공정관리와 연계한 건설 검측 업무 체계화 방안 (Integration of Construction Inspection to Schedule Management )

  • 송보현;정승환;이진강;최재현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF

시스템엔지니어링 기법 적용에 따른 경량전철 전기시스템의 생명주기비용 절감에 관한 연구 (A study on the Life Cycle Cost reduction of the LRT's power systems based on the advanced Systems Engineering)

  • 최원찬;배준호;허재훈;주지영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1434-1439
    • /
    • 2011
  • The purpose of this study is based on the optimize the system life cycle cost apply to the advanced systems engineering techniques consideration thought to the system life cycle for the power system which is the one of the major component of the light rail transit system. Generally, the systems engineering techniques apply to the LRT's power systems are not optimize the whole life cycle cost of the power systems because systems engineering management activities are concentrate in performing the key-technology oriented at the construction stage of the dedicated power systems for light rail transit. Through this study, All the stakeholders can be utilize a this advanced systems engineering techniques which is fully considered the life cycle cost through the considering in whole system life cycle (such as concept, design, operation, maintenance and dispose stage as well as construction stage) and adopted by KSX ISO/IEC 15288 system life cycle processes.

  • PDF

사술성형 모사에 있어서 벽면 경계조건 처리를 위한 선단 유동장 생성기법과 spline 곡선을 이용한 선단 격자 재구성 (Frontal Flow Field Construction for Wall Boundary Condition Treatment and Frontal Remeshing Using Spline Curve in Injection Molding Simulation)

  • 윤재륜
    • 유변학
    • /
    • 제5권1호
    • /
    • pp.34-48
    • /
    • 1993
  • 최근 CAD/CAM의 발전과 더불어 사출성형공정은 여러분야에 폭넓게 응용되고 있 다. 사출성형공정은 크게 충전과정(filling stage), 냉각과정(cooling stage), 보압과정(packing stage)로 나누어 지는데 이중 충전과정은냉각과정과 보압과정에서 나타날 물리적인 현상과 최종 성형품의 기계적 성질에 중요한 영향을 끼치게 된다. 충전과정의 수치 해석 방법은 대 표적으로 control volume method, branching flow method, transient moving boun-dary method로 구분된다. 본 연구에서는 격자의 형태를 양호하게 형성시키고 유동선단의 형태를 개선하기위한 기법인 Spline 곡선을 이용한 선단격자 재구성(frontal remeshing using spline curve)과 수치해석에 소요되는 시간을 줄이기 위하여 벽면경계조건 처리를 위한 선단 유동 장생성(frontal flow field construction for wall boun-dary condition treatment)기법을 개발 하고 transient moving voundary method에 적용시켜 원형 평판과 인장 및 굽힘시편 그리고 두께가 변하는 사각 형상을 가진 캐비터에서의 충전과정을 수치해석하였다. 그결과 압력 분 포, 온도분포, 속도장, 유동선단의 진전형태 등이 기존에 제출된 해석결과와 비교하여 볼 때 만족스러운 수치해석결과를 보였다.

  • PDF

초고층 주상복합 아파트의 연돌효과 특성에 관한 연구 -D 프로젝트를 중심으로- (A Study on the Stack Effect Characteristics in High-Rise Apartments)

  • 최동탁;손원득;최영식
    • 한국산업융합학회 논문집
    • /
    • 제14권1호
    • /
    • pp.37-43
    • /
    • 2011
  • Study of stack effects in the early design stage is the most appropriate moment to draw any problems and provide the right solutions. However, In a real process, The pre-design planning stage review is not thoroughgoing enough to high-rise construction site. Therefore, this study has reviewed by selecting one of inappropriate project [D] to find the possible stack effect alternatives in an early design documentation stage and provide countermeasures to be a foundations of stack effect in the construction stages.

A Study on the Requirement Information Management Model and Process Linked to Space Planning in the Early Design Stage

  • Jae Ho, Cho;Sang Woo, Kim;Bo Sik, Son;Jae Youl, Chun
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.566-569
    • /
    • 2013
  • The purpose of this research is to develop the technology to meet the requirements of the design content, and to build a 'Requirement Information Management Model' for the design project. The model that should be used in the early design stage will undergo the following process: First, basic requirements would be defined by extracting the design content in the form of a reusable library of space units. At the next stage, requirement information should be modified after considering unique characteristics for the project and conflict problems between function and performance.

  • PDF

Investigation on the flexural behavior of an innovative U-shaped steel-concrete composite beam

  • Turetta, Maxime;Odenbreit, Christoph;Khelil, Abdelouahab;Martin, Pierre-Olivier
    • Steel and Composite Structures
    • /
    • 제34권3호
    • /
    • pp.441-452
    • /
    • 2020
  • Within the French CIFRE research project COMINO, an innovative type of composite beam was developed for buildings that need fire resistance with no additional supports in construction stage. The developed solution is composed of a steel U-shaped beam acting as a formwork in construction stage for a reinforced concrete part that provides the fire resistance. In the exploitation stage, the steel and the reinforced concrete are acting together as a composite beam. This paper presents the investigation made on the load bearing capacity of this new developed steel-concrete composite section. A full-scale test has been carried out at the Laboratory of Structural Engineering of the University of Luxembourg. The paper presents the configuration of the specimen, the fabrication process and the obtained test results. The beam behaved compositely and exhibited high ductility and bending resistance. The shear connection in the tension zone was effective. The beam failed by a separation between the slab and the beam at high deformations, excessive shear forces conducted to a failure of the stirrups in this zone. The test results are then compared with good agreement to analytical methods of design based on EN 1994 and design guidelines are given.

건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 - (A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project -)

  • 윤준선;유병억
    • 한국건축시공학회지
    • /
    • 제6권1호
    • /
    • pp.93-99
    • /
    • 2006
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

프로젝트 단계별 LOD가 반영된 스마트 BIM 커튼월 라이브러리 체계 구축 (Proposal of Smart BIM Library Framework for Curtain Wall with different LOD on each project stage)

  • 김범준;김성아;김병주;진상윤
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.44-55
    • /
    • 2017
  • Recently, there has been a growing interest in the life cycle management field of buildings through the introduction of BIM. And as BIM application is expanded, BIM ordering guidelines and guidelines are becoming popular. Also, as diverse forms of buildings including super high-rise building have been generalized, attention to the importance of curtain walls that are advantageous for construction period shortening, building lighting and quality homogenization has been increasing. However, all BIM information from the design stage to the maintenance stage is not accumulated in stages. And the input information is not improved in proportion to the level of appearance of the BIM model. Also, current curtain wall designs rely heavily on curtain wall consulting firms or utilize accumulated data from existing processes. In this study, curtain wall components, shape and property information were derived by analyzing BIM guidelines and curtain wall construction standards to contribute to solving these problems. And the curtain wall smart BIM library which can be converted according to LOD(Level of Development) has been produced and its applicability has been verified. Through the library, curtain wall information can be systematically managed in the library from design to construction and maintenance. And the library will contribute to the expansion and activation of the BIM library market in the future.

극한지 파이프라인 프로젝트 설계단계에서의 데이터 분류에 관한 연구 (A Study on the Data Classification in Engineering Stage of Pipeline Project in Extreme Cold Weather)

  • 김창한;원서경;이준복;한충희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.214-215
    • /
    • 2014
  • Recently, Russia decided to export an annual 7.5 million tons of natural gas to Korea over 30 years from 2015, as also deal with China, planed to build a pipeline connecting Siberia to Shandong Peninsula about 4000km. Risk management is required depending on the project in extreme cold weather, because it is concerned about the behavior of the seasonal changes in soil temperature and the strain of pipe according to the long-distance pipeline construction. The plan of data management shall be prepared in parallel for a sophisticated risk management, because a data is massive scale and it is generated/accumulated in real time. Therefore, this research is aimed to classify a data items in engineering stage of pipeline by previous studies for managing a generated data depending on the detail works in extreme cold weather. We expect to be provided the foundation of an efficient classification system of a generated data from the pipeline project life cycle.

  • PDF

Force monitoring of Galfan cables in a long-span cable-truss string-support system based on the magnetic flux method

  • Yuxin Zhang;Xiang Tian;Juwei Xia;Hexin Zhang
    • Structural Monitoring and Maintenance
    • /
    • 제10권3호
    • /
    • pp.261-281
    • /
    • 2023
  • Magnetic flux sensors are commonly used in monitoring the cable force, but the application of the sensors in large diameter non-closed Galfan cables, as those adopted in Yueqing Gymnasium which is located in Yueqing City, Zhejiang Province, China and is the largest span hybrid space structure in the world, is seldom done in engineering. Based on the construction of Yueqing Gymnasium, this paper studies the cable tension monitoring using the magnetic flux method across two stages, namely, the pre-calibration stage before the cable leaves the rigging factory and the field tension formation stage of the cable system. In the pre-calibration stage in the cable factory, a series of 1:1 full-scale comparative tests were carried out to study the feasibility and relability of this kind of monitoring method, and the influence on the monitoring results of charging and discharging voltage, sensor location, cable diameter and fitting method were also studied. Some meaningful conclusions were obtained. On this basis, the real-time cable tension monitoring system of the structure based on the magnetic flux method is established. During the construction process, the monitoring results of the cables are in good agreement with the data of the on-site pressure gauge.The work of this paper will provide a useful reference for cable force monitoring in the construction process of long-span spatial structures.