• Title/Summary/Keyword: Small construction projects

Search Result 174, Processing Time 0.028 seconds

The Characteristic of Wind Turbine Industry of the West-South Seashore of Leading Industry Development for Honam Economic Region (호남광역경제권의 서남해안 풍력산업 특성)

  • Cha, In-Su;Kim, Tae-Hyung;Lee, Ki-Bong
    • Proceedings of the KIPE Conference
    • /
    • 2010.07a
    • /
    • pp.101-102
    • /
    • 2010
  • This paper represents about the characteristics of wind turbine industry of the west-south seashore of Leading Industry Development for Honam Economic Region. These projects have 8 R&D and 3 non R&D project. The period of these projects is from October 2009 to April 2012. The R&D projects are composed three bright prospect products (1) the base construction of MW off-shore wind turbine components and system with Outer-rotor type PMSG, (2) the Development of 3MW wind power system with accommodation of the west-south seashore, and (3) the development of hybrid wind turbine system with wind base construction. Also, the non-R&D projects are composed three parts with above three bright prospect products. Above two projects support the companies with characteristic of low speed wind turbine system. Other project supports the companies related to wind turbine with small and medium capacity of form 3 kW to 10kW.

  • PDF

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

An Improvement Study on Direct Purchasing System of Construction Materials - Focused on the Project Management of "I" Co. - (공사용자재 직접구매제도 개선방안에 관한 연구 - I사 사업관리 중심으로 -)

  • Park, Keum-Am;Kwon, Hyeok-Cheol;Jho, Yong-chul;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.257-264
    • /
    • 2015
  • "Act on Facilitation of Purchase of Small and Medium Enterprise - Manufactured Products and Support for Development of Their Markets" was created and implemented. The act states that the materials designated by the Small and Medium Business Administration are directly purchased from the small and medium enterprises and provided to the construction companies so that the materials can be provided as GFGI (Government Furnished and Government Installed) in the case of a public construction project. This thesis is aimed to analyze the current status on the problems of each project party and understand their improvement requests so that mutually beneficial plans can be sought and improved process is presented for the continuous development of the direct construction material purchase system as well as successful construction projects. And This thesis summarized the purpose of the institutions and their change histories, and related law as well as codes for the better understanding of administrative procedures for the purchase system and the analyses as well as the improved process on the difficulties in complying with the current institutions.

Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process (재해분석을 통한 농업토목공사의 공종별 위험성 평가)

  • Yang, Young Jin;Oh, Sue Hoon;Noh, Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.

Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work - (소규모 건축공사의 BIM 정보 활용을 위한 프로세스 제안 - 철골공사 중심으로 -)

  • Kim, Jin-Kwang;Yoo, Moo-Young;Ham, Nam-Hyuk;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.41-50
    • /
    • 2018
  • The current study focused on the utilization of building information modeling (BIM) data in steel-frame structures, which help to reduce project durations because they employ prefabricated structural members that are assembled on-site. In addition, a business process model was proposed using BIM data collected during the preconstruction, structural steel fabrication, and on-site construction phases of an actual steel-frame project. The ultimate expectation is that BIM data support at each phase, as well as the increased understanding among project participants, will result in an increase in project management productivity. The results from the current study are summarized as follows: To implement a BIM capable of application to steel-frame projects and data utilization, existing theories were studied to develop the construction project steps, both generally into the preconstruction (A1), steel fabrication (A2), and on-site construction phases, (A3) and specifically into 19 BIM-applicable phases. Based on the derived BIM-applicable phases, the model elements of the BIM object were identified, and the shortcomings of existing steel-frame projects were ameliorated, resulting in an improved data flow model. Moreover, for the proposed BIM data flow to progress efficiently, the BIM specialist needs to be well-acquainted with the phase-specific three-dimensional (3D) model output, and the infrastructure to construct an error-free 3D model must be provided. Based on the actual construction example, the BIM data utilized steel-frame projects - via production reports, clash checks, two-dimensional (2D) drawings, four-dimensional (4D) simulations, and 3D scanning - to make cooperation and communication among participants easier.

Protection and Preservation of Clithon retropictus, Level II Endangered Species Declining due to Development Projects Carried out in its Habitat

  • Choi, Sang Duk;Jeon, Hong il;Myeong, No Yun;Choi, Sung Min;Lee, Cheol;An, Yun Keun
    • Korean Journal of Environmental Biology
    • /
    • v.36 no.2
    • /
    • pp.174-179
    • /
    • 2018
  • Clithon retropictus has been protected by the Ministry of Environment as an endangered species since 1998 and has been listed on the state red list of endangered species category II. It is viewed as a representative for all endangered species in the northeastern coastal waters of Korea. Most of the habitats of C. retropictus have been found to be in an unstable state because of development projects such as road construction, small stream development, irrigation for securing agricultural water, and flood prevention. These habitats are damaged by small stream maintenance projects and development, and the risk of damage is increasing and active efforts are needed in order to protect them. Although the Ministry of Environment is striving to preserve this endangered species, the habitat of C. retropictus is still facing external threats because it spreads to only a small area at high densities. Therefore, in order to protect the habitat of C. retropictus, a level II endangered species, it is urgent to make an effort to minimize habitat damage and to take measures for its protection.

Geotechnical Engineering & Tunnelling Research Division in Korea Institute of Construction Technology - Past and Present (한국건설기술연구원 지반연구실의 어제와 오늘)

  • Kim, Jin-Man;Lee, Ju-Hyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.233-238
    • /
    • 2010
  • The geotechnical engineering research group in Korea Institute of Construction Technology(KICT), which was first started as a small sub-division of the civil research group in KICT, became an independent research cluster with nearly 90 researchers including 25 doctors(Ph.Ds). Our geotechnical engineering research group has developed to be the best research center related to geotechnical engineering in Korea in terms of number of budget of projects performed annually. As a reaction to the rapid changes of domestic and international issues regarding geotechnical practices, our group established long-term plans which will lead national research projects. For the successful and efficient research and technology development, the group is subdivided by several specialty-divisions. The divisions under the geotechnical engineering research group are tunnels and underground structures, slopes and embankments, geo-environment, foundations, soil reinforcements, and constructions in extremely cold regions. Our research scopes includes planning, site investigation, design, construction, maintenance and management. The geotechnical engineering research group is continuously and successfully examining and analyzing the most recent trends of technology and is predicting and focusing on the researches of newly-developing fields; therefore, the group has been a leading research group in geotechnical engineering nationally.

  • PDF

Establishment of governance through development of LH cooperation project with local government: Focusing on Jeju Area (지방자치단체·LH 협력사업 도출을 통한 거버넌스 구축방안 : 제주특별자치도를 대상으로)

  • Lee, Mi-hong;Seong, Jang-Hwan;Song, Youngil
    • Land and Housing Review
    • /
    • v.8 no.4
    • /
    • pp.285-294
    • /
    • 2017
  • Recently, as the paradigm of regional development has been transformed into characterization, decentralization and cooperation, small and medium scale development is in the spotlight. In particular, as the transfer of planning authority to local governments accelerates, LH is in the process of seeking to transform itself into a system that is in line with local government demand. The purpose of this study is to elaborate the regional pending projects that meet the demand of the region. The Jeju Special Self-Governing Province is the area where land and housing prices have increased more than three times recently, which is the area of interest in recent years due to the various demand for development projects. Another objective is to establish a local government based on LH's system, it is aimed to derive a collaboration method with local government, province corporation and local researchers. The criteria for deriving the cooperation projects between the local government and LH are basically the ones that can be carried out by LH and future-oriented projects. The process of deriving has undergone the process of statutory planning, unscrupulous plan analysis, and consultation of experts' advisory committees. In order to derive the regional cooperation project, four criteria such as local uniqueness, future possibility, business promotion efficiency, and local cooperation project were set. Major projects of the Jeju Special Self-Governing Province are improvement of the surrounding traffic system, construction of the hinterland due to the construction of the second airport, and establishment of Cruise Port(Jeju Port, Seogwipo Port). The role of each entity in the implementation of regional cooperation projects is as follows. Local government should request subsidies for the projects in case of lack of budget support and secure them through competition with other regions. In addition, it should be responsible for the operation and management of the facility once it has been supported and completed smoothly. The Ministry of Land, Infrastructure and Transport affects each region through approval and subsidy of the development plan. After the development project is completed, it evaluates the development project through monitoring and plays a role of continuously improving the system. As a business operator, the provincial corporation will carry out small-scale projects including non-physical projects such as community participation. In the case of LH regional headquarters, the general manager of the region will establish a comprehensive business plan, secure development availability, and carry out large-scale growth promotion projects.

Improvement of Small-size Multi-housing Area Reconstruction Project Using AHP Analysis (AHP분석을 통한 가로주택정비사업의 개선방안)

  • Kim, Suk-Joon;Lee, Sang-Ho;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.79-85
    • /
    • 2019
  • The policy introduced recently in order to promote small-size reconstruction housing projects for rehabilitating downtown area consists of aged multi houses has been little practiced, as preferential provisions for such projects are more likely applicable for large projects. Several expert interviews and surveys were conducted to find efficient clauses to overcome the problems and their relative weights. As the results, it is revealed that 'relation of floor area ratio' and 'relaxation of building height limit criteria' are the most effective whereas 'purchasing and operating of residents' common facilities with public fund' is little. The study results would be a great interests for public institutions to rebuild aged housing area without destroying local communities and to provide socially disadvantaged class with rental housing at the same time.

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF