• Title/Summary/Keyword: Side tunnel

Search Result 335, Processing Time 0.025 seconds

Clinical study on the Patients with Carpal tunnel syndrome (수근관 증후군에 대한 임상적 고찰)

  • Kim, Il-du;Oh, Hee-hong;Byun, Jae-young;Moon, Hyung-cheol;Koh, Kang-hoon;Park, So-young;Chang, Byoung-sun
    • Journal of Acupuncture Research
    • /
    • v.19 no.6
    • /
    • pp.61-66
    • /
    • 2002
  • Objective : Carpal tunnel syndrome has gained increasing attention and acceptance as a significant cause of peripheral neuropathy, since it was first reported in 1836. The purpose of this study is to inspect the effect of oriental medical treatment on Carpal tunnel syndrome patients who is not come under surgical decompession. Methods : 20 patients who visited Won-Kwang University Hospital during the period from January 1998 to May 2000 were analysed for clinical manifestations. Results : 1. Among 20 patients, 3 were male and 17 were female. 2. The syndrome occurred on the right side in 5 patients, on the left side in 0 patients, and on both 15 patients 3. The most of causes were overwork. 4. Numbness was the most common symptom followed by night pain, paresthesis, morning stiffness, puffiness and resting pain 5. Among 20 patients, 12 were Tinel's sign positive, 16 were Phalen's test positive Conclusions : When the symptom is mild and duration is short, conservative treatment is effetive, but when neurological deficit is prominent and conservative treatment is not effective, surgical decompession is indicated. We treated 19 among 20 cases of the patients which Carpal Tunnel syndrome. We achieved effective results.

  • PDF

Web-based Monitoring System for a Railroad Tunnel by Wireless Internet (무선인터넷을 이용한 웹 기반 원격지 철도터널의 계측관리)

  • Lho, Byeong-Cheol;Kim, Jong-Woo;Kim, Jeong-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.10 no.3
    • /
    • pp.159-164
    • /
    • 2006
  • Mobile communication with wireless modem can be powerful tool in web-based structural health monitoring system in which power and communication method are crucial points. In this study, the major reasons of side cracks in tunnel lining are studied by FEM analysis. In addition, a web-based monitoring system using mobile communication with wireless modem is applied to the tunnel structure to monitor the long term behavior of the side cracks. The field application shows that CDMA is useful method for structural health monitoring system which installed long distance away.

Parallel tunnel settlement characteristics: a theoretical calculation approach and adaptation analysis

  • Liu, Xinrong;Suliman, Lojain;Zhou, Xiaohan;Abd Elmageed, Ahmed
    • Geomechanics and Engineering
    • /
    • v.28 no.3
    • /
    • pp.225-237
    • /
    • 2022
  • Settlement evaluation is important for shallow tunnels in big cities to estimate the settlement that occurs due to the excavation of twin tunnels. The majority of earlier research on analytical solutions, on the other hand, concentrated on calculating the settlement for a single tunnel. This research introduces a procedure to evaluate the settlement induced by the excavation of twin tunnels (two parallel tunnels). In this study, a series of numerical analysis were performed to validate the analytical solution results. Two geological conditions were considered to derive the settlement depending on each case. The analytical and numerical methods were compared, which involved considering many sections and conducting a parametric study; the results have good agreement. Moreover, a comparison of the 3D flat model and 2D (FEM) with the analytical solution shows that in the fill soil, the maximum settlement values were obtained by the analytical solution. In contrast, the values obtained by the analytical solution in the rock is more conservative than those in the fill. Finally, this method was shown to be appropriate for twin tunnels dug side by side by utilizing finite element analysis 3D and 2D (PLAXIS 3D and PLAXIS 2D) to verify the analytical equations. Eventually, it will be possible to use this approach to predict settlement troughs over twin tunnels.

The First Case Study of TBM Pre-Excavation Type 2-Arch Tunnel in Korea (국내 최초 TBM선굴진 2-Arch터널 설계사례 연구)

  • Hyung-Ryul Kim;Sang-Jun Jung;Jun-Ho Kang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.255-264
    • /
    • 2023
  • As the demand for urban underground space increases recently, urban tunnel planning is actively progressing. In the urban area, a underground station is planned in consideration of the living environment of residents, and 2-arch tunnel is applied for the stability of existing structures and reduction of environmental damage. However, since the depth of weak rock mass is deeply distributed in the urban area due to severe weathering, careful planning is required to secure tunnel stability. In addition, if TBM mechanical excavation is applied as the main tunnel excavation method considering the composite ground in urban area, the construction connectivity with the 2-arch tunnel of the NATM concept may be deteriorated. In this study, the design case of applying TBM pre-excavation type 2-arch tunnel for the first time in Korea was mainly described. The main considerations for the segment design of TBM pre-excavation type 2-arch tunnel were explained for side tunnels. Also, a stability analysis was conducted to verify the effectiveness and adequacy of the TBM pre-excavation type 2-arch tunnel.

Across-wind dynamic loads on L-shaped tall buildings

  • Li, Yi;Li, Qiu-Sheng
    • Wind and Structures
    • /
    • v.23 no.5
    • /
    • pp.385-403
    • /
    • 2016
  • The across-wind dynamic loads on L-shaped tall buildings with various geometric dimensions were investigated through a series of wind tunnel testing. The lift coefficients, power spectral densities and vertical correlation coefficients of the across-wind loads were analyzed and discussed in details. Taking the side ratio and terrain category as key variables, empirical formulas for estimating the across-wind dynamic loads on L-shaped tall buildings were proposed on the basis of the wind tunnel testing results. Comparisons between the predictions by the empirical formulas and the wind tunnel test results were made to verify the accuracy and applicability of the proposed formulas. Moreover, a simplified procedure to evaluate the across-wind dynamic loads on L-shaped tall buildings was derived from the proposed formulas. This study aims to provide a simple and reliable way for the estimation of across-wind dynamic loads on L-shaped tall buildings.

An Evaluation of the Mechanical Property for the Backfilling Material of the NATM Composite Lining Tunnel using the Lightweight Foamed Mortar (경량기포 모르타르를 이용한 NATM Composite 라이닝 터널 뒤채움재의 역학적 특성 평가)

  • Ma, Sang-Joon;Choi, Hee-Sup;Kim, Dong-Min;Lee, Heung-Soo;Kim, Kyung-Duk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.717-720
    • /
    • 2008
  • This paper, an evaluation of the mechanical property for the backfilling materials of the NATM Composite lining tunnel using the lightweight foamed mortar, relates to the performance of permeability, compressive strength and unit volume weight. Therefore, this study is aimed to prove the three main factor that refered to the above line for development of new tunnel method. As the result of this study, it would be confirmed that the D mix is better than other mixs a side of all tests and its relation that is for the tunnel backfilling materials.

  • PDF

Wind-Tunnel Simulation on the Wind Fence Effect (방풍망 효과에 대한 풍동 시뮬레이션)

  • Kang, Kun
    • Journal of Environmental Science International
    • /
    • v.7 no.1
    • /
    • pp.20-26
    • /
    • 1998
  • In establishing artificial fences in a certain locality, type of its area or wind blown against them from the front side is primarily considered. Researchers on fences also concentrate on upstream, wand blown against them from the front side In 90$^{\circ}$ angle. In this research, simulations were carried out on the direction of wind changed by each season, and regardless of seasonal wind, on the fences effect of wind direction on fences, throu호 an atmospheric boondary layer wind tunnel. When I compared the velocity distribution of upstream against the fences in 90$^{\circ}$ angle with that of 75$^{\circ}$, 60$^{\circ}$, and 45$^{\circ}$ respectively, the velocity distribution at downstream of the latter cases generally surpassed that of the former one.

  • PDF

Wind Tunnel Experiments for Studying Atmospheric Dispersion in the Complex Terrain I.Dispersion in a mountainous Area (복잡한 지형내 오염물질의 대기확산 풍동실험: I. 산지지형에서의 확산)

  • 경남호;김영성;손재익
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.8 no.3
    • /
    • pp.169-178
    • /
    • 1992
  • Dispersion of pollutant in a mountainous area is simulated in a wind tunnel. In the northwest side of the terrain model, the sea level is assumed. Wind from the sea initially confronts hills along the shoreline, a line of large buildings next, and finally a valley between high mountains in the south and in the east. In the northwest wind conditions, severe flow separation occurs in the lee side of hills, even beyond the building area. Pollutant from the buildings is trapped in this region and its concentration is the highest. In the west wind conditions, pollutant from the buildings flows along the hills aslant the main wind direction in this case. Since large valley is located in the downstream, pollutant tends to disperse along the valley.

  • PDF

On the Cautious blasting pattern of Weak zone of NAMSAN NO. twin Tunneling (남산1호터널 쌍굴 굴진공사 정밀발파 작업에 대한 안전도검토)

  • Huh, Ginn
    • Explosives and Blasting
    • /
    • v.8 no.4
    • /
    • pp.3-22
    • /
    • 1990
  • The $\varphi{4.5}$ meters pilot tunneling work is almost done to the $\varphi{11.3}$ meters twin tunnel of NAM SAN No1. The south side pit of 400 meters is weak zone of Rock status, so client request us to allow the cautious blasting pattern for drilling on the condition of 0.2 kine vibration allowance limited for the safety of side running tunnel. The pattern of cautious blasting carried out by 6 time divided fiving on the round drilling depth of 1.20 meters(1.10) and also applied control blasting method with line drilling due to the reduction of vibration.

  • PDF

Pretibial cyst after Arthroscopic Anterior Cruciate Ligament Reconstruction using Hamstring Autograft - A Case Report - (자가 슬괵근을 이용한 전방 십자 인대 재건술 후 발생한 전경골 낭종 - 증례 보고 -)

  • Seo, Seung-Suk;Kim, Chang-Wan;Ha, Dong-Jun;Jung, Hun-Jae
    • Journal of the Korean Arthroscopy Society
    • /
    • v.13 no.1
    • /
    • pp.53-57
    • /
    • 2009
  • The pretibial cyst is a very rare complication after anterior cruciate ligament (ACL) reconstruction. It occurs whatever kind of graft choice or kind of graft fixation method at tibial side. It have been known such as graft necrosis at tibial side, extra-articular leakage of joint fluid through tibial tunnel, foreign body reaction due to breakdown of the bioabsorbable screw and incomplete incorporation of graft to bony tunnel as the cause of pretibial cyst. We experienced one case of pretibial cyst which had undergone ACL reconstruction with autogenous hamstring graft fixed with biodegradable interference screw. We report a rare case of pretibial cyst with literature review.

  • PDF