A Study on Traffic Safety Assessments for Fishing Vessels Near the Southwest Sea Offshore Wind Farm

  • Yoo, Sang-Lok;Jeong, Jae-Yong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.23 no.3
    • /
    • pp.231-241
    • /
    • 2017
  • The purpose of this study was to analyze traffic safety assessments for fishing vessels near the southwest offshore wind farm. This study applied a collision model for safety assessment. It also involved a spatiotemporal analysis of vessels engaged in fishing to identify fishing hotspots around the offshore wind farm. This study used data from fishing vessel location transmission devices gathered over 1 year in 2014. As a result, in September, when the average number of vessels engaged in fishing is high, 62 ships were operating in fishing section 184-6 and 55 ships in section 184-6. In addition, in fishing sections 184-8 and 192-2, where an offshore wind farm was located, there were 55 and 38 ships operating, respectively. As the recovery period for a seaway near wind farm turbines is 55 years, it was determined that safety measures are required in order to reduce collision frequency while allowing fishing vessels to navigate through offshore wind farms. Meanwhile, the return period of Seaway B between the groups of generators considered was 184 years. A safety zone for offshore wind farms should be installed covering a distance of at least 0.3 NM from the boundary of turbines. Then, the collision return period was derived to be close to 100 years. Through this traffic safety assessment, it has been concluded that such measures would help prevent marine accidents.

Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

  • Ahn, Dang;Shin, Sung-chul;Kim, Soo-young;Kharoufi, Hicham;Kim, Hyun-cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.1
    • /
    • pp.45-54
    • /
    • 2017
  • The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.

A Study on the Analysis of Lightning Damage Impact in Domestic Offshore Wind Farm (국내 해상풍력발전단지 낙뢰피해 영향 분석에 관한 연구)

  • Seo, Jin-Gyu;Kim, Kyu-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.2
    • /
    • pp.247-252
    • /
    • 2016
  • The latest offshore wind turbines are easily exposed to lightning strikes because they are designed with longer blades and taller height to satisfy the growing capacity demands. The generation facilities and elements of the offshore wind farm are more vulnerable to lightning damage because of more severe, unpredictable weather conditions. Therefore, this paper presents the analysis of measure for lightning overvoltage mitigation in offshore wind farm planned in South Korea southwest seashore. The sensitivity analysis includes the steady state and transient state characteristics of offshore wind farm and proposes the countermeasure for mitigation of transient overvoltage by considering earth resistivity of the offshore environment.

Preliminary study of passive acoustic monitoring of finless porpoises Neophocaena asiaeorientalis around the Southwest offshore wind farm in Korea (서남해 해상풍력 실증단지 주변에서의 수동 음향 관측을 이용한 상괭이 모니터링 가능성 연구)

  • Yoon, Young Geul;Yang, Wonjun;Choi, Jee Woong
    • The Journal of the Acoustical Society of Korea
    • /
    • v.40 no.6
    • /
    • pp.537-545
    • /
    • 2021
  • Due to the accelerated development and transformation of coastal waters by humans, damage to marine mammals is a concern. To understand how coastal development may affect marine mammals, it is essential to determine their distribution characteristics. In this study, the appearance of finless porpoises was confirmed by passive acoustic monitoring around the Southwest offshore wind farm in July, 2020. Although there were no visual observation results of finless porpoises in the research area, the clicks measured in the offshore wind farm were verified by comparing with acoustic characteristics of the clicks measured in the area with a high detection rate. During the experimental period, clicks of finless porpoises were recorded for ten consecutive days, and Clicks per Porpoise Positive Minute (CPPM) was 40.7 clicks min-1, Porpoise Positive Minutes (PPM) was 9.7 %, Encounter duration and waiting time were 18.2 min and 94.9 min respectively. This study provides information on the appearance of them in the Southwest offshore wind farm and this result may help to monitor the impact of marine mammals from wind farm operation.

Study on Present Status and Future Direction of Korean Offshore Wind Power (한국의 해상풍력 현황과 발전방향에 관한 연구)

  • Sung, Jin Ki;Lee, Tae Jin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.3
    • /
    • pp.312-321
    • /
    • 2013
  • In this study, we review the status of Southwest sea 2.5GW offshore wind project and expected various problems. And we suggest government policies for offshore wind industrialization. Especially, we would like to mention the necessity of offshore wind development in order to diversify power sources and guarantee energy security in Korea. And we would like to mention necessity and direction to make offshore wind into growth engine industry thorough fusion between industries and energization for the existing industry such as civil, shipbuilding, steel, etc. that was headed into downturn.

Improvement of Wave Height Mid-term Forecast for Maintenance Activities in Southwest Offshore Wind Farm (서남권 해상풍력단지 유지보수 활동을 위한 중기 파고 예보 개선)

  • Ji-Young Kim;Ho-Yeop Lee;In-Seon Suh;Da-Jeong Park;Keum-Seok Kang
    • Journal of Wind Energy
    • /
    • v.14 no.3
    • /
    • pp.25-33
    • /
    • 2023
  • In order to secure the safety of increasing offshore activities such as offshore wind farm maintenance and fishing, IMPACT, a mid-term marine weather forecasting system, was established by predicting marine weather up to 7 days in advance. Forecast data from the Korea Hydrographic and Oceanographic Agency (KHOA), which provides the most reliable marine meteorological service in Korea, was used, but wind speed and wave height forecast errors increased as the leading forecast period increased, so improvement of the accuracy of the model results was needed. The Model Output Statistics (MOS) method, a post-correction method using statistical machine learning, was applied to improve the prediction accuracy of wave height, which is an important factor in forecasting the risk of marine activities. Compared with the observed data, the wave height prediction results by the model before correction for 6 to 7 days ahead showed an RMSE of 0.692 m and R of 0.591, and there was a tendency to underestimate high waves. After correction with the MOS technique, RMSE was 0.554 m and R was 0.732, confirming that accuracy was significantly improved.

The Transient State characteristic and Consecutive Failure Analysis of The Offshore Wind Farm (낙뢰로 인한 해상풍력발전단지 과도상태 및 연계고장 분석)

  • Seo, Jin-Gyu;Kim, Kyu-Ho;Park, Sang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.239-240
    • /
    • 2015
  • This paper presents the transient state characteristic and single phase ground fault occurred by deterioration of surge arrester when offshore wind turbine is struck by lightning strike. The wind turbine and submarine cable data are based on the 2.5GW offshore wind farm planned in South Korea Southwest Seashore. During lightning strikes, additional ground fault can lead to damage of the generation components. So, the sensitive analyses are conducted in order to investigate the effects of lightning strike on offshore wind farm.

  • PDF

Fishermen's Perceptions and Considerations regarding the Coexistence of Fishing Activities within Offshore Wind Farms

  • Yu-Jeong Mun;Cho-Young Jung
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.30 no.3
    • /
    • pp.283-290
    • /
    • 2024
  • In this study, a survey on the coexistence of offshore wind farm and fishing activities in Gochang, Gunsan, and Buan's fishermen in the southwest sea of shore wind farm was carried out witn an aim of examining the factors that should be considered when coexisting. A questionnaire was composed after referring to domestic and foreign literature data on examples of coexistence. The questionnaire was issued through direct visits. Frequency analysis and cross-analysis were used for survey response results, and IBM SPSS Statistics ver. 26 was used for statistical processing. As a result of analyzing a total of 84 questionnaires, the perception of the coexistence of offshore wind and fishing activities was the same by 50.0% positive and negative, respectively. As a result of cross-analysis by region, significant differences were found (p <0.039). Gochang fishermen showed a high negative perception of the coexistence of offshore wind and fishing activities at 62.1%, with the main reason being that fishing resources are expected to decrease due to the influence of noise, vibration, and current generated from offshore wind farm facilities. In Gunsan, negative perception of coexistence was high at 57.7%. This was mainly attributed to the impossibility to operate in the offshore wind farm due to the nature of the fishery. On the contrary, in the case of Buan, 69.0% of the positive perception of coexistence was high 'because fishermen were dissatisfied with the current coexistence plan (policy)'. According to previous studies, 91.8% of domestic fishing methods show the possibility of fishing activities in offshore wind under caution, so it is concluded that research should be conducted to coexist with offshore wind and fishing activities as in foreign countries for smooth installation of offshore wind and continuous fishing activities.

Communication Network Architectures for Southwest Offshore Wind Farm (한국 서남 해상 풍력발전단지 통신망 연구)

  • Ahmed, Mohamed A.;Kim, Young-Chon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.42 no.1
    • /
    • pp.88-97
    • /
    • 2017
  • With the increasing of the penetration rate of large-scale wind farms, a reliable, highly available and cost-effective communication network is needed. As the failure of a WF communication network will significantly impact the control and real-time monitoring of wind turbines, network reliability should be considered into the WF design process. This paper analyzes the network reliability of different WF configurations for the Southwest Offshore project that is located in Korea. The WF consists of 20 WTs with a total capacity of 60 MW. In this paper, the performance is compared according to a variety of indices such as network unavailability, mean downtime and network cost. To increase the network reliability, partial protection and full protection were investigated as strategies that can overcome the impact of a single point of failure. Furthermore, the reliability performances of different network architectures are analyzed, evaluated and compared.

Installation Scheduling for the Development of Southwest Coast 2.5GW Offshore Wind Farm (서남해안 2.5GW 해상풍력단지 조성을 위한 설치 일정계획)

  • Ko, Hyun-Jeung
    • Journal of Korea Port Economic Association
    • /
    • v.33 no.2
    • /
    • pp.83-96
    • /
    • 2017
  • As a way to address global warming, among the renewable energy sources, there have been heavy investments worldwide for the development of offshore wind farms. However, such development has a drawback: investment costs are higher than those for onshore wind farms due to required operations such as offshore transportation and installation. In particular, delays in installation due to adverse maritime weather conditions are factors that affect the economics of offshore wind farms' operation. Therefore, in this study, we analyze the optimal schedule of the construction of an offshore wind farm from a macro perspective by considering the weather conditions in Korea. For this purpose, we develop a mathematical model and apply it to a 2.5 GW offshore wind farm project on the southwestern coast of the country. We use data from the Korea Meteorological Agency for maritime weather conditions and attempt to reflect the actual input data based on precedent cases overseas. The results show that it takes 6 months to install 35 offshore wind turbines. More specifically, it is pointed out that it is possible to minimize costs by not working in winter.