the analysis result. The result emphasizes the importance of the nodalization which should be performed with a consideration of the physical phenomena occurs during the transient.
This study was performed to evaluate SND(simultaneous nitrification and denitrification)efficiency, nitrogen removal efficiency and filtration function of non-woven fabric by using submerging MBR packed with granular sulfur covered with non-woven fabric filter. Synthetic wastewater was used as influent wastewater. Concentration of $NH_4{^+}-N$ in influent was maintained about 40 mg/L and the experiment was performed in four phases according to the flow rate. Nitrogen loading rate divided four phases ranging from $0.04 kg\;NH_4{^+}-N/m^3-day$ to $0.16 kg\;NH_4{^+}-N/m^3-day$. As a result, the maximum $NH_4{^+}-N$ removal rate was accomplished at $0.142 kg\;NH_4{^+}-N/m^3-day$ in nitrogen loading of $0.147 kg\;NH_4{^+}-N/m^3-day$. Nitrification efficiency was higher than 95% in all phases. $NO_3{^-}-N$ loading rate was adjusted ranging from $0.22 kg\;NO_3{^-}-N/m^3-day$ to $0.89 kg\;NO_3{^-}-N/m^3-day$. The maximum $NO_3{^-}-N$ removal rate was accomplished up to $0.71 kg\;NO_3{^-}-N/m^3-day$ in $NO_3{^-}-N$ loading of $0.89 kg\;NO_3{^-}-N/m^3-day$. The maximum $NO_3{^-}-N$ removal efficiency was 95% in $NO_3{^-}-N$ loading of $0.22 kg\;NO_3{^-}-N/m^3-day$. T-N removal rate was 90% and concentration of T-N in effluent was 3.7 mg/L in T-N loading rate of $0.039 kg\;NO_3{^-}-N/m^3-day$. In this study, TMP in reactor with and without non-woven fabric filter were observed to define fouling of hollow-fiber membrane module. Reaching time to standard washing pressure(22 cm Hg) of two reactors were 29 days with non-woven fabric But the reactor without non-woven fabric reached standard washing pressure only after 4 days. Accordingly, non-woven fabric was demonstrated the superiority as a filtration ability. With high nitrogen removal rate and decreasing of fouling of membrane, MBR packed with granular sulfur covered with non-woven fabric filter submerging in activated sludge aeration tank can be used as an advanced treatment process.
So, Myung-Ho;Han, Ji-Sun;Han, Thi-Hiep;Seo, Jang-Won;Kim, Chang-Gyun
Journal of Korean Society of Environmental Engineers
/
v.31
no.1
/
pp.9-14
/
2009
In this research, a polyester manufacturing company (i.e. K Co.) in Gumi, South Korea was investigated regarding the release of high concentrations of 1,4-dioxane(about 600 mg/L) and whether treatment prior to release should occur to meet with the level of the regulation standard (e.g., 5 mg/L in 2011). The pilot-scale (reactor volume, 10 $m^3$) treatment system using Photo-Fenton Oxidation was able to remove approximately 90% of 1,4-dioxane under the conditions that concentrations of 2,800 ppm $H_2O_2$ and 1,400 ppm $FeSO_4$ were maintained along with 10 UV-C lamps (240 ${\mu}W/cm^2$) illuminated during aeration. However, the effluent concentration of 1,4-dioxane was still high at about 60 mg/L. Thus, further investigation is needed to see whether the bench scale (reactor volume, 8.9 L) of activated sludge could facilitate the decomposition of 1,4-dioxane. As a result, 1,4-dioxane in the effluent has been decreased as low as about 2~3 mg/L. Consequently, Photo-Fenton Oxidation coupled with activated sludge process can make it possible to efficiently decompose 1,4-dioxane to keep up with that of the regulation standard.
Journal of Korean Society of Environmental Engineers
/
v.22
no.12
/
pp.2125-2134
/
2000
This research was to develope the economical treatment processes of the landfill leachate to meet the legal discharge standards. To achieve this purpose, experiments were conducted in laboratory to choose the optimum process and to obtain the design factors before a pi!ot-scale test. The concept of the process developing in this research was using the reverse osmosis system. The submerged membrane bio-reactor was used to achieve pre-treatment of reverse osmosis system and the concentrate was treated by evaporator with land fill gas as a fuel. The results of the research showed that SS, $BOD_5$, $COD_{cr}$, $NH_4{^+}-N$ and T-N were removed 99.0%, 43.0%, 12.9%, 48.5% and 18.7% respectively in the submerged membrane bio-reactor. The reverse osmosis system could remove $BOD_5$, $COD_{cr}$, $NH_4{^+}-N$ and T-N as an efficiency of97.5%, 97.6%, 79.7% and 85.4% respectively. The evaporator could remove $COD_{cr}$, $NH_4{^+}-N$ and T-N as an efficiency of 90.5%, 50.6% and 63.3% respectively. However the condensed water of the evaporator was not satisfied the legal standard and should be treated in reverse osmosis with the pre-treated leachate.
Journal of Korean Society of Environmental Engineers
/
v.29
no.9
/
pp.1003-1012
/
2007
In this study, we analyzed the release differences for some critical pollution compounds according to the surrounding conditions in order to predict water quality due to the sedimental releases and the release characteristics at different sedimental locations in Lake Leewon, in Tae-An area. COD, nitrogens and phosphates were analyzed using the standard methods for water quality, based on high chloride ion concentration(greater than 2,000 ppm). For COD, the release rate increased in the anoxic basin but almost the same in the oxic basin. For $NH_3$-N, the release rate decreased in the oxic basin as you go A through C point meanwhile, for $NO_3$-N and T-N, the tendency was reversed because of nitrification of them. In the anoxic basin, the release rates of $NH_3$-N and $NO_3$-N went up with A through C path. However, the release rate of T-N was found to decrease. Also, for $PO_4$-P and T-P, the release rates in the oxic basin were lowest at B point mainly because the phosphates were at less released in the highly $O_2$ concentrated environment. In the anoxic reactor, $PO_4$-P was released similarly regardless of the sampling points. In summary, the release rates in the oxic reactor were greater than those in the anoxic reactor for COD and $NO_3$-N. For the other components, the anoxic basin generated the higher release rates.
There are two treatment processes that are currently applied to ships are the biological treatment process using the activated sludge and the electrochemical treatment. However, neither of them are able to remove both nitrogen and phosphorus due to their limited ability to remove organic matters, which are main causes of the red tide. This study was conducted to identify the characteristics of nitrogen removal factors from manure wastewater by replacing the final settling tank in SBR (Sequencing Batch Reactor) process and applying immersion type hollow fiber membrane. SBR process is known to have an advantage of the least land requirement in special environment such as in ship and the immersion type hollow fiber membrane is more stable in water quality change. As the result, the average in the cases of DO (Dissolved Oxygen) is 2.9(0. 6~3.9) mg/L which was determined to be the denitrifying microorganism activity in anaerobic conditions. The average in the cases of ORP (Oxidation Reduction Potential) is 98.4~237.3 mV which was determined to be the termination of nitrification since the inflection point was formed on the ORP curve due to decrease in the stirring treatment after the aeration, same as in the cases of DO. Little or no variation in the pH was determined to have positive effect on the nitrification. T-N (Total Nitrigen) removal efficiencies of the finally treated water were 71.4%, 72.3% and 66.5% in relatively average figures, thus was not a distinct prominence. In being applied in ships in the future, the operating conditions and structure improvements are deemed necessary since the MEPC (Marine Environment Protection Committee). 227(64) ship sewage nitrogen is less than the standard of 20 Qi/Qe mg/L or the removal rate of 70%.
Basic research for the determination of boron content in biological sample has been carried out using the PGAA facility of the 24MW research reactor(HANARO). For investigation of characteristics for the measurement condition, neutron flux and its homogeneity were measured at irradiating geometry. The size of thermal neutron beam collimated from beam guide is $2{\times}2cm^2$ at the sample position. The neutron flux measured was the range of $1.0{\sim}6.5{\times}10^7n{\cdot}cm^{-2}{\cdot}s^{-1}$, and flux distribution from center within the radius of 4.5 mm and 9.0 mm was $5.77{\pm}0.71{\times}10^7n{\cdot}cm^{-2}{\cdot}s^{-1}$ and $4.68{\pm}1.64{\times}10^7n{\cdot}cm^{-2}{\cdot}s^{-1}$, respectively. Accordingly, sample size is adjusted within 10 mm for a homogeneous irradiation of high quality. Measurement system is designed to reduce the background source by Compton scattering and to improve the analytical sensitivity. To investigate the energy calibration and Compton suppression effect of gamma-ray counting system, the background conditions on both of Compton and single-mode were measured using NaCl standard. On the other hand, degree of spectral interference for sodium 472 keV peak as a matrix effect in the sample is established for an accurate boron analysis, and then boron content in three certified reference materials (NIST SRM 1570a, 1547, 1573a) was measured by using two modes and the results were compared with each other.
Chung, Chong Min;Kim, Yun Jung;Cho, Kang Woo;Lee, Sang Hyup;Hong, Seok Won;Chung, Tai Hak
Journal of Korean Society of Water and Wastewater
/
v.22
no.5
/
pp.551-559
/
2008
An experimental study was carried out to evaluate the potential of flotation process for the secondary clarifier of an activated sludge process. Flotation techniques, applied in this study, include electrofloation (EF) which generated fine bubbles smaller than $35{\mu}m$ in average and diffuser flotation (DF) which generated fine bubbles smaller than $55{\mu}m$ in average. The batch experiments were done with activated sludge displaying various characteristics. It was shown that the efficiency of solids/liquid separation was reduced as the diluted sludge volume index ($DSVI_{30}$) of activated sludge increased. The dependency, however, gradually decreased as the gas to solids (G/S) ratio increased. Thickening efficiency of EF was more than 2~10 times and DF process was more than 1.5~5 times as compared with gravity sedimentation (GS). Stable sludge blanket was maintained regardless of sludge settleability when the G/S ratio was 0.019 in the EF. On the other hand, Serious deterioration in the sludge blanket was observed in the DF depends on G/S ratio and sludge settleability. And For EF and DF, the suspended solids concentration of effluent was not nearly influenced on settleability of activated sludge and more clear than GS. A biological nutrient removal (BNR) process, combined with EF as a secondary clarifier was operated for three months. The mean MLSS (mixed liquid suspended solids) concentration in the reactor and mean solids concentration of return sludge were estimated to be 5,340 mg/L and 16,770 mg/L, respectively. The water quality of effluent was considerably stable and low value was accomplished, that was, standard suspended solids concentration $0.07{\pm}0.51mg/L$ and standard turbidity $1.44{\pm}0.56NTU$. The EF could be applicable for enhancement of efficiency of activated sludge system as well as improvement of the water quality of effluent.
The design of reactor internals requires the accurate vibration characteristics of each component for subsequent dynamic structural response analyses. For Korean standard nuclear power plant some modifications on the Control Element Assembly shroud from the reference design have been made, Since the shroud is complex in geometry having an array of vertical round tubes and webs in a square grid pattern, and being tied down by preloaded tie rods into position, it is planned to perform a vibration measurement program consisting of both experimental and analytical modal studies upon that component. The shroud modal testing was performed on the low frequency global survey to measure the first several modes. The analysis using the finite element model was also performed for the as-tested conditions. The natural frequencies and mode shapes from both test and analysis have been acquired and compared to be in good agreement. It is concluded that finite element model generated is good enough to be used in the design for the dynamic response analysis under various loading conditions.
The design of reactor internals requires the accurate vibration characteristics of each component for subsequent dynamic structural response analysis. For Korean standard nuclear power plant some modifications on the Control Element Assembly shroud from the reference design have been made. Since the shroud is complex in geometry having an array of vertical round tubes and webs in a square grid pattern, and being tied down by preloaded tie rods into position, it is planned to perform a vibration measurement program consisting of both experimental and analytical modal studies upon that component. To determine the proper test conditions, the pre-test analysis has been performed using the general purpose structural analysis program ANSYS. Also the effects of the number of master degrees of freedom, holes in the web and tie-rod preload on the natural frequencies are examined prior to the pre-test analysis. After decision of appropriate finite element model, frequency analysis and harmonic analysis are performed and ideas for the test conditions such as the number of measurement points, their locations, measurement frequency range and the excitation force level are determined.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.