• Title/Summary/Keyword: Small hydro power

Search Result 175, Processing Time 0.027 seconds

Technical feasibility study for power generation from a potential mini hydro site nearby Shoolini University

  • Pundir, Anil;Kumar, Anil
    • Advances in Energy Research
    • /
    • v.2 no.2
    • /
    • pp.85-95
    • /
    • 2014
  • Small Hydro-Power (SHP) is an environmental friendly technology. Usually hydro power generation projects are viewed as constructing large dams and reservoirs but available new research and engineering techniques have helped hydro power generation without large dams and without large reservoirs. In India, there are several water installations, irrigation dams, canals, streams or running rivers not tapped to generate power. In these cases the existing system and facilities can help in generating power with less investment and time. This area is yet unexplored. Harnessing a stream for hydroelectric power is a major undertaking for the energy crises and the global issues to go green. In this technical note a potential site for mini hydro power plant nearby Shoolini University is identified and examined for the economic feasibility.

Field Test for Performance Evaluation of a Tubular Turbine in Marine Small Hydro Power Plant (해양소수력발전소 튜블러 수차 성능평가를 위한 현장시험)

  • Hwang, Yeong-Ho;Lee, Young-Ho;Choi, Young-Do
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.35 no.8
    • /
    • pp.1070-1077
    • /
    • 2011
  • This study includes field test results for performance evaluation of a tubular turbine in marine small hydro power plant. Minimum output power of the tested turbine generator is examined with using of the measured effective head, output power and efficiency. For the rated and maximum output power tests, corrected values from the result of turbine model test are used for the performance evaluation, because experimental conditions of field test at the rated and maximum output powers are restricted correctly. Performance of the test turbine shows good conformance with the suggested guarantee values of output power and efficiency at the measured points of minimum, rated and maximum output power.

Construction of small hydropower facilities performance evaluation system (소수력 발전설비 성능평가 시스템 구축)

  • Kim, Youngjoon;Kim, Yongyeol;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.193.2-193.2
    • /
    • 2010
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

Construction of small hydropower facilities performance evaluation system (소수력 발전설비 성능평가 시스템 구축)

  • Kim, Youngjoon;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.206.2-206.2
    • /
    • 2011
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

Performance Analysis of a Cross Flow Hydro Turbine by Runner Blade Number (소수력발전용 횡류수차의 러너 블레이드 깃수에 따른 성능해석)

  • Choi, Young-Do;Jin, Chang-Fu;Lim, Jae-Ik;Kim, You-Taek;Lee, Young-Ho
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.32 no.5
    • /
    • pp.698-706
    • /
    • 2008
  • Performance improvement of Small hydro turbine is a very important subject to solve in the stage of introduction and development of the turbine. Cross-flow hydro turbine should be also studied more in detail for the turbine performance in order to extend the sites of application. In order to improve the turbine performance, the effect of the turbine shape on the turbine performance should be examined. Therefore, the effect of runner blade number on the turbine performance is investigated by use of a commercial CFD code. The results show that runner blade number gives remarkable effect on the efficiency and output power of the turbine. Pressure on the surface of the runner blade changes considerably by the blade number at Stage 1, but relatively small change of velocity distribution occurs in the flow passage.

Performance Analysis for Small Hydro Power at Existing Water Treatment Facilities (물관련 설비를 이용한 소수력발전 성능분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.134-137
    • /
    • 2008
  • A methodology to evaluate the performance analysis for small hydropower at existing water treatment facilities has been studied. It consists of two main parts; flow duration function which can describe existing water treatment facilities and performance analysis to estimate the output characteristics of small hydro power plants. The output performance characteristics for Mi-ho reservoir, Sum-kang low dam, Sun-cheon sewage treatment plant and Nam-dong purification plant were analyzed, using developed model. According to the simulation results, the predicted data show that the data were in good agreement with measured results. Also, it was found that the developed model in this study can be used to analyze the output characteristics for small hydro power at existing water treatment facilities.

  • PDF

A Framework for Investment Justification and Economic Operation- (한국의 다목적댐 수력발전 체계-투자의 정당화와 경제적 운영-)

  • 이승규;박용삼
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.12 no.1
    • /
    • pp.157-157
    • /
    • 1987
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

CFD Performance analysis of Micro Tubular-type hydro turbine by blade shape (블레이드 형상 변화에 따른 마이크로 튜블러 수차의 CFD 성능해석)

  • Park, Ji-Hoon;Hwang, Young-Cheol;Mo, Jang-Oh;Kim, You-Taek;Lee, Young-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.206.1-206.1
    • /
    • 2011
  • Recently, various developments in the area of small hydropower have being made and small hydro turbines are suitable for domestic use because it is a clean and renewable energy source. A small hydropower generator produces power by using the different water pressure levels in pipe lines and energy which was initially wasted by use of a reducing valve at the end of the pipeline is instead collected by a tubular-type hydro turbine in the generator. In this study, in order to acquire the performance of tubular-type hydro turbine applied, the output power, head, efficiency characteristics due to the different guide vane and runner vane angle are examined in detail. Moreover, influences of pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  • PDF

A Study on Setting of IED for Small Hydro Generation System (소수력 발전시스템을 위한 IED의 정정치에 관한 연구)

  • Ahn, Tae-Pung;Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.66 no.1
    • /
    • pp.15-20
    • /
    • 2017
  • In order to advance and improve the performance of domestic aged power plants, IEDs have been developed for power generation systems. For smooth installation and operation of the protection relays, a detail settings study of IED is required. This paper deals with an analysis based on PSCAD and setting investigation of IED for loss of field, reverse power protection in Small Hydro Generation System.

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro-Power Plants (터널식 소수력 발전소의 최적 설계유량에 관한 연구)

  • 이철형;박완순
    • Water for future
    • /
    • v.24 no.1
    • /
    • pp.63-71
    • /
    • 1991
  • This study represents the methodology for feasibility analysis of small hydro power plants. Cumulative density function of Weibull distribution and Thi-essen method were adopted to beside flow duration curve at candidate sites. The performance prediction model and construction cost estimation model for tunnel-type small hydro power plants were developed. Eight candidate sites existing on Han river selected and surveyed for actual sites reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrates with the lowest unit generation cost for tunnel-type small hydro power plants were the flowrate concerning with between 20 % and 30 % of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual average load factor, annual electricity production were estimated and discussed for surveyed sites.

  • PDF