• Title/Summary/Keyword: Stage design

Search Result 6,735, Processing Time 0.037 seconds

Falcon 9 Type Korean RLV and GTO-LV Mission Design (Falcon 9 방식의 한국형 재사용 발사체 및 정지궤도 발사체 임무설계)

  • Lee, Keum-Oh;Seo, Daeban;Lim, Byoungjik;Lee, Junseong;Park, Jaesung;Choi, Sujin;Lee, Keejoo
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.26 no.3
    • /
    • pp.32-42
    • /
    • 2022
  • The strategy to develop a launch vehicle family by bundling multiple rocket engines of a single type has been proven by SpaceX and their reusable fleet comprised of Falcon 9 and Falcon Heavy. In this study, we revisit a potential launch vehicle family out of a 35 tonf-class methalox staged combustion cycle engine and evaluate their utility and performance in various space missions. For example, a Korean version of Falcon 9 can deliver 4.7 tons of payload into 500 km SSO in an expendable mode while the payload is reduced to 2.16 tons in a sea-landing reusable mode. A Korean version of Falcon Heavy can deliver 4.4 tons into GTO when launched from the Naro Space Center, indicating that this common booster core configuration can handle Cheollian 2 albeit the high inclination. Once developed, the same methaloax engine can power the first-stage of smallsat launch vehicles and air launch vehicles.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

Case study on soil conditioning for EPB tunneling and troubleshooting in various grounds (다양한 지반에서의 EPB TBM 첨가제 사용 및 문제 해결 사례 연구)

  • Han-byul Kang;Sung-wook Kang;Jae-hoon Jung;Jae-won Lee;Young Jin Shin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.65-85
    • /
    • 2023
  • The use of TBM (Tunnel boring machine) has increased worldwide due to its performance together with the benefit of being safely and environmentally friendly compared to conventional tunneling. In particular, EPB (Earth Pressure Balanced) TBM is widely used because it can be applied to various grounds compared to Open TBM. Also EPB TBM has a simple mechanical structure and advantages in cost, requires less ground area than Slurry TBM. EPB TBM has advantages in soft ground, and more importantly, can extend its applicability by use of appropriate soil conditioning, which improves mechanical and hydrological properties of excavated soil and increases the excavation performance of EPB TBM. Various studies suggested the proper mixing ratio and injection ratio, but almost they are limited to laboratory test under atmospheric pressure such as slump test. Actual field conditions may differ depending on the ground and mechanical condition. In this study, first the amount of used soil conditioning used in the field with various grounds from hard rock to soft ground was estimated through laboratory tests and compared with the estimate in design stage. And also it was compared with the amount used during actual excavation. In addition, experience of soil conditioning for the problems of cutter head clogging and groundwater inrush that occurred during excavation is discussed. Finally, lesson learned for the use of soil conditioning in difficult ground condition such as mixed ground are reviewed.

Evaluation of Bearing Capacity Enhancement Effect of Base Expansion Micropile Based on a Field Load Test (현장재하시험을 통한 선단확장형 마이크로파일의 지지력 증대효과 분석)

  • Kim, Seok-Jung;Lee, Seokhyung;Han, Jin-Tae ;Hwang, Gyu-Cheol;Lee, Jeong-Seob ;Yoo, Mintaek
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.4
    • /
    • pp.31-44
    • /
    • 2023
  • A base expansion micropile was developed to improve the bearing capacity of the micropile, which bears a simple device installed at the pile base. Under an axial load, this base expansion structure radially expands at the pile tip and attaches itself around ground, compressing the boring wall in the construction stage. In this study, conventional and base expansion micropiles were constructed in the weathered rock where micropiles are commonly installed. Further, field load tests were conducted to verify the bearing capacity enhancement effect. From the load test results, it was revealed that the shaft resistance of base expansion micropiles was about 12% higher than that of conventional micropiles. The load transfer analysis results also showed that compared to conventional micropiles, the unit skin friction and unit end bearing of base expansion micropiles were 15.4% and 315.1% higher, respectively, in the bearing zone of the micropile.

A Study on Critical Success Factors of Off-Site Construction - By Importance Performance Analysis - (IPA를 통한 OSC 핵심성공요인에 관한 연구 - 국내 PC기반 OSC를 중심으로 -)

  • Jung, Seoyoung;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.24-36
    • /
    • 2023
  • OSC is drawing attention to supplement limitations such as productivity problems and on-site safety and quality problems of existing on-site labor-oriented construction production methods. In order to activate the introduction and use of OSC in the domestic construction market, it is important to innovate the technology applied to each stage of OSC process (design and engineering, factory manufacturing, site assembly, and maintenance), but it is also necessary to develop a project management method suitable for OSC method. However, research related to OSC currently being conducted in Korea is mainly in terms of related technology development, and research on deriving project management measures for the success of OSC projects is insufficient. Therefore, it is time for research on deriving a project management plan based on the core success factors of the OSC project. Therefore, by conducting importance-performance analysis on 69 OSC critical success factors derived from the previous study, the study was conducted to derive key improvement factors for OSC introduction and utilization improvement and to provide implications for this. The results of this study are expected to have useful implications for the R&D planning and policy-making process for OSC activation in the future.

Prediction of the Natural Frequency of Pile Foundation System in Sand during Earthquake (사질토 지반에 놓인 지진하중을 받는 말뚝 기초 시스템의 고유 진동수 예측)

  • Yang, Eui-Kyu;Kwon, Sun-Yong;Choi, Jung-In;Kim, Myoung-Mo
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.1
    • /
    • pp.45-54
    • /
    • 2010
  • It is important to calculate the natural frequency of a piled structure in the design stage in order to prevent resonance-induced damage to the pile foundation and analyze the dynamic behavior of the piled structure during an earthquake. In this paper, a simple but relatively accurate method employing a mass-spring model is presented for the evaluation of the natural frequency of a pile-soil system. Greatly influencing the calculation of the natural frequency of a piled structure, the spring stiffness between a pile and soil was evaluated by using the coefficient of subgrade reaction, the p-y curve, and the subsoil elastic modulus. The resulting natural frequencies were compared with those of 1-g shaking table tests. The comparison showed that the natural frequency of the pile-soil system could be most accurately calculated by constructing a stiffness matrix with the spring stiffness of the Reese (1974) method, which utilizes the coefficient of the subgrade reaction modulus, and Yang's (2009) dynamic p-y backbone curve method. The calculated natural frequencies were within 5% error compared with those of the shaking table tests for the pile system in dry dense sand deposits and 5% to 40% error for the pile system in saturated sand deposits depending on the occurrence of excess pore water pressure in the soil.

A Methodology for Quality Control of Railroad Trackbed Fills Using Compressional Wave Velocities : II. Verification of Applicability (압축파 속도를 이용한 철도 토공노반의 품질관리 방안 : II. 적용성 검증)

  • Park, Chul-Soo;Mok, Young-Jin;Hwang, Seon-Keun;Park, In-Beom
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.9
    • /
    • pp.57-66
    • /
    • 2009
  • In the preliminary investigation (Park et al., 2009), the use of compressional wave velocity and its measurement techniques were proposed as a new quality control measure for trackbed fills. The methodology follows exactly the same procedure as the density control, except the density being replaced by the compressional wave velocity involving consistently with resilient modulus of design stage. The specifications for the control also include field compaction water content of optimum moisture content ${\pm}2%$ as well as the compressional wave velocity. In this sequel paper, crosshole and resonant column tests were performed as well direct-arrival method and laboratory compressional wave measurements to verify the practical applicability of a methodology far the new quality control procedure based upon compressional wave velocity. The stress-modified crosshole results reasonably well agree with the direct-arrival values, and the resonant column test results also agree well with the field crosshole results. The compressional wave velocity turned out to be an excellent control measure for trackbed fills both in the theoretical and practical point of view.

The Optimization of Hyperbolic Settlement Prediction Method with the Field Data for Preloading on the Soft Ground (쌍곡선법을 이용한 계측 기반 연약지반 침하 거동 예측의 최적화 방안)

  • Choo, Yoon-Sik;Kim, June-Hyoun;Hwang, Se-Hwan;Chung, Choong-Ki
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.7
    • /
    • pp.147-159
    • /
    • 2010
  • The settlement prediction is very important in preloading method for a construction site on the soft ground. At the design stage, however, it is hard to predict the settlement exactly due to limitations of the site survey. Most of the settlement prediction is performed by a regression settlement curve based on the field data during construction. In Korea, hyperbolic method has been most commonly used to align the settlement curve with the field data, because of its simplicity and many application cases. The results from hyperbolic method, however, may differ by data selections or data fitting methods. In this study, the analyses using hyperbolic method were performed about the field data of $\bigcirc\bigcirc$ site in Pusan. Two data fitting methods, using an axis transformation or an alternative method which is a direct regression method, were applied with various data groups. If data was used only after the ground water level being stabilized, fitting results using both methods were in good agreement with the measured data. Regardless of the information about the ground water level, the alternative method gives better results with the field data than the method using an axis transformation.

A Study for Encouragement of Rublic System in Designing with Programming Classes (설계과목 프로그래밍 수업을 중심으로 루브릭 시스템 정착을 위한 연구)

  • Jo, Mi-Kyung;Park, Hyun-Seok
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.11
    • /
    • pp.81-90
    • /
    • 2009
  • It is inevitable for college students to be confused when they first face university education, which requires them to be self-reliant and responsible, after finishing their course of education, which is passive under control of period and environment, in primary, middle, and high schools. Introduction to college courses, which require students to be subjective and responsible, to be taken after chronically and environmentally controlled primary and secondary education, are but confusing. In this stage, college education should provide ground for educational system so that students can escape from repetitively enforced way of studying of fixed curriculums and study creatively and subjectively while befitting each individual's aptitude. For instance, in programming classes in engineering school, students scholastic achievements are closely interrelated with the professor's educational principles. A change in method of education, from one previously focused on theoretical contents to one centered on practices and experiments, can reap good results. Also, as the need arose for introduction of practice-focused evaluation system, from recognition-centered professor evaluating system to enablement of actively developing creative and self-reliant way of learning, we applied the Rublic System. It is a feedback system that all or most students become the evaluators, of which the indicators of evaluation such as category, standard, and score are public. We have looked into whether or not there has been an improvement in GPAs of students, and if there exists an improvement then what efforts should be made to solidify the system.

Perception of Science Core Competencies of High School Students who Participated in the 'Skills' based Inquiry Class of the 2015 Revised Science Curriculum (2015 개정 과학과 교육과정의 '기능' 기반 탐구 수업에 참여한 고등학생의 과학과 핵심역량에 대한 인식)

  • Sangyou Park;Wonho Choi
    • Journal of The Korean Association For Science Education
    • /
    • v.43 no.2
    • /
    • pp.87-98
    • /
    • 2023
  • In this study, we investigated the change in science core competency perception of high school students and the reason for change when science inquiry classes were conducted using eight 'skills' of the 2015 revised science curriculum. Fifteen first-year high school students in Jeollanam-do participated in the science inquiry class of this study, and the class was conducted for 20 hours (5 hours a day for four days). The inquiry activities used in the class consisted of four activity stages (research problems, research methods, research results, and conclusions) and each stage was constructed to include at least one 'skill (Problem Recognition, Model Development and Use, Inquiry Design and Performance, Data Collection, Analysis and Interpretation, Mathematical Thinking and Computer Application, Conclusion and Evaluation, Evidence-based Discussion and Demonstration, and Communication)'. As a result of the study, students' perception of the five science core competencies increased statistically significantly at the significance level of 0.01 through inquiry classes and more than 93% of students recognized that their science core competencies improved through the classes. However, since the class of this study was conducted for a small number of students, it is difficult to generalize the effect of the class, and so it is necessary to conduct a quantitative study for many students.