• Title/Summary/Keyword: Smart-Grid

Search Result 1,001, Processing Time 0.028 seconds

Rotor Speed-based Droop of a Wind Generator in a Wind Power Plant for the Virtual Inertial Control

  • Lee, Jinsik;Kim, Jinho;Kim, Yeon-Hee;Chun, Yeong-Han;Lee, Sang Ho;Seok, Jul-Ki;Kang, Yong Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.5
    • /
    • pp.1021-1028
    • /
    • 2013
  • The frequency of a power system should be kept within limits to produce high-quality electricity. For a power system with a high penetration of wind generators (WGs), difficulties might arise in maintaining the frequency, because modern variable speed WGs operate based on the maximum power point tracking control scheme. On the other hand, the wind speed that arrives at a downstream WG is decreased after having passed one WG due to the wake effect. The rotor speed of each WG may be different from others. This paper proposes an algorithm for assigning the droop of each WG in a wind power plant (WPP) based on the rotor speed for the virtual inertial control considering the wake effect. It assumes that each WG in the WPP has two auxiliary loops for the virtual inertial control, i.e. the frequency deviation loop and the rate of change of frequency (ROCOF) loop. To release more kinetic energy, the proposed algorithm assigns the droop of each WG, which is the gain of the frequency deviation loop, depending on the rotor speed of each WG, while the gains for the ROCOF loop of all WGs are set to be equal. The performance of the algorithm is investigated for a model system with five synchronous generators and a WPP, which consists of 15 doubly-fed induction generators, by varying the wind direction as well as the wind speed. The results clearly indicate that the algorithm successfully reduces the frequency nadir as a WG with high wind speed releases more kinetic energy for the virtual inertial control. The algorithm might help maximize the contribution of the WPP to the frequency support.

Designing the Promotion Policy of Korea ESCO Industry through the Examination of Foreign Country Exercises (해외사례 조사를 통한 국내 ESCO 산업 활성화 방안)

  • Min, Eunju;Kim, Myeongrok;Nam, Kitae;Kang, Mingoo;Kim, Suduk
    • Environmental and Resource Economics Review
    • /
    • v.26 no.1
    • /
    • pp.103-121
    • /
    • 2017
  • The domestic ESCO project was introduced in 1992 as one of the energy efficiency improvement programs. In recent energy market, the changes in the market conditions such as smart grid, renewable energy, and the importance of demand response became important issues. As the diversified business models are required, examples of overseas exercises are examined. Business areas in Europe or the US where the ESCO industry has been active include measures to improve the efficiency of energy facilities in all areas, ranging from energy supply facilities and energy services to end users. This type of ESCO overseas business model can be classified into various types such as project execution method, supplier demand management, financing method, climate change and emission rights, new and renewable energy, and other criteria. In this study, we propose to adopt IEC (Integrated Energy Contracting) contract method in domestic ESCO market for additional business models. Current convention of listing the specific individual business types being allowed by regulation turned out to be obstacles to the revitalization of the related market. In order to achieve the goal of energy conservation, it is recommended, instead, to revise the current funding guidelines to be a negative system.

Analysis of Packet Transmission Delay in the DC Power-Line Fault Management System using IEEE 802.15.4 (IEEE 802.15.4를 적용한 직류배전선로 장애관리시스템에서 패킷전송 지연시간 분석)

  • Song, Han-Chun;Hwang, Sung-Ho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.1
    • /
    • pp.259-264
    • /
    • 2014
  • IEEE 802.15.4 has been emerging as the popular choice for various monitoring and control applications. In this paper, a fault management system for DC power-lines has been designed using IEEE 802.15.4, in order to monitor DC power-lines in real time, and to rapidly detect faults and shut off the line where such faults occur. Numbers were allocated for each node and unslotted CSMA-CA method of IEEE 802.15.4 was used, the performance of which was analyzed by a simulation. For such purpose, a total of 60 bits of the control data consisting of 16 bits of the current, 16 bits of the amplitude, 28 bits of the terminal state data were sent out, and the packet transfer rate and the transmission delay time of the fault management system for DC power-lines were measured and analyzed. When the traffic load was 330 packets per second or lower, the average delay time was shown to be shorter than 0.02 seconds, and when the traffic load was 260 packets per second or lower, the packet transfer rate was shown to be 99.99% or higher. Therefore, it was confirmed that the stringent condition of US Department of Energy (DOE) could be satisfied if the traffic load was 260 packets per second or lower, The results of this study can be utilized as basic data for the establishment of the fault management system for DC power-lines using IEEE 802.15.4.

A 0.18-μm CMOS Baseband Circuits for the IEEE 802.15.4g MR-OFDM SUN Standard (IEEE 802.15.4g MR-OFDM SUN 표준을 지원하는 0.18-μm CMOS 기저대역 회로 설계에 관한 연구)

  • Bae, Jun-Woo;Kim, Chang-Wan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.3
    • /
    • pp.685-690
    • /
    • 2013
  • This paper has proposed a multi-channel and wide gain-range baseband circuit blocks for the IEEE 802.15.4g MR-OFDM SUN systems. The proposed baseband circuit blocks consist of two negative-feedback VGAs, an active-RC 5th-order chebyshev low-pass-filter, and a DC-offset cancellation circuit. The proposed baseband circuit blocks provide 1 dB cut-off frequencies of 100 kHz, 200 kHz, 400 kHz, and 600 kHz respectively, and achieve a wide gain-range of +7 dB~+84 dB with 1 dB step. In addition, a DC-offset cancellation circuit has been adopted to mitigate DC-offset problems in direct-conversion receiver. Simulation results show a maximum input differential voltage of $1.5V_{pp}$ and noise figure of 42 dB and 37.6 dB at 5 kHz and 500 kHz, respectively. The proposed I-and Q-path baseband circuits have been implemented in $0.18-{\mu}m$ CMOS technology and consume 17 mW from a 1.8 V supply voltage.

Impact Analysis of Water Blending to Reverse Osmosis Desalination Process (원수 블렌딩이 해수담수화 역삼투 공정 성능에 미치는 영향)

  • Kim, Jihye;Park, Hyung Jin;Lee, Kyung-Hyuk;Kwon, Boungsu;Kwon, Soonbuhm;Lim, Jae-Lim
    • Membrane Journal
    • /
    • v.30 no.3
    • /
    • pp.190-199
    • /
    • 2020
  • The utilization of multiple water sources becomes important due to the master plan for development of water supply released by Ministry of Environment, Korea in 2018. In this study, therefore, the analysis of comprehensive effect in blending applicable water sources in Daesan where 100,000 ㎥/d seawater desalination plant will be constructed for industrial use was performed. The increase in mixing ratio of other water sources with seawater reduced salinity up to 50%, but negatively impacted the turbid and organic matter. Lab-scale reverse osmosis performance test also found that membrane fouling was exacerbated in blended water condition. The simulation results of reverse osmosis indicated 39% energy saving on average is expected at the one-to-one blending ratio, however, long-term performance test at the pilot-scale plant is highly required to evaluate the inclusive impact of mixing seawater and other water sources.

MIMO-OFDM BPLC over Statistical Power Line Channels with Cross-Talk (크로스 토크를 갖는 통계적 전력선 채널 하에 MIMO-OFDM 광대역 전력선 통신)

  • Yoo, Jeong-Hwa;Choe, Sang-Ho;Pine, Nazcar
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.12B
    • /
    • pp.1565-1573
    • /
    • 2011
  • In this paper, we present a MIMO-OFDM broadband power line communication (BPLC) for Smart Grid and its associated applications and analyze its performance over the 3-phase 4-wire power line channels. For practical BPLC system simulation, we adopt the statistical power line fading channel model instead of the existing deterministic fading channel models (Zimmermann model, MTL model, and so on). In this paper, we implement $2{\times}2$ and $3{\times}3$ MIMO schemes using 3-phase 4-wire power lines. We investigate the capacity loss and BER performance of the proposed MIMO system by considering the effect of cross-talk between antenna paths. We choose space-frequency coding in order to reduce frequency interference between subcarriers and employ maximum ratio combining (MRC) that achieves both multiple antenna path diversity gain and multiple fading path diversity gain. We evaluate the proposed system performance through computer simulation in terms of the impulse noise index and the capacity loss ratio and compare the different signal combining schemes including MRC, equal gain combing (EGC), and selection combining (SC).

A Study on Competency Evaluation and Improvement Plan of Electrical Construction Management Using Importance-Performance Analysis (IPA를 활용한 전기공사 건설사업관리 역량 평가 및 개선방안 연구)

  • Kim, Seungbeum;Byun, Jeongyoon;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.103-112
    • /
    • 2014
  • Since recent construction projects become larger and complicated, the level of difficulty of management skill is rising, and the risk is increasing accordingly so the necessity of improving management skill of projects is increasing. In order to solve this problem, Construction Management system was preferentially introduced in construction projects but in case of domestic construction industry, separate contracts by business boundary are being made so the actual state is that the function of the Construction Management system is not properly operated over the overall projects. The partial operation of Construction Management system like this may impose many restrictions on converged and combined projects such as smart grid and intelligent buildings etc. in the future. For improvement of management skill of domestic construction projects, the competence of project management skill by work areas that can overcome heterogeneity of the current project management skill shall be secured, and any factor that impedes cooperation ability shall be found and that shall be solved. Therefore, the difference of work competency of project management system of construction and electrical construction is to be analyzed by utilizing IPA model in this study, and a plan to introduce the project management system of electrical construction for efficient operation of projects is to be looked into.

Design and Implementation of File Cloud Server by Using JAVA SDK (Java SDK를 이용한 파일 클라우드 시스템의 설계 및 구현)

  • Lee, Samuel Sangkon
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.8 no.2
    • /
    • pp.86-100
    • /
    • 2015
  • Cloud computing is a computing term that evolved in the late 2000s, based on utility and consumption of computer resources. Google say that "Cloud computing involves deploying groups of remote servers and software networks that allow different kinds of data sources be uploaded for real time processing to generate computing results without the need to store processed data on the cloud. Cloud computing relies on sharing of resources to achieve coherence and economies of scale, similar to a utility (like the electricity grid) over a network. At the foundation of cloud computing is the broader concept of converged infrastructure and shared services. Cloud computing, or in simpler shorthand just "the cloud", also focuses on maximizing the effectiveness of the shared resources." The cloud service is a smart and/or intelligent service to save private files in any device, anytime, anywhere. Dropbox, OAuth, PAClous are required that the accumulated user's data are archives with cloud service. Currently we suggest an implementation technique to process many tasks to the cloud server with a thread pooling. Thread pooling is one of efficient implementating technique for client and service environment. In this paper, to present the implementation technique we suggest three diagrams in the consideration of software engineering.

A Proposal of the Prediction Method of Decentralized Power on Climatic Change (기후 변화에 따른 분산 전력 예측 방법 제안)

  • Kim, Jeong-Young;Kim, Bo-Min;Bang, Hyun-Jin;Jang, Min-Seok
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2010.05a
    • /
    • pp.942-945
    • /
    • 2010
  • The development of decentralized power has appeared as part of an effort to decrease the energy loss and the cost for electric power facilities through installing small renewable energy generation systems including solar and wind power generation. Recently a new era for decentralized power environment in building is coming in order to handle the climatic and environmental change occurred all over the world. Especially solar and wind power generation systems can be easily set up and are also economically feasible, and thus many industrial companies enter into this business. This paper suggests the overall architecture for the decentralized renewable power system and the prediction method of power on climatic change. The ultimate goal is to help manage the overall power efficiently and thus provide the technological basis for achieving zero-energy house.

  • PDF

Development of State of Charge and Life Cycle Evaluation Algorithm for Secondary Battery (이차전지의 상태 감시 및 수명 예측 알고리즘 개발)

  • Park, Jaebeom;Kim, Byeonggi;Song, Seokhwan;Rho, Daeseok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.1
    • /
    • pp.369-377
    • /
    • 2013
  • This paper deals with the state of charge(SOC) and life cycle evaluation algorithm for lead-acid battery, which is essential factor of the electric vehicle(EV) and the stabilization of renewable energy in the smart grid. In order to perform the effective operation of the lead-acid battery, SOC and life cycle evaluation algorithm is required. Specific gravity with the change of electrolyte temperature inside battery case should be obtained to evaluate the SOC of lead-acid battery, however it is difficult to measure the electrolyte temperature of sealed type lead-acid battery. To overcome this problem, this paper proposes the equation of thermal transmission to compensate internal temperature of the lead-acid battery. Also, it is difficult to exactly evaluate the life cycle of battery, depending on the operation conditions of lead-acid battery such as charging and discharging state, self discharging rate and environmental issue. In order to solve the problem, this paper presents the concept for gravity accumulation of charge and discharge cycle, which is the value converted at $20^{\circ}C$. By using the proposed algorithm, this paper propose the test device based on the Labview software. The simulation results show that it is a practical tool for the maintenance of lead-acid battery in the field of industry.