• Title/Summary/Keyword: Small scale river

Search Result 119, Processing Time 0.049 seconds

The Developmet and Application of GIS-Based Geomorpho-Hydrological Watershed Model (G2WMS) (GIS기반 지형수문유역모의 모형의 개발 및 적용 연구)

  • Kim, Hong-Tae;Shin, Hyun-Suk
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.1
    • /
    • pp.123-133
    • /
    • 2009
  • In this study, we developed the GIS-based Geomorpho-hydrological Watershed Modeling System($G^{2}WMS$) which could consider both nonlilear rainfall-runoff relationship based on Geomorpho-Climatic Unit Hydrograph(GCUH) as well as watershed system inducing river routing. The developed new model was calibrated at the gaged rainfall events at natural watersheds and previewed to apply at the ungaged mountain basins, such as Sulma basin for small mountain basin and Andong-Dam basin for large scale basin, compared single with partitioned basin in the observed unit hydrographs and rainfall-discharge events. Finally, at the large scale Andong dam basin, we concluded that partitioned basin cases which including th nonlinear GCUH and river routing methods were superior to single basins which including the traditional methods in rainfall-discharge simulation at the mountain basins.

Long Term Evaluation of UF Membrane process using River-bed Water (복류수를 이용한 한외여과공정의 장기운전 평가)

  • Kim, Chung H.;Lim, Jae L.;Kang, Suk H.;Kim, Su H.
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.4
    • /
    • pp.429-436
    • /
    • 2008
  • Membrane system has been increasingly considered as a safe and cost-effective water treatment process especially in case of small scale water works. This research is a basis of membrane application in water works through a long period test with obtaining operation skills and evaluation of water quality and cost competitiveness. For the research, the UF membrane system was installed in small water treatment plant that uses river-bed water as raw water. The system was consisted of 2 stage membrane and operated in constant flow mode (Flux: 1.5, 1.0, 0.9, 0.6). In each different flux condition, TMP trends were showed better results at lower flux condition. And through the high flux condition test, it is certified that membrane system could deal with breakdown of one stage. Water quality of permeate was satisfied the water quality standards especially turbidity. To know what mainly causes fouling on membrane, the test by membrane with several cleaning agents and EDX analysis have done in lab. Through the tests, ferrous concentration in raw water, backwashing water and membrane surface etc. was high and it causes fouling inside and outside of membrane. So acid cleaning using organic acid such as oxalic acid is necessary in Chemical in Place (CIP). At the economical aspect the electrical cost of membrane system is higher than that of slow sand filtration but labor cost can be reduced by automation. However, the use of labor should be determined considering effectiveness and stability of operation. Because during the operation, there are several breakdown such as electrical shock by lightning, water drop in summer, etc.

Restoration Method of Small Stream using Artificial Step-pool Sequences (계단상 하상구조를 이용한 계류복원 방안)

  • Kim, Suk-Woo;Chun, Kun-Woo;Kim, Kyoung-Nam;Park, Chong-Min;Marutani, Tomomi
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.14 no.4
    • /
    • pp.11-23
    • /
    • 2011
  • Mountain streams, which are major components of an entire river network, play an important role as the source of water, sediment, coarse and fine organic matter, and nutrients for lowland rivers. Therefore, dynamics and downstream linkages of each compartment of the mountain stream can be essential for watershed management in catchment scale. The dynamics and downstream linkages are understood as a development of step-pool sequences along a river course. Recently, stream restoration after flooding event often employ the development of step-pool sequences in the world. In this paper, we 1) examined the geomorphic characteristics and the role of step-pool sequences in steep mountain streams by reviewing the results of past studies, and 2) introduced the case studies of stream restoration using step-pool sequences, and finally 3) addressed design methods considering geometry and stability of artificial step-pool sequences for stream restoration. Step-pool sequences play an important role not only as roughness with energy dissipation but also as heterogeneity of stream feature for aquatic habitat. Step-pool sequences, even if they are constructed artificially along a stream, may be effective for small stream restoration considering eco-friendly torrent controls. So far the artificial step-pool sequences were employed for mountainous streams, but those would be applied to urban stream.

Restoration Plan of Changwon and Nam Streams Based on the Results of Diagnostic Assessment (생태적 진단결과에 기초한 창원천과 남천의 복원계획)

  • An, Ji Hong;Lim, Chi Hong;Jung, Song Hie;Kim, A Reum;Woo, Dong Min;Lee, Chang Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.5
    • /
    • pp.511-524
    • /
    • 2017
  • This study was carried out for the purpose of creating a restoration plan to improve the ecological quality of the Changwon and Nam streams. Based upon the results of comprehensive diagnostic assessment, restoration priority was given to the upstream reach, where conservation status is relatively superior. Restoration level was usually determined to practice active restoration as conservation, and the states of both Changwon and Nam streams were not so good. Restoration plans, by reach, were classified into "upstream", "midstream", and "downstream" were suggested in both terms of horizontal section frame and vegetation-based on the result of diagnostic assessment and the reference information. "Upstream", "mid-stream" and the "downstream" of Changwon and Nam streams were classified into "small-gravel- mountainous", "small-sand-plain", and "small-clay-plain streams" respectively (based on scale, and substrate and slope of river bed). The spatial arrangement of vegetation was laid out in diagram form by reflecting micro-topography and the water level of the horizontal section of river. Information regarding species composition was recommended as dominant species, which appear frequently in three vegetation zones composed of herbaceous plants, shrubs and trees and sub-tree- dominated zones divided by reflecting disturbance regime, depending on position on the horizontal section of river. Moreover, there have been prepared not only plans to improve the terrestrial ecosystems around the streams but also plans to create ecological networks, which can serve to improve the ecologic quality of the whole regional environment by serving to connect streams and terrestrial ecosystems, a process probably necessary and definitely recommended to realize true (genuine) restoration. Plans for ecological parks and networks were prepared by mimicking the species composition of Alnus japanica community, Zelkova serrata community, Carpinus laxiflora community, Quercus aliena community, and Q. serrata community.

A study on the estimation of river water intake using the operating time of the pumping station (양수장의 가동시간을 이용한 하천수 취수량 산정방안 연구)

  • Baek, Jongseok;Kim, Chiyoung;Cha, Jun-Ho;Song, Jaehyun
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.2
    • /
    • pp.89-96
    • /
    • 2020
  • Water management agencies under the Ministry of Environment produce and accumulate qualified basic data for major rivers. However, the integrated management of the river water has been weak since the artificial water circulation process, such as the intaking and drainage of agricultural water, has not been examined in the basin, which includes many agricultural land. In this study, a study was conducted on how the power usage method (operating time method) based on the running time can be applied and improved among indirect flow rate measurement methods used to investigate flow rates collected by the riverside for agricultural water purposes, and thus the resultant data of high reliability can be obtained at low cost. The operation time method is suitable for small-scale water pumping stations where it is difficult to secure real-time power supply data. The reliability of the data was verified through the correlation analysis with the actual flow rate, and it was found that the flow rate calculated by the operation time method reflecting the level of the stream to which the inlet of the pumping station is connected can be reasonably matched with the actual flow rate. In addition, it was confirmed that the investment cost at the time of initial installation of the facility was highly efficient by generating qualified flow data at low cost through comparison with direct flow rate measurement methods. If flow data is secured by applying the operation time method to large and small water farms located along the riverside, it is expected that more quantitative and integrated stream water management will be possible.

A Study on the Changes of Architectural View of the Sangju academic clique of the Taegae School (퇴계학파(退溪學派) 상주학맥(尙州學脈)의 건축관(建築觀) 변천(變遷)에 관한 연구(硏究))

  • Youn, Lily
    • Journal of architectural history
    • /
    • v.13 no.3
    • /
    • pp.85-95
    • /
    • 2004
  • Through 16-17th century, Neo-Confucianism was accepted and extended to Chosun Dynasty. The architecture of the Taegae school made buildings of Yongnam area rich by adding the regional characteristics based on Taegae's thought of architecture. The following is the architectural characteristics of the academic clique around Sangju. Transformation such as separation and combination of the Jeongsa space by function, lifted floor type reflecting local feature or high platform was appeared, and the architectural characteristics of the Taegae school, that is, a small scale, a moderate figure, a type of side-attached floor, landscape, were still maintained at the same time. The characteristics of the Taegae school and regional figure of Sangju were well joined. The upper class houses, Seodang, Jeongsa and Seowon, built by Confucianist had shared common Confucian characteristics in spite of their different purposes. The world view of the Confucianism such as sacrifice for sages, cultivation, devoting for study, teaching disciples, and education for villagers was revealed through the Confucian architecture including dwelling houses during the 16-17th century. Buildings of Confucianist were focused on the space for men. Seoae and Kyumam built two different Jeongsa's inside and outside of the boundary of the nakdong river. While Seodang and Jeongsa located outside of the boundary of the river were built excluding spaces for living, the function of the Jeongsa located inside of the boundary of the river was assimilated by Sarangcahe. However, both buildings kept the function for cultivation, devoting for study and teaching.

  • PDF

An Approximate Cost Estimating Model for Eco-River Facility Construction Project at Planning Stage (자연형 하천공사 개략공사비 산정모델의 개발)

  • Choi, In-Wook;Lee, Si-Wook;Woo, Sung-kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.104-112
    • /
    • 2009
  • After the middle of 90's, the eco rivers maintenance enterprise was propelled about city rivers. The environmental function is more emphasized because of revising the rivers law enforced at 2008.4. Also, the field of application is being magnified. It is difficult to apply that the conceptual public work expense estimating model of the rivers which adjusts a focus at open channel rivers excepts the small-scale rivers maintenance public work. The research presents a eco rivers public work conceptual public work expense estimating model frame work. It suits the change of the rivers environmental renewal construction paradigm. It develops the conceptual public work expense estimating plan of the rivers at the planning phase using the collection and analysis of the data. As a result, riffle, spur dyke, stepping stones, fish way and etc are added. Consequently, it brings the hydrophilic function is considered seriously conceptual public work expense estimating model of the eco rivers.

Incipient motion criteria of uniform gravel bed under falling spheres in open channel flow

  • Khe, Sok An;Park, Sang Deog;Jeon, Woo Sung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.149-149
    • /
    • 2018
  • Prediction on initial motion of sediment is crucial to evaluate sediment transport and channel stability. The condition of incipient movement of sediment is characterized by bed shear stress, which is generated from force of moving water against the bed of the channel, and by critical shear stress, which depends on force resisting motion of sediment due to the submerged weight of the grains. When the bed shear stress exceeds the critical shear stress, sediment particles begin rolling and sliding at isolated and random locations. In Mountain River, debris flow frequently occurs due to heavy rainfall and can lead some natural stones from mountain slope into the bed river. This phenomenon could add additional forces to sediment transport system in the bed of river and also affect or change direction and magnitude of sediment movement. In this paper, evaluations on incipient motion of uniform coarse gravel under falling spheres impacts using small scale flume channel were conducted. The drag force of falling spheres due to water flow and length movement of falling spheres were investigated. The experiments were carried out in flume channel made by glass wall and steel floor with 12 m long, 0.6 m wide, and 0.6 m deep. The bed slopes were selected with the range from 0.7% to 1.5%. The thickness of granular layer was at least 3 times of diameter of granular particle to meet grain placement condition. The sphere diameters were chosen to be 4cm, 6 cm, 8 cm, 10 cm. The spheres were fallen in to the bed channel for critical condition and under critical condition of motion particle. Based on the experimental results, the Shields curve of particles Reynold number and dimensionless critical shear stress were plotted. The relationship between with drag force and the length movement of spheres were plotted. The pathways of the bed material Under the impact of spheres falling were analyzed.

  • PDF

Contamination of Shellfish with Vibrio vulnificus the Present Situation and Countermeasures (어패류의 비브리오패혈증 균 오염과 그 대책)

  • 김영만
    • Journal of Food Hygiene and Safety
    • /
    • v.8 no.2
    • /
    • pp.13-21
    • /
    • 1993
  • Vibrio septicemia,, resulting in high mortality, has been caused by Vibrio vulnificus. Ingestion of marine products or contact with sea water contaminated with Vibrio vulnificus can cause septicemia. Vibrio vulnificus has been detected world wide and west sea area of Korea, Kum river estuary in particular, showed high detection rate. Higher detection rate of Vibrio vulnificus were reported in the bottom deposit with low depth of water, low salinity, and high COD. Man with the liver disease can easily come down with Vibrio septicemia and the main source is the sliced raw fish dish. The preventive measure for this disease is to wash raw fish material thoroughly with tap water and handle in sanitary conditions. Washing with sea water is strictly prohibited . It may be necessary to forbid the small-scale businessmen from selling the sliced ray fish dish in the vicinity of seashore. Man with the liver disease of diabetes should not swim or consume the raw fish dish in the contaminated area during summer.

  • PDF

A Survey of Expert's Perceptions about Landscape Elements in Organic Farmland (유기농경지 농업생산경관 구성요소에 대한 전문가 인식 조사)

  • An, Phil-Gyun;An, Nan-Hee;Shin, Ji-Hoon;Shin, Jea-Hoon
    • Korean Journal of Organic Agriculture
    • /
    • v.24 no.4
    • /
    • pp.681-698
    • /
    • 2016
  • With increasing public concern for environmentally friendly agriculture, ecological aspect of landscape management is of growing importance. AHP (Analytical Hierarchy Process) analysis were conducted based on the delphi survey of 31 experts to evaluate the relative importance and the preference of landscape elements. Landscape components of organic farmland were classified into 2 landscape fields, 5 landscape types, 14 landscape units, and 37 landscape elements. Overall relevance score for the proposed landscape components were about 5.5 on the seven point scale. While the relative importance weight of cropland landscape field was 0.71, the weight of intra-structure landscape field was 0.29. Among the cropland landscape, relatively higher weight was assigned to farming system (0.47) and margins (0.31), as compared with hydrological system (0.22). In the farming system, crop (0.40) and farm land (0.39) were the most important landscape units. In the margins, higher weight was given to Buffer zone (0.44) and Trees (0.42). Biological habitat (0.43) ranked the highest score in the hydrological system. Preferable landscape elements were glass house, companion plants, rice paddy field, diverse crop species, small pond, and small river, which are representing ecological advantage of organic farming systems. This result indicated that the landscape elements identified in the study would be suitable to evaluate ecological aspect of rural landscape in organic farmland.