• Title/Summary/Keyword: Site-scale study

Search Result 1,151, Processing Time 0.026 seconds

A Case Study on Simplified Assessment Method for Site Selection of the Waste Treatment Facilities in Korea (폐기물 처리시설 입지선정의 효율화 방안에 관한 연구 - 여주군 폐기물 매립지 입지선정 사례를 중심으로 -)

  • Lee, Mu Choon;Koo, Ja Kon;Kim, Ki Cheol;Kwon, Yeon Jeong
    • Journal of Environmental Impact Assessment
    • /
    • v.8 no.1
    • /
    • pp.71-79
    • /
    • 1999
  • The comparative evaluation is the most effective method for site selection because the selection of waste treatment facility is to determine the optimum site out of limited candidate sites. This study adopted the ordinal scale evaluation, one of methods of comparative evaluation. The ordinal scale evaluation aims to determine the investigating items referring to the character of sites, to determine the importance factors for investigating items, and to determine the optimum site according to the quantitative evaluation. As a result of this study, the defects of the former reports on the environmental characteristics, such as obscurity of meaning and subjective statement, were reduced by the ordinal scale evaluation which is one of the quantitative evaluation methods. This ordinal scale evaluation method has some valuable advantages, such as, to be able to consider the cost-effect efficiency, to consider the objectiveness and the clearness of the reports on the environmental characteristics. Therefore the reducement of social complications about site selection of the indisposed facilities could be expected by this study.

  • PDF

Analysis of Electrical Equipment and Work Environment for Domestic Small-Scale Construction Site (국내 소규모 건설현장의 전기설비 및 작업환경 분석)

  • Kim, Doo-Hyun;Hwang, Dong-Kyu;Kim, Sung-Chul;Kang, Shin-Uk;Choi, Sang-Won
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.42-47
    • /
    • 2014
  • This paper is aimed to investigate and analyze of characteristic for electrical equipment and work environment for the small-scale site. In order to investigate and analyze electrical equipment and work environment for preventing electric shock disaster in construction sites, 50 small-scale construction sites and 12 large-scale construction sites are selected. This paper completed site investigations of low-voltage equipment and the portable electric machine and equipment in 12 large-scale construction sites and 50 small-scale construction sites. The findings were about the electric shock environment relevant to the ground-relevant equipment, the panel board, the protection tools, the sockets, the temporary wiring system, the portable and movable electric machines and equipments in small-scale construction sites. Finally, this study analyzed the domestic and foreign relevant standards and regulations and these findings can be utilized as educational data warning electric shock risk caused by electric equipment in small-scale construction site.

A Case Study on Simplified Assessment Method for Site Selection of the Waste Treatment Facilities (폐기물처리 시설 입지선정 효율화 방안을 위한 사례연구)

  • 장성호;손영일
    • Journal of environmental and Sanitary engineering
    • /
    • v.15 no.2
    • /
    • pp.85-94
    • /
    • 2000
  • The comparative evaluation is the most effective method for site selection because the selection of waste treatment facility is to determine the optimum site out of limited candidate sites. This study adopted the ordinal scale evaluation, one of methods of comparative evaluation. The ordinal scale evaluation aims to determine the investigating items referring to the character of sites, to determine the importance factors for investigating items, and to determine the optimum site according to the quantitative evaluation. This study has focussed on reflecting the opinion of residents to the maximum extent with a weight on social and economic aspects, considering the state of confrontation against each other between the autonomous government organization and local residents, which is being emerged as a social issue relating to the evaluation rating on each item of site selection of an optimum site. Therefore, rational, and clear validity investigations and proper reduction of both time and expenses in site selection as well through this a study.

  • PDF

Landscape Scale Ecosystem Assessment Modelling Using Spatial Pattern Analysis of GIS: A Case Study of Yongin, Korea (GIS 공간유형분석 모형을 이용한 경관 규모 생태계의 평가기법)

  • 손학기;김원주;박종화
    • Spatial Information Research
    • /
    • v.8 no.2
    • /
    • pp.233-241
    • /
    • 2000
  • The objective of this study were to develop landscape scale ecosystem assessment model, and apply the model for the assessment of the state and change of ecosystem of the study area, Yongin, Korea. Since natural ecosystem of the site has been deteriorated significantly during recent extensive residential development, it is essential to correctly assess ecosystem of the study site. Traditional ecosystem assessment mainly utilizing intensive field survey requires high cost, but the outcome rarely represents spatial pattern of the regional ecosystems. Ecosystem assesment of landscape scale based on landscape ecology can resolve most of the shortfalls of the traditional approach. The research method can be summarized as follows. First, extensive literature review on such topics as spatial pattern of ecosystem, ecosystem assessment of landscape scale, ecological analysis was carried out. Second, a model for the ecosystem assessment of landscape scale emphasizing spatial pattern of ecosystem was developed. This model evaluates three indicators; ecological integrity and biological diversity, watershed integrity, and landscape resilience of 11 watersheds in the study area. Finally, ecological assessment utilizing two sets of indicators, enhancement of and disturbance of ecosystem stability, was carried out. This assessment method is based on Environmental Monitoring and Assessment Program´s Landscape component(EMAP-L) of EPA(1994). The results of this study are as follows. First, the ecosystem assessment of landscape scale of the study area of Yongin, Korea, showed that escosystems of Tanchun01 and Chungmichun01 watersheds had the worst state in the study site in 1991. On the other hand, the ecosystems of Jinwechun01, Kyunganchun02, and Bokhachun01 watersheds had the most stable ecosystem in 1991. Second, ecosystems of Tanchun01, Shingal reservoir, and Kyunganchun01 watersheds were evaluated to be the worst state in the study site in 1996. And, ecosystems of Jinwechun01 and Gosam reservoir watersheds had the most stable ecosystem. Third, ecosystem of Tanchun01 watershed which incudes Suji residential development project site changed the most drastically between 1991 and 1996. The ecosystem of the watershed the most drastically deteriorated due to it´s proximity to Seoul and Bundang new town.

  • PDF

Computer Vision-based Continuous Large-scale Site Monitoring System through Edge Computing and Small-Object Detection

  • Kim, Yeonjoo;Kim, Siyeon;Hwang, Sungjoo;Hong, Seok Hwan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1243-1244
    • /
    • 2022
  • In recent years, the growing interest in off-site construction has led to factories scaling up their manufacturing and production processes in the construction sector. Consequently, continuous large-scale site monitoring in low-variability environments, such as prefabricated components production plants (precast concrete production), has gained increasing importance. Although many studies on computer vision-based site monitoring have been conducted, challenges for deploying this technology for large-scale field applications still remain. One of the issues is collecting and transmitting vast amounts of video data. Continuous site monitoring systems are based on real-time video data collection and analysis, which requires excessive computational resources and network traffic. In addition, it is difficult to integrate various object information with different sizes and scales into a single scene. Various sizes and types of objects (e.g., workers, heavy equipment, and materials) exist in a plant production environment, and these objects should be detected simultaneously for effective site monitoring. However, with the existing object detection algorithms, it is difficult to simultaneously detect objects with significant differences in size because collecting and training massive amounts of object image data with various scales is necessary. This study thus developed a large-scale site monitoring system using edge computing and a small-object detection system to solve these problems. Edge computing is a distributed information technology architecture wherein the image or video data is processed near the originating source, not on a centralized server or cloud. By inferring information from the AI computing module equipped with CCTVs and communicating only the processed information with the server, it is possible to reduce excessive network traffic. Small-object detection is an innovative method to detect different-sized objects by cropping the raw image and setting the appropriate number of rows and columns for image splitting based on the target object size. This enables the detection of small objects from cropped and magnified images. The detected small objects can then be expressed in the original image. In the inference process, this study used the YOLO-v5 algorithm, known for its fast processing speed and widely used for real-time object detection. This method could effectively detect large and even small objects that were difficult to detect with the existing object detection algorithms. When the large-scale site monitoring system was tested, it performed well in detecting small objects, such as workers in a large-scale view of construction sites, which were inaccurately detected by the existing algorithms. Our next goal is to incorporate various safety monitoring and risk analysis algorithms into this system, such as collision risk estimation, based on the time-to-collision concept, enabling the optimization of safety routes by accumulating workers' paths and inferring the risky areas based on workers' trajectory patterns. Through such developments, this continuous large-scale site monitoring system can guide a construction plant's safety management system more effectively.

  • PDF

A Study of Assessment Method for Site Feasibility of Municipal Solid Waste Incineration (생활폐기물소각장의 입지타당성 평가기법)

  • Lee, Mu-Choon
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.2
    • /
    • pp.123-135
    • /
    • 1997
  • The solid waste incineration facilities which cause environmental pollution. And those are some kind of loathing facilities for residents who do not want it. This problem could be solved by location feasibility study. The purpose of location feasibility study was to determine one site out of three candidate sites. This study which was done by the law, environmental and economic factor was considered for optimum site selection. Comparative evaluation among the candidate sites was done by ordinal scale and thus the optimum site was selected.

  • PDF

Management Scheme According to Characteristics of PM-10 Occurred from Large Scale Development Site (대규모 단지조성 미세먼지 관리 방안)

  • Kwon, Woo-Taeg;Lee, Woo-Sik;Hong, Sang-Pyo
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.1
    • /
    • pp.79-87
    • /
    • 2013
  • The purpose of this study is to establish PM-10 management manual for developing large scale sites by assessing the status of PM-10 reduction at ongoing large scale development sites. After analyzing the meteorological conditions and air quality characteristics of Sihwa MTV development site, ISCST3 (Industrial Source Complex Short Term Model 3) was implemented to predict PM-10 generation. The outcomes of ISCST3 modelling were utilized for verification of site survey data. As a result of applying air pollution modeling, the diffusion rate of PM-10 decreases according as the wind speed decreases. And the emission rate of PM-10 increase is linear to the concentration of PM-10. The reduction target of PM-10 can be derived quantitatively from the difference between the forecasted emission rate and the permissible emission limit of PM-10. The assessment of PM-10 characteristics which is deduced from ISCST3 and site survey can be practically applied to accomplish environmentally acceptable air quality manual for large scale development sites.

The Variations of Design Parameters for Small Scale Hydro Power Plant with Rainfall Condition (강우상태에 의한 소수력발전소 설계변수의 변화)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.138-141
    • /
    • 2008
  • The effects of design parameters for small scale hydro power(SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on Weibull distribution show that the capacity and load factor of SSHP site had large difference between the variation of shape and scale parameter. Especially, the hydrologic performance of SSHP site due to variation of shape parameter varied more sensitive than the case of variation of scale parameter. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

  • PDF

The Variations of Performance Parameters for Small Scale Hydro Power Plant with Rainfall Condition (강우상태에 의한 소수력발전소 성능변수의 변화)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • New & Renewable Energy
    • /
    • v.4 no.3
    • /
    • pp.15-22
    • /
    • 2008
  • The effects of design parameters for small scale hydro power (SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on Weibull distribution show that the capacity and load factor of SSHP site had large difference between the variation of shape and scale parameter. Especially, the hydrologic performance of SSHP site due to variation of shape parameter varied more sensitive than the case of variation of scale parameter. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

  • PDF

The Effects of Design Parameters for Small Scale Hydro Power Plant with Rainfall Condation (강우상태에 의한 소수력발전소 설계인자의 영향)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.1
    • /
    • pp.43-49
    • /
    • 2008
  • The effects of design parameters for small scale hydro power(SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on Weibull distribution show that the capacity and load factor of SSHP site had large difference between the variation of shape and scale parameter. Especially, the hydrologic performance of SSHP site due to variation of shape parameter varied more sensitive than the case of variation of scale parameter. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.