Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

Study of the Metropolitan Rapid Transport System to Minimize Sidetrack Construction (대피선 최소화를 고려한 광역철도 급행화 방안 연구)

  • Kim, Moo Sun;Kim, Jungtai;Kim, Taesik;Park, Sung Soo;Hong, Jae Sung;Cho, Yong Hyeon;Min, Jai Hong
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.5
    • /
    • pp.402-409
    • /
    • 2013
  • In metropolitan railway systems, the average commuting time keeps increasing as the scheduled speed increases, and this leads to a decline of rail service usage and competitiveness. Therefore, effective express operation for urban trains is required to improve the scheduled speed. In this study, based on the obtainable time shortening efficiency and economic viability, several express operations are suggested for urban railways and these suggestions are compared by considering high performance trains with acceleration/deceleration and maximum speed improvement. As a result, the optimum express system, which can minimize the cost for sidetrack construction, is suggested.