• Title/Summary/Keyword: Software Test Process

Search Result 588, Processing Time 0.036 seconds

Software Product Line Development and Test Process Based on CVL (CVL 기반의 소프트웨어 프로덕트라인 개발 및 테스트 프로세스)

  • Cheon, Eunyoung;Seo, Yongjin;Lee, Ju Seok;Kim, Su Ji;Kim, Jin-A;Kim, Hyeon Soo
    • Journal of KIISE
    • /
    • v.42 no.1
    • /
    • pp.76-85
    • /
    • 2015
  • Software Product Line Engineering is a collection of techniques that analyze the commonalities and variabilities of the products within a product family and produce products using such information. In Software Product Line Engineering, construction of the correct core assets is very important. To accomplish this, the commonalities and variabilities must first be definitively identified, both to provide traceability between the core assets, and to guarantee the reliability of the products. This paper suggests software product line development and test processes based on CVL for the differentiation of commonalities and variabilities. The proposed approach enables correct building of the core assets through procedures to keep traceability and guarantee the reliability of the products.

A comparative study on learning effects based on the reliability model depending on Makeham distribution (Makeham분포에 의존한 신뢰성모형에 근거한 학습효과 특성에 관한 비교 연구)

  • Kim, Hee-Cheul;Cheul, Shin-Hyun
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.9 no.5
    • /
    • pp.496-502
    • /
    • 2016
  • In this study, we investigated the comparative NHPP software model based on learning techniques that operators in the process of software testing and development of software products that can be applied to software test tool. The life distribution was applied Makeham distribution based on finite fault NHPP. Software error detection techniques known in advance, but influencing factors for considering the errors found automatically and learning factors, by prior experience, to find precisely the error factor setting up the testing manager are presented comparing the problem. As a result, the learning factor is larger than automatic error that is usually well-organized model could be established. This paper, a trust characterization of applying using time among failures and parameter approximation using maximum likelihood estimation, after the effectiveness of the data through trend examination model selection were well-organized using the mean square error and $R^2$. From this paper, the software operators must be considered life distribution by the basic knowledge of the software to confirm failure modes which may be helped.

A Method of Reliability Growth Management Test Design for Continuous System (연속형 시스템의 신뢰성 성장 관리 시험 설계 방안)

  • Seo, Yang Woo;Yoon, Jung Hwan;Lee, Seung Sang;Um, Chun Sup
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.2
    • /
    • pp.87-96
    • /
    • 2020
  • In this paper we proposed the test design method of reliability growth management. First, we presented the process for establishing the reliability growth management test design considering the number of failures and the termination test time. Reliability growth analysis of continuous system was performed in accordance with the test design process presented. In case the reliability test result is not met with the reliability target value after more than three failures occurred, the required test times were analyzed that 1,725 hrs for one corrective action, 1,950 hrs for two corrective actions. If the number of failures is less than three, design a reliability demonstration test according to confidence level 80% and 90% was performed using RGA 11 Software. As a result, it is possible to establish the reliability growth management test design with sufficient use of available resources. The results of this study can be used when establishing a test design for assessment of reliability growth management of all continuous systems.

Wrapper Cell Design for Redundancy TSV Interconnect Test (Redundancy TSV 연결 테스트를 위한 래퍼셀 설계)

  • Kim, Hwa-Young;Oh, Jung-Sub;Park, Sung-Ju
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.48 no.8
    • /
    • pp.18-24
    • /
    • 2011
  • A new problem happens with the evolution of TSV based 3D IC design. The bonding process takes place which follows with the testing of design for proper connectivity in the absence of TSV redundancy. In order to achieve good yield, the design should be tested with redundancy TSV. This paper presents a wrapper cell design for redundancy TSV interconnect test. The design for test technique, in terms of hardware and software perspectives is described. The wrapper cell with hardware design can use original test patterns. However, software design has less area overhead.

Internal Pattern Matching Algorithm of Logic Built In Self Test Structure (Logic Built In Self Test 구조의 내부 특성 패턴 매칭 알고리즘)

  • Jeon, Yu-Sung;Kim, In-Soo;Min, Hyoung-Bok
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1959-1960
    • /
    • 2008
  • The Logic Built In Self Test (LBIST) technique is substantially applied in chip design in most many semiconductor company in despite of unavoidable overhead like an increase in dimension and time delay occurred as it used. Currently common LBIST software uses the MISR (Multiple Input Shift Register) However, it has many considerations like defining the X-value (Unknown Value), length and number of Scan Chain, Scan Chain and so on for analysis of result occurred in the process. So, to solve these problems, common LBIST software provides the solution method automated. Nevertheless, these problems haven't been solved automatically by Tri-state Bus in logic circuit yet. This paper studies the algorithm that it also suggest algorithm that reduce additional circuits and time delay as matching of pattern about 2-type circuits which are CUT(circuit Under Test) and additional circuits so that the designer can detect the wrong location in CUT: Circuit Under Test.

  • PDF

The Study for Performance Analysis of Software Reliability Model using Fault Detection Rate based on Logarithmic and Exponential Type (로그 및 지수형 결함 발생률에 따른 소프트웨어 신뢰성 모형에 관한 신뢰도 성능분석 연구)

  • Kim, Hee-Cheul;Shin, Hyun-Cheul
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.9 no.3
    • /
    • pp.306-311
    • /
    • 2016
  • Software reliability in the software development process is an important issue. Infinite failure NHPP software reliability models presented in the literature exhibit either constant, monotonic increasing or monotonic decreasing failure occurrence rates per fault. In this paper, reliability software cost model considering logarithmic and exponential fault detection rate based on observations from the process of software product testing was studied. Adding new fault probability using the Goel-Okumoto model that is widely used in the field of reliability problems presented. When correcting or modifying the software, finite failure non-homogeneous Poisson process model. For analysis of software reliability model considering the time-dependent fault detection rate, the parameters estimation using maximum likelihood estimation of inter-failure time data was made. The logarithmic and exponential fault detection model is also efficient in terms of reliability because it (the coefficient of determination is 80% or more) in the field of the conventional model can be used as an alternative could be confirmed. From this paper, the software developers have to consider life distribution by prior knowledge of the software to identify failure modes which can be able to help.

Design and Implementation of the subscriber MAC protocol in the BWA system

  • Hwang, You-Sun;Kim, Eung-bae
    • Proceedings of the IEEK Conference
    • /
    • 2003.07a
    • /
    • pp.569-572
    • /
    • 2003
  • The broadband wireless access industry, which provides high-tate network connections to stationary sites, has matured to the point at which it now has a standard for second-generation wireless metropolitan area networks. IEEE Standard 802.16, with its WirelessMAN air interface, set the stage for widespread and effective deployments worldwide. This paper presents an implementation of media access control that can be applied to BWA (Broadband Wireless Access) system. Medium access control (MAC) is a key issue in multi-access networks where a common channel is shared by many users. The designed MAC prototype roughly consists of MAC Hardware and MAC Software. The MAC Hardware part includes timing process, MAC transmission control, MAC reception control, and CRC/HCS process. The MAC Software part includes control of MAC signaling, network interface, and Physical (PHY) control. The designed MAC protocol will be integrated with the PHY of BWA in future and we can test overall system performance of MAC and PHY.

  • PDF

Development of Failure Reporting Analysis and Corrective Action System

  • Hong, Yeon-Woong
    • 한국데이터정보과학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.97-112
    • /
    • 2006
  • FRACAS(Failure Reporting, Analysis and Corrective Action System) is intended to provide management visibility and control for reliability and maintainability improvement of hardware and associated software by timely and disciplined utilization of failure and maintenance data to generate and implement effective corrective actions to prevent failure recurrence and to simplify or reduce the maintenance tasks. This process applies to acquisition for the design, development, fabrication, test, and operation or military systems, equipment, and associated computer programs. This paper shows the FRACAS development process and developed FRACAS system for a defense equipment.

  • PDF

ON CODING AND UNIT-TEST PROCESS MANAGEMENT FOR SOFTWARE DEVELOPMENT OF LARGE-SCALE

  • Kino Yasunobu
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.233-238
    • /
    • 1998
  • To manage a phase of coding and unit-test, project managers have used to pay attention to a number of completed programs. And the manager makes a graph of progress. Usually, this graph of progress has S shape and doesn't linearly depend on the workload. So the degree of progress seems to be behind. In actual, many projects tend to be behind the schedule. Because of this reason, it is difficult to judge whether the project is behind or not in the early stage. In this paper, We propose the 'four-division model' to solve this difficulty.

  • PDF

Tests for Mean Change with the Modified Cusum Statistics

  • Kim, Jae-Hee;Kim, Na-Yeon
    • Journal of the Korean Data and Information Science Society
    • /
    • v.14 no.2
    • /
    • pp.187-199
    • /
    • 2003
  • We deal with the problem of testing a sequence of independent normal random variables with constant, known or unknown, variance for no change in mean versus alternatives with a single change-point. Various tests based on the likelihood ratio and recursive residuals, score statistics and cusums are studied. Proposed tests are modified version of Buckley's cusum statistics. A comparison study of various change-point test statistics is done by Monte Carlo simulation with S-plus software.

  • PDF