The most urgent requirement in the event of disaster and fire in a skyscraper is to establish a system that enables people inside to evacuate safely. Hence, a practical direction needs to give evacuees confidence in the evacuation by reducing the psychological anxiety caused by the relatively large number of people inside and at the same time, the physically prolonged evacuation travel line. Evacuation tests with large numbers of people were conducted three times to solve these challenges and identify phenomena and issues that occurred during the experiment. The results revealed the factors that could cause a delay in evacuation and suggested improvements. The study results of this paper are as follows. First, a recent fire at a multipurpose high-rise resulted in a number of casualties due to a lack of experience with the disaster prevention system. To prevent such cases from occurring in advance, adaptability was achieved by conducting evacuation tests. Second, the data collected in the evacuation simulation statistics and the actual escape drills were compared and analyzed. Third, in the evacuation experiment, a large number of people could not participate in the experiment. The reasons for not participating were analyzed and their impact on the actual evacuation time was confirmed. Fourth, equipment aids were purchased to establish the optimal response measure to the causes of a delay in escape time and the standards for ensuring the safety of the evacuee were specified by developing improvements to minimize the evacuation delay time through comparative before and after analysis of the experiment. These results can be used for fire safety control of skyscrapers to improve the efficiency of evacuation.
A total of 19 elevators for evacuation were installed in the Lotte World Tower and it is planned to operate the shuttle using the manual key from five refuge floors to the 1st floor in an emergency. In the event of a fire or other disaster, it is necessary to conduct intensive analysis to determine how much RSET reduction could be achieved using the evacuation elevator compared to the existing evacuation plans. When the optimal transportation sharing ratio by the evacuation elevators was 40% at the Lotte World Tower, the RSET of the evacuation scenario in parallel with the elevators in the entire building was calculated to be 1 hour and 2 minutes. The RSET of a conventional evacuation scenario (Walking along the stairs without using the elevators) was calculated to be 1 hour 29 minutes, therefore, the former evacuation scenario were found to have a shortening effect of approximately 27 minutes compared to the latter. On the other hand, to maintain this effect, each part of the evacuation route using the elevator must have the capability to protect the evacuee from any hazards caused by fires, such as smoke, flame, and radiant heat during the evacuation. Moreover, the evacuation route should be continuous from the residence position of the elevator user to the final evacuation site, and be recognized easily.
In the event of a building fire, it is important to control the smoke generated to ensure the safe evacuation of occupants. A natural smoke ventilator should be installed to exhaust the fire smoke in accordance with the Korean building Act and Code. On the other hand, the present law does not specify the contents regarding natural smoke ventilators sufficiently. The problems that occur in various parts, such as the installation target, installation location, free area, and the control and maintenance of natural smoke ventilators need to be solved. In this study, the problem of the current system was examined through domestic and foreign standards, preliminary research, and field investigations. In addition, suggestions for improvement are provided.
Purpose: In the event of a fire in a high-rise building, if the smoke control area is not effectively protected, smoke or flames enter the stairwell, making it difficult to evacuate. When inflowing air is discharged from a closed corridor, a negative pressure is formed in the corridor, the pressure in the smoke control area becomes excessively high, and the force required to open the door during evacuation is exceeded. Also, if the air introduced into the hallway is not exhausted, the smoke may flow back into the smoke control area. This paper tried to identify the problems caused by the inflowing air and to find out how to improve the performance. Method: Using the CONTAM program, simulations were performed with the basic conditions and the modified conditions. Result: If the inflowing air was discharged from the sealed corridor, overpressure occurred in the Smoke Control Area and exceeded the opening force, and the prevent smoke backflow was insufficient in the layer where the inflowing air was not discharged. Conclusion: "Differential pressure exhaust damper" application, simultaneous opening of two exhaust dampers, and automatic window installation between corridors and outdoors improved the exhaust performance of inflowing air.
Kim, Mi-Seon;Seo, Dong-Gil;Gu, Seon-Hwan;Yoo, Young-Min;Song, Young-Joo
Fire Science and Engineering
/
v.33
no.6
/
pp.53-62
/
2019
A recent trend shows that more buildings are being constructed as mixed-use (residential and commercial) properties for efficient land use. This has led to an increased frequency in the occurrence of fires and the associated potential risks. In particular, in case of high-rise apartments, at least one of the elevators in each building is installed for evacuation purposes separately from the emergency elevator; therefore, for a combined ancillary room and emergency elevator platform situation, the structure is inevitably in series with the evacuation elevator platform. Thus, a proposal for a new type of ventilation zone based on existing national fire safety codes is required to achieve smoke control performance. To this end, the air egress velocity and differential pressure of each ventilation zone are checked using the "CONTAM" software; further, an alternative is proposed to secure smoke control performance for series structures.
As a core process in the manufacture of state-of-the-art industrial technologies such as semiconductor and LCD, a clean room is the most important process which can affect the performance and quality of products drastically. Nevertheless, scientific research on comprehensive safety measures from a fire protection standpoint is not being carried out in Korea. This study aims to derive measures to improve smoke control systems by identifying performance and problems of smoke systems installed in clean rooms as an LCD manufacturing process and analyzing fire and evacuation simulations considering several scenarios. As a result of analysis of fires and smoke in a clean roomas an LCD manufacturing process, it is found to be necessary to stop air handling units through interlocking in case of a fire and exhaust smoke out of the room through the top of FAB in consideration of buoyancy of smoke. It is also found to be necessary to install quick response sprinkler heads and accessories to accelerate the response time, because the heat-accumulating performance of sprinkler heads decreases in this application. Despite its low density of dwelling due to the automation process, clean room is characterized by an array of complex production equipment and working environment requiring dustproof clothes, which makes it difficult to acquire evacuation safety performance. Thus, thorough control of danger factors in processes and periodic education and training are required. It is also necessary to establish a level of domestic technologies equivalent to the level of standards of advanced countries in fire protection.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.1
/
pp.85-91
/
2018
Recently, there have been a lot of casualties due to fires in high-rise buildings. The toxic gases and smokes generated by fires in high-rise buildings spread rapidly through the elevator shaft and stairwell, due to the stack effect, and can cause critical casualties. To reduce the number of casualties, smoke control systems have been introduced. Smoke control systems play an essential role in preventing the spread of smoke in high-rise buildings and securing the evacuation route. Also, in high-rise buildings, evacuation by an elevator is considered to be indispensable. However, the pressure field in the shaft is strongly disturbed when the elevator is moving and this can affect the performance of the smoke control system. Therefore, in this study, we experimentally and numerically analyzed the effect of elevator movement on the pressure difference between the vestibule and living room by building a model using the sandwich pressurization method based on the performance based design. To consider the leakage areas in high-rise buildings, e.g. the windows, fire door and elevator, the National Fire Safety Codes and area ratio were used. The elevator speed in the model building was varied between 20 m/s and 100 m/s corresponding to a real elevator speed of 7 m/s~17 m/s. As a result, the relationship between the pressure difference and elevator speed was found to be ${\Delta}P=40{\cdot}{\exp}$(-Ves /-104.7)-23.735. This result can be used to take into consideration the effect of elevator movement when designing smoke control systems.
Kim, Daeill;Jeong, Juahn;Park, Sungchan;Go, Jooyeon;Yeom, Chunho
Journal of the Society of Disaster Information
/
v.16
no.1
/
pp.96-110
/
2020
Recently, due to global warming, it is easily exposed to various disasters such as fire, flood, and earthquake. In particular, large-scale disasters have continuously been occurring in crowded areas such as traditional markets, facilities for the elderly and children, and public facilities where various people stay. Purpose: This study aims to detect a fire occurred in crowded facilities early in the event to analyze and provide an optimal evacuation route using big data and advanced technology. Method: The researchers propose a new algorithm through context-aware 3D object model technology and A* algorithm optimization and propose a scenario-based optimal evacuation route selection technique. Result: Using the HPA* E algorithm, the evacuation simulation in the event of a fire was reproduced as a 3D model and the optimal evacuation route and evacuation time were calculated for each scenario. Conclusion: It is expected to reduce fatalities and injuries through the evacuation induction technique that enables evacuation of the building in the shortest path by analyzing in real-time via fire detection sensors that detects the temperature, flame, and smoke.
Kim, H.B.;Jang, Y.J.;Lee, D.H.;Jung, W.S.;Whang, H.B.
한국전산유체공학회:학술대회논문집
/
2010.05a
/
pp.505-507
/
2010
In this paper, the comparison on the fire driven smoke flow for platform types was conducted in the Deeply Underground Subway Station. Soongsil-University station (47m depth) as a bank type platform and Mandeok Station as a island type platform were selected for fire numerical simulation. The characteristics of fire driven smoke-flows were analyzed from the simulation results. The proper plan of evacuation against fire for each type was considered through the results.
Proceedings of the Korea Institute of Fire Science and Engineering Conference
/
2008.04a
/
pp.286-289
/
2008
In this study, we have survey of the actual smoke exhaust condition and improvement program in special escape stair. We have collected and analysed the survey view take 50 professional advice. Domestic a technical and legal standard is rated as compared with an advanced countries to $40{\sim}60%$. Hazard must be improved a security with the evacuation where the standard of present time is safe the reply with 64% to appear it was analyzed with the fact that the improvement which it follows hereupon is necessary.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.