• Title/Summary/Keyword: Slope nature restoration

Search Result 23, Processing Time 0.021 seconds

A Study on the Filed application of Environmental Friendly Porous Concrete For Retaining Wall (환경친화 옹벽용 포러스콘크리트의 현장적용성에 관한 연구Ⅱ)

  • Kim, Jeong-Hwan;Lee, Nam-Ik;Lee, Jun;Park, Seung-Bum;Jang, Young-Il;Seo, Dae-Suck
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.817-820
    • /
    • 2008
  • The river environments of many streams in korea have been deteriorate through the rapid industrialization and urbanization since the 1960s. In korea, on the other hand, much efforts on the research and project have been made for the restoration of the deteriorated streams to close-to-nature. in order to restore the deteriorated streams, therefore, it is necessary to investigate such advanced technologies and materials. In view of this requirement, various research paths are being taken focusing on coarse aggregates to make multi-functional porous concrete having continuous voids so as to improve water and air permeability, acoustic absorption, water purification and applicability to vegetation. The Purpose of this study is to investigate the method for recovery of the environment in the streams area using porous concrete retaining wall block. the multi-P.O.C block applies for test in the Jangduri-cheon have been monitored planting, stability etc. after 6 months, plant grows flourishing and reconstructed in state such as nature rivers.

  • PDF

Analysis of Kap-Chon's Water Level by the Waterside Planting (수변 식재에 따른 갑천의 수위 분석)

  • Woo, Won-Jae;Chung, Dong-Yang
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.1 no.1
    • /
    • pp.3-17
    • /
    • 1998
  • The purposes of this study is to investigate the possibility of planting trees at space land in the riverside. The space land is for the green space. Calculating the plantable space in the representation section and the flood flowing stability of the existing banks based on the hydrological and meteorological data of the Kap-Chon riverbasin located in Tae-jon, the following results are drawn. (1) The flood discharges in each flow section are $698.7m^3/s$ in section 1, $654.6m^3/s$ in section 2, and $1353.3m^3/s$ in section 3 during 100 years recurrence interval. Because the designed-flood discharges in those sections are $1719.9m^3/s$, $2119.7m^3/s$, and $1512.8m^3/s$ respectively, safety for flood flowing is sufficient in existing banks. (2) The possible clearance for planting trees is 1.80m in section 1, 3.90m in section 2, and 0.01m in section 3. Planting clearance is enough in section 1 and 2. However, planting should be planned after estimating a rise-height due to the bridge piers, because many piers under riverine-highway are now on the construction in section 2. The section 3 does not have sufficient clearance for planting trees, but the planting is possible after getting enough flow area with slope by cutting the terrace land on the river artificially heightened. (3) In case of planting a tree 70cm diameter in $1m^2$ in section 1, the water level increases by 0.60m. Planting a tree in a $48m^2$ area increases the water level by 0.90m. Considering that plantable clearance is 1.8m in section 1, it is sufficient to flow safely. But if the trees are planted so compactly from the upper stream, expected heavy resistance is expected due to caught materials on the trees. So, trees have to be planted widely in upper streams but compactedly in lower streams. (4) The river width without changing, Kap-Chon's flow channel can be snaked in accordance with the nature law the wide terrace land in the riverside. Decreased flow area due to planting trees will be compensated by the inclination of terrace land. And, it is theoretically proved that the flood discharge is safe even though the terrace land on the river is parked similar to the nature. Planting trees in the terrace land of the Kap-chon river to the extent that flood flowing is not adversely affected, we can get the enjoyable park to citizens not spending expensive cost. It also contributes to the recovery of ecosystem, which gives the natural beauty of river and shade to citizens and becomes good natural-educational places for children.

  • PDF

A Study on the Nature-friendly Management Regarding the User Pattern of Yangjae Stream (양재천의 이용특성을 고려한 환경친화적 관리방안에 관한 연구)

  • Kim Sun-Hee;Hong Suk-Hwan;Bae Jung-Nam
    • Korean Journal of Environment and Ecology
    • /
    • v.18 no.3
    • /
    • pp.306-315
    • /
    • 2004
  • Yangjae stream, stretching through Seocho-gu and Gangnam-gu, is a representative city stream with its environmentally friendly stream makeover project model, launched in 1995. The district of Gangnam-gu, the subject of this study, is under high pressure from the residents for its use as a huge residential areas close to the stream. The study has two main purposes. The first is to identify the condition and characteristic of utilization of Yangjae stream which is currently being increased in use by the stream restoration. Secondly, the study aims to suggest the environment-friendly management to accomplish arrangement of the naturally friendly stream based on the identification survey, The result from the user survey with 303 valid answer sheets show that the people from neighboring residential areas use this stream a lot doing exercising(51.8%) and taking a walk(24.4%) in their free time. Also regular use rate is high, and people are likely to use it alone(30.4%) or as a family(28.4%). With regard to the need of facility increase, even though the respondents required resting places in the shade(80.8%) most, overall, additional introduction of facilities was analyzed as unnecessary(78.8%). safety issue(22.0%) and a lack of convenience facilities(17.6%) and resting places in the shade(16.6%) are pointed as main problems while the users are generally satisfied(59.5%) with the stream. Improving walk-way and planting trees for shade on the slope were designed as a solution for these problems. For securing safety through improvement of walk-way, the scattering of pressure of current walk with building new walk using berms was presented. In order to increase safety on the walk-way(see above figure), the study proposes to build a new walk-way with berms to disperse excessive pressure. It also suggests the tree planting to provide shade in the stream and to make a provision for the planting of forest trees in the current law.