• Title/Summary/Keyword: Small hydro generation system

검색결과 26건 처리시간 0.02초

구미하수처리장 방류구에서의 소수력발전 설치 및 운영에 관한 연구 (Feasibility Study on the Construction of Small Hydro-Power Plants in Gumi Sewage Treatment Plant Discharge Point)

  • 나동훈;이승환
    • 상하수도학회지
    • /
    • 제24권2호
    • /
    • pp.173-181
    • /
    • 2010
  • This study was conducted to investigate the possible installation of small hydro-power plant at the discharge point of Gumi sewage treatment plant (STP) using treated wastewater. Sufficient amount of water to transfer to electric power and the selection of proper location are two essential elements for the construction of small hydro-power facility. Preliminary analysis based on site visit and existing data in Gumi STP were made. Capacity of the small hydro-power plants and exact location were determined by geomorphological condition and flow duration characteristics. Flow duration characteristics and its duration curve were identified using monthly rainfall data in Gumi STP. Relevant facts of small hydro-power system in other STP were referred to adopt to Gumi STP situation. Flowrate of treated effluents and effective head between flow chamber and the location of hydraulic turbine in Gumi STP are found to be $3.70m^3$/sec and 3.5m respectively. Electric generation rate based on this feasibility study was estimated to be 86.3kW/h. Yearly electric generation rate was expected to be 932.4MMh. Proposed small hydro-power plant construction in Gumi STP is to be reasonable.

소수력 발전시스템을 위한 IED의 정정치에 관한 연구 (A Study on Setting of IED for Small Hydro Generation System)

  • 안태풍;박철원
    • 전기학회논문지P
    • /
    • 제66권1호
    • /
    • pp.15-20
    • /
    • 2017
  • In order to advance and improve the performance of domestic aged power plants, IEDs have been developed for power generation systems. For smooth installation and operation of the protection relays, a detail settings study of IED is required. This paper deals with an analysis based on PSCAD and setting investigation of IED for loss of field, reverse power protection in Small Hydro Generation System.

한국의 다목적댐 수력발전 체계 - 투자의 정당화와 경제적 운영 - (Hydro-electric Power Generation System of Multi-purpose Dams in Koresa - A Framework for Investment Justification and Economic Operation -)

  • 이승규;박용삼
    • 경영과학
    • /
    • 제12권1호
    • /
    • pp.157-173
    • /
    • 1995
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

  • PDF

한국의 다목적댐 수력발전 체계-투자의 정당화와 경제적 운영- (A Framework for Investment Justification and Economic Operation-)

  • 이승규;박용삼
    • 한국경영과학회지
    • /
    • 제12권1호
    • /
    • pp.157-157
    • /
    • 1987
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

Technical feasibility study for power generation from a potential mini hydro site nearby Shoolini University

  • Pundir, Anil;Kumar, Anil
    • Advances in Energy Research
    • /
    • 제2권2호
    • /
    • pp.85-95
    • /
    • 2014
  • Small Hydro-Power (SHP) is an environmental friendly technology. Usually hydro power generation projects are viewed as constructing large dams and reservoirs but available new research and engineering techniques have helped hydro power generation without large dams and without large reservoirs. In India, there are several water installations, irrigation dams, canals, streams or running rivers not tapped to generate power. In these cases the existing system and facilities can help in generating power with less investment and time. This area is yet unexplored. Harnessing a stream for hydroelectric power is a major undertaking for the energy crises and the global issues to go green. In this technical note a potential site for mini hydro power plant nearby Shoolini University is identified and examined for the economic feasibility.

수도관로 소수력발전 운영효율 향상을 위한 최적제어 방안 (The Optimum Control Study for Improving Efficiency of the Small Hydropower Generation in Water Pipe)

  • 홍정조;임동희;김수상
    • 신재생에너지
    • /
    • 제4권2호
    • /
    • pp.31-38
    • /
    • 2008
  • Using a surplus head in presented water supply pipes, we have studied to improve the operating efficiency of small hydro generator, which was chosen for a test model with 00 hydro power plant. With regard to power control and countermeasure of water hammer impact, Finally we have represented the optimal control method through the synthetical analysis of existing system symptoms, operation efficiency, the effect of water hammer impact and system configuration.

  • PDF

하수처리장의 방류수를 이용한 일체형 발전장치의 성능평가 및 경제성 분석 (Performance Evaluation and Economic Analysis on the Integrated Small Hydro Power Generation Device Using a Discharged Water of Sewage Treatment Plant)

  • 박유신;김기중
    • 한국산학기술학회논문지
    • /
    • 제18권9호
    • /
    • pp.486-491
    • /
    • 2017
  • 하수처리장의 방류수는 낙차를 이용하는 기존 발전 방식으로는 소수력발전에 대한 경제성이 없어 버려지는 물로 인식되어져 왔다. 국내 대다수의 하수처리장 방류수로는 2m 미만의 낙차를 형성하고 있고 유량이 지속적이며 변동이 크지 않다는 점을 고려할 때, 저낙차 조건에서도 안정적인 전력 생산과 효율을 유지할 수 있는 소수력 발전장치 개발이 시급히 요구된다. 본 논문은 저낙차의 유수 특성을 갖는 하수처리장 방류수로에 적용 가능한 일체형 소수력 발전장치의 개발을 완료하여 발전장치에 대한 성능 평가 및 결과를 분석하였다. 그리고 실제 적용을 위한 경제성과 활용방안을 제시하였다. 분석결과, 발전기 효율은 92%이며 전력량은 10kWh로서 경제성의 경우 B/C를 1.0 이상 확보할 수 있는 것으로 분석되었다. 특히, 일체형 발전장치의 운영수준을 정격출력의 80% 이상으로 유지할 경우 경제성 확보가 가능하여 23년차 이후에는 투자비를 회수하여 이익이 발생하는 것으로 확인하였다. 일체형 소수력 발전장치는 하수처리장의 방류수뿐만 아니라 이와 유사한 유수 특성을 갖는 시설에 확대 적용할 경우 긍정적인 효과가 기대된다.

수차발전기 상태진단시스템을 이용한 예지보전체계 (Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator)

  • 김응태;고성호;김현;정용채;최성필
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2007년도 춘계학술대회논문집
    • /
    • pp.453-456
    • /
    • 2007
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

수차발전기 상태진단시스템을 이용한 예지보전체계 (Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator)

  • 김응태;고성호;김현;정용채;최성필
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2006년 제4회 한국유체공학학술대회 논문집
    • /
    • pp.57-60
    • /
    • 2006
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

수차발전기 상태진단시스템을 이용한 예지보전체계 사례 (Report on Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator)

  • 고성호;정용채;최성필;곽영균;한승열
    • 한국유체기계학회 논문집
    • /
    • 제13권1호
    • /
    • pp.29-34
    • /
    • 2010
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.