• Title/Summary/Keyword: Space Segment

Search Result 370, Processing Time 0.023 seconds

Evaluation of Segment Lining Fire Resistance Based on PP Fiber Dosage and Air Contents (세그먼트 라이닝의 PP섬유 혼입량과 공기량 변화에 따른 화재저항 특성 평가)

  • Choi, Soon-Wook;Kang, Tae Sung
    • Tunnel and Underground Space
    • /
    • v.31 no.6
    • /
    • pp.469-479
    • /
    • 2021
  • As a material for preventing spalling of concrete, the effectiveness of PP fiber has already been confirmed. However, it is necessary to consider the maximum temperature that occurs during a fire, and to solve the mixing problem and the strength reduction problem that occur depending on the mixing amount. In this study, the fire resistance performance of tunnel segment linings according to the PP fiber content and air volume under the RABT fire scenario was investigated. As a result, no spalling or cross-sectional loss occurred in all test specimens, and when the PP fiber content was small, the maximum temperature was relatively high and the maximum temperature arrival time was also fast. On the other hand, no trend was found for the maximum temperature and arrival time according to the difference in air volume. In the internal temperature distribution results for the PP fiber mixing amount of 0.75, 1.0, 1.5, and 2.0 kg/m3, the results of 0.75 and 1.0 kg/m3 showed similar temperature distribution, and the results of 1.5 and 2.0 kg/m3 were similar. It was confirmed that the internal temperature distribution tends to decrease at the same depth when the amount of PP fiber mixed is large, and it was confirmed that a remarkable difference occurred from the results of 1.0 kg/m3 and 1.5 kg/m3 of PP fiber mixed amounts.

Structural performance evaluation of precast concrete segment using synthetic fibres (프리캐스트 콘크리트 세그먼트의 합성섬유 보강재 적용에 따른 구조적 성능 평가)

  • Lee, Hoseong;Kim, Changyong;Lee, Sean S.;Kim, Seungjun;Lee, Kyeongjin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.469-483
    • /
    • 2018
  • Steel bars have been widely used as the primary reinforcement for Precast Segmental Concrete Lining for TBM Tunnels. Previously, studies have been carried out to gauge the potential for steel fiber reinforcement to replace the use of steel bar reinforcements in the segmental lining to reduce the amount of the steel bar reinforcement. Steel fiber reinforcements have been investigated and widely applied to SFRC TBM linings to improve the constructability of SFRC TBM linings worldwide. However, the steel fiber reinforcement often caused punctures to the water membranes inside tunnel lining and had long-term durability deterioration issues caused by steel corrosion, as well as cosmetic problems. Therefore, this paper sought to gauge the potential of synthetic fiber reinforcements, which have proven to be very attractive substitutes for steel fiber reinforcements. This study analyzed the performance of both steel and synthetic fiber reinforcements in segmental linings and evaluated the applicability of the fiber reinforcements to the TBM Precast Concrete Segmental Linings of TBM tunnels. As a conclusion, this study demonstrates that the potential use of steel and synthetic fibers in various combination, can substitute the rebar reinforcement in the concrete mix for segmental concrete linings.

Forward probing utilizing electrical resistivity and induced polarization for predicting mixed-ground ahead of TBM tunnel face (전기비저항과 유도분극을 활용한 TBM 터널 굴착면 전방 복합지반 예측 기법)

  • Ryu, Jinwoo;Park, Jinho;Lee, Seong-Won;Lee, In-Mo;Kim, Byung-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.55-72
    • /
    • 2018
  • A method that can predict the mixed-ground condition ahead of a TBM tunnel face during tunnel construction utilizing electrical resistivity and induced polarization (IP) was proposed in this study. Effect of TBM advancement approaching the mixed-ground condition (composed of soil layer overlying rock layer) when currently running through soil zone on the electrical resistivity and IP measuring was assessed with laboratory-scale experiments. The resistivity and IP values were measured using four electrodes, by installing two electrodes on the tunnel face (at the cutterhead), and the other two electrodes on the segment lining. The test results showed that both of the measured resistivity and IP values were kept increasing as the TBM is approaching the soil-rock mixed-ground. Also, to get the more reliable results for predicting the mixed-ground condition, it was recommended that the measurement is made at the tunnel face utilizing 4-electrodes installed at the cutterhead as well as it is made utilizing the 2-electrodes installed at the segment lining along with the 2-electrodes installed on the tunnel face (at the cutterhead) so that two measured results are compared each other.

A Study on the Head and Neck Posture Related to Cervical Curvature in Patients with Craniomandibular Disorders (경추만곡도를 이용한 두개하악장애에 환자의 두경부자세에 관한 연구)

  • Min-Shin;Kyung-Soo Han
    • Journal of Oral Medicine and Pain
    • /
    • v.20 no.2
    • /
    • pp.361-376
    • /
    • 1995
  • The purpose of this study was to investigate the relationship between the head and neck postre and the cervical curvature, especially in forward head postrue(FHP). Sixty patients with craniomandibular disorders and thirty dental students without any signs and symptoms of craniomandibular disordres participated in this study as patient groups and sa control group, respectively. The author evaluated the head and neck posture of all subjects by plumb line and CROM( Cervical Ragne of Motion), and had taken cephaograph in natural head position. On the cephalograph the angle of cervical inclination formed by true horizntal plane and 4th cervical vertebra(C4) and the radius of cervical curvature from C1 to C5 were measured. A specially designed ruler was used for measuring cervical curvature. Occlusal contac number and force with T-scan system, electromygraphic activity of cervical muscles with Bio-EMG, and distance of freeway space with Bio-ECN were recorded, respectively. The collected data were processed by SAS/STAT progrm. The obtained results were as follows : 1. In subjects with longer radius which was less cervical curvature, head positioned more anteriorly than subjects with smaller radius, and they showed slightly straight cervical vertebra. 2. Between the patients and the control group, there were no differences in cervical curvature, in forward head position by plumb line and in CROM. But the patient group had a greater cervical inclination than the control group had. 3. There were positive correlation between cervical curvature and forward head position by plumbline,between forward head position y plumb line and that by CROM in patient group. The cervical inclination, however, had negative correlation with cervical curvature, and with forward head postion by plumb line, respectively. 4. In case of showing more cervical curvature and more forward head position by plumb line the head position was defined as forward head posture. In patient group, subjects without forward head posture showed greater posterior teeth contact force than subjects with forward head posture, but in control group, there were no difference between the two subjects. 5. There were higher electromyographic activity in almost all muscles and smaller freeway space in induced forward head posture than those in natural head position in subjects without forward head posture. In conclusion, head position of patients with craniomandibular disorders were not more anterior than that of normal control person, but they had tendency to head extension. From the result of this study, forward head posture could be defined as posterior rotation of upper cervical segment with a straight lower cercial segment due to loss of normal lordosis.

  • PDF

THE USE OF REMOVABLE APPLIANCE FOR THE CORRECTION OF MINOR IRREGULARITIES IN ANTERIOR SEGMENT (전치부의 경미한 공간부조화 개선을 위한 가철성 장치의 적용 예)

  • Kwak, Ah-Ram;Choi, Yeong-Chul;Park, Jae-Hong;Choi, Seong-Chul;Kim, Gwang-Chul
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.34 no.4
    • /
    • pp.685-693
    • /
    • 2007
  • Class I malocclusion without skeletal problem results from tooth size/arch-size discrepancies, either evidenced by crowding, or spacing problems. Treatment method can be chosen according to dentition, the amount of arch discrepancy, patient compliance, or patient demands. We report of clear aligner and spring aligner that can be applicated in cases of permanent dentition with minimal arch discrepancy in anterior segment. There are some limits of application, but these are very useful appliances in the selective case. When crowding exists, definitive analysis and diagnosis should be made before starting treatment because certain amount of space must be obtained somewhere in the dentition to resolve the crowding. Therefore, appliance should be applied when lacking space is small. Also, in cases with spacing arch circumference is reduced after alignment so no problem in intermaxilla occlusal relationship must be confirmed. In case with crowding, judicious removal of interproximal enamel is indicated.

  • PDF

ORTHODONTIC AND PROSTHODONTIC TREATMENT IN CLEFT LIP AND PALATE PATIENT (순/구개열 환자에서의 교정-보철 치험례)

  • Chang, Weon-Suk;Choi, Yeong-Chul;Lee, Keung-Ho
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.27 no.3
    • /
    • pp.388-393
    • /
    • 2000
  • Cleft lip and palate is one of the most common congenital defects in oro-maxillo-facial region. Because most patients undergo surgical repair in early life, the sagittal jaw relationships used to be deteriorated gradually from palate surgery up to adulthood. Also, the maxillary lateral incisor may be absent or atypical-shaped in the cleft site and may not erupt or erupt ectopically, so multidisciplinary dental cares are needed for cleft lip and palate patients. The effects of the cleft lip and alveolus seem to be limited to that part of the dentofacial complex that surrounds the cleft area. In the maxillary arch, the anterior part of the non cleft segment has a tendency to be rotated forward. On the other hand, the cleft segment has a tendency to rotated slightly medially ; hence, the tendency for canines to be edge-to-edge and sometimes in crossbite. Lip and alveolus surgery adequetely correct these problems, with little untoward effect on the skeletal maxillary-mandible relationships. In this report, the patient has a repaired lip and cleft alveolus on the left side with congenital missing on '62, '22, oronasal fistula, and skeletal class III malocclusion which is not affected by lip surgery. Dental treatments for this patient including orthodontic(space supervision, functional regulator in mixed dentition, fixed therapy in permanent dentition) and prosthodontic(removable obturator with key and keyway attachment and Konus crown) therapy were performed to improve the patient's functions and esthetics.

  • PDF

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport (공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.325-337
    • /
    • 2021
  • On the road and rail tunnels, the evacuation pathway and facilities such as smoke-control and fire suppression system are essential in tunnel fire. In the long twin tunnels, the cross-connection tunnel is usually designed to evacuate from the tunnel where the fire broke out to the other tunnel. In twin shield tunnels, the segment lining has to be demolished to construct the cross-connection tunnel. Considering the modern shield TBM is mostly the closed chamber type, the exposure of underground soil induced by removal of steel segment lining is the most danger construction step in the shield tunnel construction. This case study introduces the excavation method using the thrust of large steel pipe and reviews the measured data after the construction. The large steel pipe thrust method for the cross-connection tunnel can stabilize the excavated face with the two mechanisms. Firstly, the soil in front of excavated face is cylindrically pre-supported by the large steel pipe. Secondly, the excavated face is supported by the plugging effect caused by the soil pressed into the steel pipe. It was reviewed that the large steel pipe thrust method in the cross-connection tunnel is enough to secure the construct ability and stability in soil from the measurement results about the deformation and stress of steel pipe.

Mechanical behaviour of waterway culvert structure assembled by precast segments (프리캐스트 세그먼트를 이용한 조립식 수로암거구조물의 역학적 거동 특성)

  • Lee, Gyu-Phil;Hwang, Jae-Hong;Shin, Hyu-Sung;Hong, Se-Kyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.193-200
    • /
    • 2010
  • Due to the characteristic of culvert structure, the standard section of the culvert has been established and applied in field. However, this becomes a limitation in selecting a section design corresponding to various field conditions although it can improve the design and applicability of culvert structure. In order to overcome this limitation, we have developed the design and application technology of culvert structure corresponding to the field conditions that various shapes of culvert structure can be covered by assembly of precast segments. Because the structural characteristics of assembling-type waterway culvert structure, the thickness of structure and amount of reinforcing rods can vary according to the fixation or internal hinge status in the connection part of precast segments. This has a strong influence on the applicability and economic efficiency of culvert structure. Accordingly, in order to suggest a reasonable modeling technique of segment connection parts, this study has conducted the field experiment and numerical analysis. According to the results of field experiment and numerical analysis, the slab, wall and base slab with mortar splice sleeves have shown that the assembling-type of waterway culvert structure behaves like an integrated structure.

Color Image Segmentation Using Adaptive Quantization and Sequential Region-Merging Method (적응적 양자화와 순차적 병합 기법을 사용한 컬러 영상 분할)

  • Kwak, Nae-Joung;Kim, Young-Gil;Kwon, Dong-Jin;Ahn, Jae-Hyeong
    • Journal of Korea Multimedia Society
    • /
    • v.8 no.4
    • /
    • pp.473-481
    • /
    • 2005
  • In this paper, we propose an image segmentation method preserving object's boundaries by using the number of quantized colors and merging regions using adaptive threshold values. First of all, the proposed method quantizes an original image by a vector quantization and the number of quantized colors is determined differently using PSNR each image. We obtain initial regions from the quantized image, merge initial regions in CIE Lab color space and RGB color space step by step and segment the image into semantic regions. In each merging step, we use color distance between adjacent regions as similarity-measure. Threshold values for region-merging are determined adaptively according to the global mean of the color difference between the original image and its split-regions and the mean of those variations. Also, if the segmented image of RGB color space doesn't split into semantic objects, we merge the image again in the CIE Lab color space as post-processing. Whether the post-processing is done is determined by using the color distance between initial regions of the image and the segmented image of RGB color space. Experiment results show that the proposed method splits an original image into main objects and boundaries of the segmented image are preserved. Also, the proposed method provides better results for objective measure than the conventional method.

  • PDF