• Title/Summary/Keyword: Sludge-Removal Power

Search Result 25, Processing Time 0.028 seconds

Analysis of the Power for a Decanter-Type Centrifuge (I) - Sludge-Removal Power - (Decanter형 원심분리기의 동력 계산 (I) - 슬러지 제거동력 -)

  • Suh, Yong-Kweon
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.27 no.7
    • /
    • pp.929-937
    • /
    • 2003
  • In general, the electric motor for driving the centrifuge of Decanter type is selected based on the power(starting power) necessary to start the bowl and the screw shaft. However the operation cost of the machine is dependent on the power needed at a steadily operating condition, including the power against the bearing friction and that for the sludge removal. In this paper, the formulation for the sludge-removal power is presented. Sample calculation for a specific design shows that the sludge-removal power is increased with the friction coefficient. It also reveals that the power is mainly dependent on the length of the screw blade rather than the beach angle. Further it is shown that the power increases in square of the rotational speed of the machine.

Analysis of the Power for a Decanter-Type Centrifuge (II) - Total Power and the Power-Transmission Mechanism - (Decanter형 원심분리기의 동력 계산 (II) - 총동력과 동력전달 기구 -)

  • Suh, Yong-Kweon;Han, Geun-Jo
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.27 no.7
    • /
    • pp.938-947
    • /
    • 2003
  • In this paper, we derived the formula for estimating the power of the electric motors needed to operate the Decanter-type centrifuge. In the derivation of the formula the sludge-removal torque is to be supplied from the formula derived in the first paper. The intricate nature of the transmission mechanism in the planetary gear trains of the sludge-removal power and torque has been clarified in this second paper. In particular we considered two-motor system, where the main motor drives the machine while the differential-speed control motor plays the role of braking in adjusting the differential speed. Sample calculation for the specific design treated in the first paper showed that the selection criterion for the main motor depends on the lower limit of the differential speed; when the lower limit is set low, it should be selected based on the steadily operating power, while it should be selected based on the starting power when the lower limit is set high. The total power required by both the main motor and the differential-speed control motor increases as the differential speed is decreased. It is suggested that the power loss in the differential-speed control motor could be minimized by attaching an electric generator to it.

Development of an Apparatus for Removing Magnetic Sludge by Permanent Magnets Set up in the Condenser of the Power Plant (영구자석을 이용한 복수기 집수정 내부 자성이물질 제거장치 개발)

  • Bae, Jun-Ho;Kim, Moon-Saeng;Hwang, Beom-Cheol;Kim, Chul
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.33 no.9
    • /
    • pp.938-948
    • /
    • 2009
  • In this paper, permanent magnets were used to remove magnetic sludge in the condenser of the power plant. To obtain the flow characteristics and magnetic information that are needed for determining a proper design of the magnetics sludge removal apparatus, numerical simulations were performed through the use of two commercial codes, ANSYS Workbench-Emag and CFX. Experiments were also performed on various kinds and sizes of magnets to obtain the magnetic information through a gauss meter. By analyzing the results of simulations and experiments, the minimum magnetic force that is able to remove the any size of the magnetic sludge in the condenser was calculated, and the design of the removal apparatus was confirmed. The test model which was confirmed by simulations and experiments was made. After testing, the test results were compared with those of numerical simulations and have good agreements.

DEVELOPMENT OF A STEAM GENERATOR LANCING SYSTEM

  • Jeong Woo-Tae;Kim Seok-Tae;Hong Sung-Yull
    • Nuclear Engineering and Technology
    • /
    • v.38 no.4
    • /
    • pp.391-398
    • /
    • 2006
  • It is recommended to clean steam generators of nuclear power plants during plant outages. Under normal operations, sludge is created and constantly accumulates in the steam generators. The constituents of this sludge are different depending on each power plant characteristics. The sludge of the Kori Unit 1 steam generator, far example, was found to be composed of 93% ferrous oxide, 3% carbon and 1% of silica oxide and nickel oxide each. The research to develop a lancing system that would remove sludge deposits from the tubesheet of a steam generator was started in 1998 by the Korea Electric Power Research Institute (KEPRI) of the Korea Electric Power Corporation (KEPCO). The first commercial domestic lancing system in Korea, the $KALANS^(R)-I$ Lancing System, was completed in 2000 for Kori Unit 1 for cleaning the tubesheet of its Westinghouse Delta-60 steam generator. Thereafter, the success of the development and site implementation of the $KALANS^(R)-I$ lancing system for YGN Units 1&2 and Ulchin Units 3&4 was also realized in 2004 for sludge removal at those sites. The upper bundle cleaning system for Westinghouse model F steam generators is now under development.

Effects of Retention Time on the Simultaneous of Odor Removal and Sludge Solubilization Using a Non-Thermal Plasma System (저온 플라즈마와 활성슬러지 복합 공정에서 체류시간 변화가 악취 저감 및 슬러지 가용화에 미치는 영향)

  • NamGung, Hyeong-Gyu;Hwang, Hyun-Jung;Song, Ji-Hyeon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.6
    • /
    • pp.815-824
    • /
    • 2011
  • In this study, a non-thermal plasma system was employed to simultaneously remove odorous compounds and organic sludge. The system consisted of two reactors; the first one was the non-thermal plasma reactor where ozone was produced by the plasma reaction and the ozone oxidized hydrogen sulfide, the model odorous compound, and then the ozone-laden gas stream was introduced to the second reactor where wasted sludge was disintegrated and solubilized by ozone oxidation. In this study, the gas retention time (GRT) and the hydraulic retention time (HRT) were changed in the two-reactor system, and the effects of GRT and HRT on reduction efficiencies of odor and sludge were determined. As the GRT increased, the ozone concentration increased resulting in an increasing efficiency of hydrogen sulfide removal. However, the overall ozone loading rate to the second sludge reactor was the same at any GRT, which resulted in an insignificant change in sludge reduction rate. When HRTs in the sludge reactor were 1, 2, 4 hours, the sludge reduction rates were approximately 30% during the four-hour operation, while the rate increased to 70% at the HRT of 6 hours. Nevertheless, at HRTs greater than 4 hours, the solubilization efficiency was not proportionally increased with increasing specific input energy, indicating that an appropriate sludge retention time needs to be applied to achieve effective solubilization efficiencies at a minimal power consumption for the non-thermal plasma reaction.

Effect of the Application of Microbubbles and/or Catalyst on the Sludge Reduction and Organic matter of Livestock Wastewater (마이크로버블과 촉매 적용에 따른 가축분뇨의 슬러지와 유기오염물질 감량 효과)

  • Jang, Jae Kyung;Kim, Min Young;Sung, Je Hoon;Chang, In Seop;Kim, Tae Young;Kim, Hyun Woo;Kang, Young Koo;Kim, Young Hwa
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.37 no.10
    • /
    • pp.558-562
    • /
    • 2015
  • This study was tested to evaluate the effect of the six different combinations of microbubble, catalyst, and air as oxidant on the sludge and organic matter reduction. When all of microbubbles and catalyst, and an oxidizing agent (under Conditions 1) such as air were used, the sludge was removed more than 99%, and TCOD and SCOD removal was 58% and 13%, respectively. This result was the highest value of six conditions. In the following order, the sludge reduction of the microbubbles with air (Condition 2) and catalyst with air (condition 4) was 95% and 93.1%, respectively. TCOD removal was found to be each 53% and 47%. When the microbubbles were used with oxidant like air, the removal of sludge and organic matter was high. All of these values were higher than that of using only microbubbles and catalyst without air. In the microbubbles and catalyst react under air supply condition, OH-radicals were generated in the reaction process. These OH-radicals in the reaction process decomposed the pollutants by the strong oxidizing power. In all conditions with air, the sludge reduction was high removal rate more than 93% and TCOD removal was over 47%.

Analysis of Chemical Cleaning for the Top-of-Tubesheet of NPP's Steam Generator (원전 증기발생기 관판 상단 화학세정 결과 분석)

  • Lee, Han-Chul;Sung, Ki-Bang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.4
    • /
    • pp.2043-2048
    • /
    • 2013
  • OPR-1000 CE Steam Generator, of which tube material is composed of Alloy-600 HTMA in nuclear power plant, secondary side is generated ODSCC(Outside Diameter Stress Corrosion Cracking) due to the accumulated sludge. ODSCC is centered around the tube sheet and is being affected depending on the height of the sludge. Chemical cleaning was carried out for a top-of-the-tube sheet(TTS) of Steam Generator in order to decrease corrosive condition of the secondary side of Steam Generator tubes and suppress the occurrence of stress corrosion cracking. The amount of sludge removal was 259.2kg. The height of the accumulated sludge was reduced from 0.71 to 0.34 inches. Corrosion rate as the maximum 2.34 mils was satisfied to within EPRI (Electric Power Research Institute) recommendation(10 mils).

Performance Estimation of SBR Aerobic Digestion Combined with Ultrasonication by Numerical Experiment (수치실험을 통한 초음파 결합형 SBR 호기성 소화의 거동 예측)

  • Kim, Sunghong;Kim, Donghan;Lee, Dongwoo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.6
    • /
    • pp.815-826
    • /
    • 2013
  • Using a developed mathematical model and calibrated kinetic constants, numerical experiments for a aerobic digestion of wastewater sludge by SBR aerobic digestion process combined with ultrasonication (USSBR) were performed in this study. It simulated well the phenomena of the decomposition of particulate organics and the release of organic nitrogen and transformation. To achieve 40 % of particulate organics removal, USSBR process requires only 6 days of SRT and 14 W/L of ultrasonic power whereas SBR aerobic digestion process requires 12 days of SRT. Based on the model simulation results, an empirical equation was presented here. This equation will be used to predict digestion efficiency for the given variables of SRT and ultrasonic power dose. USSBR aerobic digestion process can reduce the nitrogen concentration. The optimal operation strategy for the simultaneous removal of solids and soluble nitrogen in this process is estimated to 7 days of SRT with 14 W/L of ultrasonic power dose while anoxic period was 6 hours out of 24 hours of cycle time. In this condition, 40 % of particulate organics as well as 36 % of total nitrogen will be removed and the soluble nitrogen concentration of the centrate will be lower less then 40 mg/L.

Electrochemical and Sludge Dissolution Behavior During a Copper Removal Process for Chemical Cleaning on the Secondary Side of Nuclear Steam Generators (원전 증기발생기 2차측 화학세정을 위한 제동공정중의 전기화학적 거동 및 슬러지용해 거동)

  • Hur, Do-Haeng;Chung, Han-Sub;Kim, Uh-Chul;Chae, Sung-Ki;Park, Kwang-Kyoo;Kim, Jae-Pyong
    • Nuclear Engineering and Technology
    • /
    • v.24 no.2
    • /
    • pp.154-162
    • /
    • 1992
  • Two major goals for chemical cleaning on the secondary side of nuclear steam generators are to remove sludge effectively and to minimize corrosion of base metals. In this work, electrochemical and sludge dissolution behaviors have been investigated in order to find out which parameters are critical and important during a copper removal process for chemical cleaning and to evaluate safety aspects and effectiveness of two major copper removal processes developed commercially in foreign countries. Hydrogen peroxide is vert effective for the process to use EDTA, NH$_4$OH and EDA at 38$^{\circ}C$ to control the potential of copper in a potential range sood for copper sludge removal. Corrosion rates for carbon steel SA 285 Gr.C and Alloy 600 are very small during this process if it is controlled properly. However, the corrosion rate of SA 285 Gr.C will be increased greatly if its corrosion potential is maintained below -450mV. The process to use EDA and ammonium carbonate is effective at 6$0^{\circ}C$ to dissolve copper sludge if the corrosion potential of copper can be controlled above -200mV. However, it is very difficult to raise the corrosion potential of copper to this range by air blowing and stirring.

  • PDF

Effects of intermittent effluent recycling on the performance of UASB process (간헐적인 유출수 반송이 UASB 반응조 운전효율에 미치는 영향)

  • 이헌모;양병수
    • Journal of Environmental Science International
    • /
    • v.2 no.4
    • /
    • pp.317-324
    • /
    • 1993
  • Effluent recycling effect on UASB reactor performances is known as an important operational factor. In the present study, the possibility of intermittent recycle in UASB process for saving the power consumption was examined at different organic loading and various operational modes in recycle time period. The organic removal efficiencies of the reactors operated with the intermittent effluent recycle were considerably higher compared to those without the effluent recycle. In the intermittent recycle mode, the organic removal efficiencies slightly decreased as the non-recycle time period in the operational mode increased. Proper ratio of recycle and non-recycle time period in the mode seemed to be required to prevent the produced biogas from accumulation in the sludge bed, which caused dead zone in the reactor and sludge loss when the gas was escaped from the bed at the certain pressure.

  • PDF