• Title/Summary/Keyword: Site assessment

Search Result 1,752, Processing Time 0.024 seconds

Suggestions for Increasing Utilization of KORA for Supporting the Off-site Risk Assessment System (화학사고 장외영향평가 지원 프로그램(KORA)의 활용도 증대를 위한 제언)

  • Kim, Jungkon;Ryu, Jisung;Ryu, Taekwon;Kwak, Sollim;Lim, Hyeongjun;Choi, Woosoo;Jung, Jinhee;Lee, Jieun;Lim, Dongyeon;Yoon, Junheon
    • Journal of Environmental Health Sciences
    • /
    • v.44 no.2
    • /
    • pp.124-132
    • /
    • 2018
  • Objectives: All enterprises intending to install and operate hazardous chemical handling facilities should prepare an off-site risk assessment (ORA) report that evaluates the impact of potential chemical accidents on the surrounding environment and population. This study was conducted to introduce the process of development and the functioning of the Korea Off-site Risk Assessment support tool (KORA) developed by the National Institute of Chemical Safety and to suggest manners to increase its utilization. Additionally, this article provided an overview of KORA. Methods: In order to identify problems with and refinements for KORA, the required items for each phase of KORA were derived by analyzing the Chemical Control Act and related administrative regulations. Results: The functions of KORA made receptor-considered assessment of chemical accidents possible, but several limitations were found in particular phases, such as the analysis of impact range, consideration of sensitive receptors, and assessment of environmental receptors. Conclusion: In this study, we suggested manners to increase the utilization of KORA. It is anticipated that the further research suggested in the study could contribute to the stabilization of the KORA system.

Analysis of Wind Resource on Maldo Island of Kokunsangun-do, Saemangeum (새만금 고군산군도 말도 유역에 대한 바람에너지 분석)

  • Kang, Sangkyun;You, Sungho;Lee, Jang-ho;Pak, Sungsine;Kim, Hyeong-Joo
    • Journal of Wind Energy
    • /
    • v.9 no.4
    • /
    • pp.65-71
    • /
    • 2018
  • To establish an offshore wind turbine test site, a wind resource assessment of the candidate site is required as a preliminary procedure. The wind resource assessment must be performed with at least one year of wind data. If the assessment is performed with short-term wind data, the results cannot validate the wind conditions of the candidate site. This study performs wind resource assessment of Kokunsangun-do to investigate the wind conditions of the candidate site. The wind data is measured by the Automatic Weather System (AWS) of the Korea Meteorological Administration, located at Maldo. The data is for five years, measured from 2013 to 2017. Measured wind data is statistically processed with a 10-minute average scheme to find out the dominant wind direction and wind power density, with yearly wind speed distribution (Weibull-based). This study contributes to build a database of wind energy resources around Maldo. Also, the results of this study could be used for the establishment of an offshore wind turbine test site.

Analysis of the technical status of multiunit risk assessment in nuclear power plants

  • Seong, Changkyung;Heo, Gyunyoung;Baek, Sejin;Yoon, Ji Woong;Kim, Man Cheol
    • Nuclear Engineering and Technology
    • /
    • v.50 no.3
    • /
    • pp.319-326
    • /
    • 2018
  • Since the Fukushima Daiichi nuclear disaster, concern and worry about multiunit accidents have been increasing. Korea has a higher urgency to evaluate its site risk because its number of nuclear power plants (NPPs) and population density are higher than those in other countries. Since the 1980s, technical documents have been published on multiunit probabilistic safety assessment (PSA), but the Fukushima accident accelerated research on multiunit PSA. It is therefore necessary to summarize the present situation and draw implications for further research. This article reviews journal and conference papers on multiunit or site risk evaluation published between 2011 and 2016. The contents of the reviewed literature are classified as research status, initiators, and methodologies representing dependencies, and the insights and conclusions are consolidated. As of 2017, the regulatory authority and nuclear power utility have launched a full-scale project to assess multiunit risk in Korea. This article provides comprehensive reference materials on the necessary enabling technology for subsequent studies of multiunit or site risk assessment.

DEVELOPMENT OF AN INTEGRATED RISK ASSESSMENT FRAMEWORK FOR INTERNAL/EXTERNAL EVENTS AND ALL POWER MODES

  • Yang, Joon-Eon
    • Nuclear Engineering and Technology
    • /
    • v.44 no.5
    • /
    • pp.459-470
    • /
    • 2012
  • From the PSA point of view, the Fukushima accident of Japan in 2011 reveals some issues to be re-considered and/or improved in the PSA such as the limited scope of the PSA, site risk, etc. KAERI (Korea Atomic Energy Research Institute) has performed researches on the development of an integrated risk assessment framework related to some issues arisen after the Fukushima accident. This framework can cover the internal PSA model and external PSA models (fire, flooding, and seismic PSA models) in the full power and the low power-shutdown modes. This framework also integrates level 1, 2 and 3 PSA to quantify the risk of nuclear facilities more efficiently and consistently. We expect that this framework will be helpful to resolve the issue regarding the limited scope of PSA and to reduce some inconsistencies that might exist between (1) the internal and external PSA, and (2) full power mode PSA and low power-shutdown PSA models. In addition, KAERI is starting researches related to the extreme external events, the risk assessment of spent fuel pool, and the site risk. These emerging issues will be incorporated into the integrated risk assessment framework. In this paper the integrated risk assessment framework and the research activities on the emerging issues are outlined.

Study about the Applicable Plan of GIS on Range of Magnetic Field Emitted from 60 Hz Powerline (60Hz 고압 송전선로의 자기장 발생범위에 대한 GIS 적용 방안에 대한 연구)

  • Hong, Seung Cheol;Choi, Seong Ho;Kim, Yoon Shin;Park, Jae Young
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.4
    • /
    • pp.271-277
    • /
    • 2006
  • In this study, we investigated the applicable plan of GIS on the environmental impact assessment of 60 Hz Powerline. So we assessed distance data based on calculations by use of 2D and 3D Geographical information systems(GIS) and distance data based on measurements on 1: 5000 maps accord with on site distance measurements to use input data for calculating magnetic field. One hundred eight of the on site measured addresses were selected from residences. The data were achieved by measuring the distance between residence and power line on maps with scales of 1: 5000. The digital map was obtained from National Geographic Information Institute with scales of 1: 5000, and we made 2D and 3D map. Correlation analyses were performed for statistical analyses. For the 3D GIS versus on site comparison of different exposure categories, 70 of 108 measurements were assigned to the correct category. Similarly for 2D GIS versus on site comparison, 71 of 108 were correctly categorized. When comparing map measurement with on site measurement, 62 of 108 were correctly categorized. When the correlation analysis was performed, best correlation was found between 3D GIS and on site measurements with r = 0.84947 (p<0.0001). The correlation between map and on site measurement yielded an r of 0.76517 (p<0.0001). Since the GIS measurements and map measurement were made from the center point in the building and the on site measurements had to be made from the closest wall on the building, this might introduce and additional error in urban areas. The difference between 2D and 3D calculations were resulted from the height of buildings.

Radiological Dose Assessment Due to the Operation of Nuclear Facilities at KAERI Nuclear Site

  • Han, M.H.;Kim, E.H.;Hwang, W.T;Yeom, J.M.;Han, J.T.;Lee, Y.B.;Han, W.J.
    • Journal of Radiation Protection and Research
    • /
    • v.28 no.3
    • /
    • pp.247-254
    • /
    • 2003
  • To prevent the potential health detriment to the public from radioactive effluents, radiological dose assessments due to the operation of nuclear facilities located at Korea Atomic Energy Research Institute (KAERI) site has been performed semiannually in compliance with the Minister of Science and Technology (MOST)'s Notice in Korea. Radiological dose assessment based on the new recommendation of the International Committee on Radiation Protection (ICRP-60) has been conducted since 1998. In this manuscript, a serial activities at KAERI site to meet the regulatory standards for routine releases of radioactive effluents are introduced and discussed including technical approaches. It is clear that each nuclear facility has been operated in compliance with regulatory standards. Furthermore, it is identified that the radiation induced health effects for residents around the site are neglectable.

Environmental Impact and Allowable Density Using the Rural Residential Density Matrix (주거밀도모형을 이용한 환경영향분석과 수용능력 산출)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.151-160
    • /
    • 2003
  • Analysis of carrying capacity and site suitability by the systematic application of environmental information an provide a basis for implementing environmentally sensitive and sustainable resource development policies. Based on the availability of public services and environmental and site-specific constraints, a Rural Residential Density Matrix was applied in Santa Cruz County, California, USA to assess the development potential of rural land parcels since 1980. In one case, the Matrix was applied to calculate the allowable development density on a site in Lompico planned for use as a Buddhist retreat center. These calculations revealed higher environmental sensitivity and lower carrying capacity than projected in the proposed plan. Under the constraints of the county's minimum acreage policies and insufficient developable land, the developer cancelled the proposed plan. This example suggests that application of the Matrix at the concept development stage would increase the effectiveness of the prior environmental review and environmental impact assessment (EIA) system in Korea.

Analysis of Damage Range and Impact of On-Site Hydrogen Fueling Station Using Quantitative Risk Assessment Program (Hy-KoRAM) (정량적 위험성평가 프로그램(Hy-KoRAM)을 이용한 제조식 수소충전소 피해범위 및 영향 분석)

  • KIM, HYELIM;KANG, SEUNGKYU
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.31 no.5
    • /
    • pp.459-466
    • /
    • 2020
  • As the hydrogen industry grows, expansion of infrastructure for hydrogen supply is required, but the safety of hydrogen facilities is concerned due to the recent accidents at the Gangneung hydrogen tank and the Norwegian hydrogen fueling station. In this study, the damage range and impact analysis on the on-site hydrogen fueling station was conducted using Hy-KoRAM. This is a domestically developed program that adds functions based on HyRAM. Through this risk assessment, it was evaluated whether the on-site hydrogen fueling station meets international standards and suggested ways to improve safety.

A Rapid Dose Assessment and Display System Applicable to PWR Accident (선량평가 및 Display시스템)

  • Moon, Kwang-Nam;Yook, Chong-Chul
    • Journal of Radiation Protection and Research
    • /
    • v.13 no.2
    • /
    • pp.67-77
    • /
    • 1988
  • The necessity of developing a rapid dose assessment system has been emphasized for an effective emergency response of mitigation of off-site radiological consequences. A microcomputer program based on a rapid dose assessment model of the off-site radiological consequences is developed for various accdident sinarios for the Nuclear Power Plants in Korea. This model, which is consists of the user answering-question input format as a menu driven method and the output format of table and graphic types, is helpful to decision-making on Emergency Preparedness by being more rapidly able to implement the off-site dose assessment and to interpret the result.

  • PDF

INFLUENCE FACTOR-BASED RISK ASSESSMENT METHODOLOGY FOR CONSTRUCITON

  • Hyunsoo Kim;Hyunsoo Lee;Moonseo Park;Kwang-pyo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1231-1236
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Therefore, safety management begins with measuring the magnitude of risk involved in a project. This study proposes a methodology for risk assessment of major trades at a particular construction site. To assess risk, this methodology integrates hazard severity and frequency, and their magnitude is calculated based on actual work-site hazards. This methodology also considers the influence factors that affect the frequency of work-related hazards. To select the appropriate influence factors, a two step approach is deployed. First, the predominant factors are identified through a literature review. Second, a selective process filters out the influence factors that are difficult to analyze quantitatively, and these extracted factors are weighted using expert surveys. Finally, the factors are combined and a quantitative risk assessment methodology is proposed.

  • PDF