• Title/Summary/Keyword: Stage construction

Search Result 2,330, Processing Time 0.031 seconds

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • Lee, Doo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • 이두진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

Determination of Stage-discharge Relations by Hydraulic Channel Routing and Stage Measurement (수위관측과 수리학적 하도추적에 의한 수위-유량 관계식작성)

  • Lee, Sang-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.5
    • /
    • pp.551-560
    • /
    • 2001
  • The research estimated the roughness coefficients for the reach of Hwawon-Goryeonggyo-Hyeongpung stage stations in the Nakdong River through hydraulic channel routing. The data needed were only stage data from the three stations and river cross section data. Stage-discharge relations were determined from the computed discharges by the channel routing. They are better than the previous stage-discharge relations from direct measurements. Discharge computation errors from stage errors were analyzed and a simple method was suggested to limt reach lengths from prohibiting large errors from lateral inflows.

  • PDF

Application of Value Engineering to Early Design Phases in Construction Projects (건설사업 설계초기단계 VE 적용방안)

  • Lee Seung-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.156-166
    • /
    • 2005
  • The purpose of this study is to present proper VE application methods to euly design phases. Since VE methodology is more effective on early stage of design phase, the study focused on application of VE methodology in early stage of design process. With the examination of past studies, obstacles of VE application in domestic construction industry are defined. To solve these problems, this paper presents (1) subdivision of VE execution time, (2) an appropriate VE targeting method for construction industry, (3) a resonable and practical function analysis process, and (4) modified design-VE job plan.

Knowledge and Perception Level on Building Equipment Required of CMrs at the Project Design Stage

  • Jang, Young-Jun;Kim, Jin-Dong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.674-681
    • /
    • 2012
  • With the rise in the functions required in modern building structures, the role of the building equipment that maintains the functions of a building has been emphasized and increased. Effective management in this area is only possible when the construction manager (CMr) is qualified and has the knowledge of building equipment that is needed. Therefore, in this study, a questionnaire survey was carried out on equipment engineers and CMrs, in order to determine the level of building equipment knowledge required, and to identify the perception level of CMrs about the building equipment in the construction project at the project design stage. The results of this study revealed that the CMrs surveyed had a lower level of knowledge on the building equipment than the level that was desired by the equipment engineers. This indicates that CMrs currently have a weak capacity for the management of building equipment. It is thus necessary for CMrs to undergo systematic training in order learn more about building equipment and thus be able to manage construction projects more efficiently.

Hanger Tension Variation of Self-Anchored Suspension Bridge in Construction (시공중 자정식 현수교의 행거 장력변화)

  • Kim, Ho Kyung;Suh, Jeong In
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.6
    • /
    • pp.1309-1317
    • /
    • 1994
  • Because the stiffening girders are constructed after the installation of hangers for typical suspension bridge, no additional tensioning to hangers in construction is necessary for this bridge type in which main cable is earth-anchored. However, for self-anchored suspension bridge, hangers are installed after temporarily supporting stiffening girders constructed in previous stage. Therefore, initial tension is required on installing hangers. Tension of hangers varies as the construction proceeds. Hence, it is necessary to determine the most efficient method of installing hangers among several methods. This study presents finite element procedures and the algorithms of construction stage analysis to simulate construction processes. Geometric nonlinear analysis scheme is also included. The most effective method regarding the installation of hangers is presented through the examples of actual bridge model.

  • PDF

A study of the Bent of Hydration Analysis Underground Pier Footing by Constrution Stages (시공단계를 고려한 교각기초의 수화열해석)

  • Park Weon-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.6 no.3
    • /
    • pp.223-230
    • /
    • 2005
  • Lately, massive concrete structures are increasingly built. Mass concrete structures are cast in many stages with construction joints. Individually constructed segment exhibit different heat source properpies and time dependent properties. As such construction stages must be incorporated in a heat of hydration analysis model to truly reflect a real construction process. Thermal stress analysis is conducted to find the way of controlling the thermal crack of pier footing mat in this paper. The footing mat model fur the analysis is $12m\times14m$ area and 3m height. This study show the process of construction stage and analyzes the results for a foundation structure constructed in 2 stage pours.

  • PDF

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

Comparison of Reinforced Concrete Construction Technology between North and South Korea (남북한 철근콘크리트 시공기술 비교)

  • Baek, Cheong-Hoon;Kim, Eun-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.208-209
    • /
    • 2020
  • There is no disagreement that the construction sector will play an important role in inter-Korean economic development cooperation. However, very few studies have been made at North Korea's construction technology. North Korea shows a lot of differences from South Korea, from the quality standards of building materials to construction technology. It is clear that these differences will be a stumbling block to the promotion of construction projects in the inter-Korean cooperation stage. Therefore, the start of inter-Korean economic development cooperation should be preceded by work to clearly recognize each other's differences and lay the foundation for integration or compatibility. The purpose of this study is to compare the construction technology of rebar concrete construction. We compared the differences with Korea's construction method based on the construction books recently published in North Korea, and derived the characteristics of North and South Korea for each detailed process of reinforced concrete construction.

  • PDF

VIRTUAL CONSTRUCTION OF TRANSFER FLOORS IN REINFORCED CONCRETE BUILDING USING BIM

  • Kwangho So;Bohwan Oh;Yongjik Lee;Hyungeun Lee;Taehun Ha
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.12-16
    • /
    • 2011
  • Building Information Modeling (BIM) is being widely spread in AEC industry worldwide and also in South Korea. Although the creation of digital model is better to be started at design stage, it can also improve the productivity of construction by simulating the actual construction process and environment. This paper presents application of BIM-based simulations related with design changes to transfer floors in 58-storey reinforced concrete office building. Transfer floor is not only a structurally important part of the building but also a challenging part of the actual construction in terms of sequence and period due to the complexity of the work. Preconstruction of rebar, mechanical, and plumbing is performed to review the construction drawings and to perform clash detection. Each item of application is evaluated for its effectiveness on actual construction and for the development potential.

  • PDF