• Title/Summary/Keyword: Small Construction Site

Search Result 302, Processing Time 0.026 seconds

Study on Planning Direction of Park-School and Small Park in School (공원학교 및 소공원 계획 방향에 관한 연구)

  • Kim, Hyung Don;Yang, Hyun Oh
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.8 no.2
    • /
    • pp.22-39
    • /
    • 2009
  • The purpose of this study was to analyze the school location and site planning direction for land use planning of public land development. And this research proposed the direction of small park in school. So this research present the implication on urban planning and design for architecture, park-school complex. This study perform the relationship analysis on location of school and park. The result follows as this : 1) land use planning : Location and space of park-school must be checked in advance. Schools and parks are placed together. The park is located south of the school. 2) school site planning : Small field for dynamic activity is needed in school. The character of small park in school is relationship of educational programs. 3) management : CCTV is installed at school. Bright lights are placed in school. This result will be used in decision-making-process of land use planning, public land development construction, urban design and city policy.

  • PDF

Feasibility Assessment of Small Hydro Power Plants Using Diversion Weirs for Agricultural Purpose (농업용 보를 이용한 소수력발전소의 타당성 분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.229-234
    • /
    • 2011
  • Feasibility assessment for small hydropower plants using diversion weirs located in stream for agricultural purpose has been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the inflow caused from rainfall. And another model to predict hydrologic performance for small hydropower plants is established. Preliminary survey was performed identifying several candidate sites, and two sites were selected finally for actual site reconnaissance. During the course of site survey, generating capacity, construction and equipment cost, and payback through life time of each sites were calculated for economical feasibility analysis. The results of this study have estimated that the small hydropower plants using diversion weirs for agricultural purpose may offer better opportunities in future with increasing fuel cost and nation's energy policy.

  • PDF

Feasibility Study on the Construction of Small Hydro-Power Plants in Gumi Sewage Treatment Plant Discharge Point (구미하수처리장 방류구에서의 소수력발전 설치 및 운영에 관한 연구)

  • Nah, Dong-Hun;Lee, Seung-Hwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.2
    • /
    • pp.173-181
    • /
    • 2010
  • This study was conducted to investigate the possible installation of small hydro-power plant at the discharge point of Gumi sewage treatment plant (STP) using treated wastewater. Sufficient amount of water to transfer to electric power and the selection of proper location are two essential elements for the construction of small hydro-power facility. Preliminary analysis based on site visit and existing data in Gumi STP were made. Capacity of the small hydro-power plants and exact location were determined by geomorphological condition and flow duration characteristics. Flow duration characteristics and its duration curve were identified using monthly rainfall data in Gumi STP. Relevant facts of small hydro-power system in other STP were referred to adopt to Gumi STP situation. Flowrate of treated effluents and effective head between flow chamber and the location of hydraulic turbine in Gumi STP are found to be $3.70m^3$/sec and 3.5m respectively. Electric generation rate based on this feasibility study was estimated to be 86.3kW/h. Yearly electric generation rate was expected to be 932.4MMh. Proposed small hydro-power plant construction in Gumi STP is to be reasonable.

Compressive Strength Properties of Small Diameter Core Concrete with Coarse Aggregate Particle Distribution (굵은 골재 입도분포에 따른 소구경 코어 콘크리트의 압축강도 특성)

  • Lee, Jin-Won;Lee, Sang-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.145-146
    • /
    • 2023
  • One of the causes of recent construction site collapses was that the compressive strength of concrete was less than half of the allowable design standard strength range. In the safety diagnosis of structures, the compressive strength of concrete is a factor that determines the durability of a building. Therefore, in this study, we aim to examine the characteristics of compressive strength according to the particle size distribution of coarse aggregate among the compressive strength factors using small-diameter cores. To avoid problems when collecting cores, core specimens with diameters of 100×200, 50×100, and 25×50 (mm) were manufactured directly. As a result of measuring the compressive strength of concrete for each diameter, the larger the core diameter, the higher the compressive strength. has increased.

  • PDF

Application Technique of Geospatial Information for Pre-Environment Survey in Construction Site (건설현장 사전 환경조사를 위한 공간정보의 적용기법)

  • Yeon, Sang-Ho
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.17 no.1
    • /
    • pp.119-128
    • /
    • 2014
  • The environmental survey in advance in the construction works is very important for planning and designing as well as the service of field survey before carrying out construction. The topographical application of spatial information coupled with USN is the very economical method for the survey and research every processing stage of construction field in advance. Therefore the execution of very important role for environmental planning and fundamental designing of construction reduces the unnecessary trial and error through the environmental survey in advance. In this research the environment of existent construction field is transformed to that of digital spatial information by fusing the sensor network with wireless technique on the base of spatial position. In addition, the sink sensor cumulates the environmental data measured from each USN sensor using small wireless environmental sensors installed at the construction site and changes of various environmental data at the present constructing site are able to be monitored at 3-D topographical space in real time by using the method for transmitting the image of PC output based on TinyOS.

Enhancing Small-Scale Construction Sites Safety through a Risk-Based Safety Perception Model (소규모 건설현장의 위험성평가를 통한 안전인지 모델 연구)

  • Kim, Han-Eol;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.97-108
    • /
    • 2024
  • This research delves into the escalating concerns of accidents and fatalities in the construction industry over the recent five-year period, focusing on the development of a Safety Perception Model to augment safety measures. Given the rising percentage of elderly workers and the concurrent drop in productivity within the sector, there is a pronounced need for leveraging Fourth Industrial Revolution technologies to bolster safety protocols. The study comprises an in-depth analysis of statistical data regarding construction-related fatalities, aiming to shed light on prevailing safety challenges. Central to this investigation is the formulation of a Safety Perception Model tailored for small-scale construction projects. This model facilitates the quantification of safety risks by evaluating safety grades across construction sites. Utilizing the DWM1000 module, among an array of wireless communication technologies, the model enables the real-time tracking of worker locations and the assessment of safety levels on-site. Furthermore, the deployment of a safety management system allows for the evaluation of risk levels associated with individual workers. Aggregating these data points, the Safety Climate Index(SCLI) is calculated to depict the daily, weekly, and monthly safety climate of the site, thereby offering insights into the effectiveness of implemented safety measures and identifying areas for continuous improvement. This study is anticipated to significantly contribute to the systematic enhancement of safety and the prevention of accidents on construction sites, fostering an environment of improved productivity and strengthened safety culture through the application of the Safety Perception Model.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Introduction to Occupational Safety and Health Training Scheme for Construction Works (건설근로자 안전보건교육 이수제도 도입방안에 관한 연구)

  • Jung, Sung-Hoon;Kim, Tae-Soo;Joo, Yong-Ma;Lee, Yeon-Bog;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.9-18
    • /
    • 2011
  • Daily workers in construction sites rarely receive the benefit of systematic safety and health training as they are required to move from one construction site to another in response to the start, completion, and repetition of construction works. Also, small- to medium-sized construction sites often lack the capacity to train their workers. Therefore, as in the advanced countries, basic OSH training sheme for construction workers should be conducted in the industrial-level, rather than in individual workplace-level, to make the training more effective. By doing so, only workers with the basic safety training will be able to engage in construction works. Consequently, accidents in the construction industry will decrease, as workers themselves who are at the forefront of the construction worksites are empowered to play the central role in accident prevention activities.

Site Investigation of a Reclaimed Saline Land by the Small Loop EM Method (소형루프 전자탐사법에 의한 간척지 지반조사)

  • Kim, Ki-Ju;An, Dong-Kuk;Cho, In-Ky;Kim, Bong-Chan;Kyung, Keu-Ha;Hong, Jae-Ho
    • Geophysics and Geophysical Exploration
    • /
    • v.13 no.2
    • /
    • pp.175-180
    • /
    • 2010
  • The small loop electromagnetic (EM) method is a fast and convenient geophysical tool which can provide resistivity distribution of shallow subsurface. Especially, it can be a useful alternative of resistivity method in a very conductive environment such as a reclaimed saline land. We applied the multi-frequency small loop EM method for the site investigation of reclaimed saline land. We inverted the measured EM data using one dimensional (1D) inversion program and merged to obtain three dimensional (3D) resistivity distribution over the survey area. Finally, comparing he EM results with the drill log and measured soil resistivity sampled at 16 drill holes, we can define the site character such as thickness of landfill, salinity distribution, and etc.

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro Power Plants

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Korean Journal of Hydrosciences
    • /
    • v.3
    • /
    • pp.81-96
    • /
    • 1992
  • This study represents the methodology for feasibility analysis of small hydro power SHP plant. Cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP candidate site. The perfomance prediction model and construction cost estimation model for tunnel-type SHP plant were developed. Eight tunnel -type SHP candidate sites existing on Han-river were selected and surveyed for actual site reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrate with the lowest unit generation cost for tunel-type SHP candidate site were the flowrate concerming with between 20% and 30% of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual averageload factor, annual electricity production were estimated and discussed for eight surveyed SHP candidate sites.

  • PDF