• Title/Summary/Keyword: Side tunnel

Search Result 335, Processing Time 0.023 seconds

A Case Study on Design and Construction of Subway Tunnels Underneath Existing Buildings (건물하부 통과를 위한 터널설계 시공사례)

  • 김홍석;조성태
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1994.09a
    • /
    • pp.225-230
    • /
    • 1994
  • This paper concerns a case study on the design concept, analysis, construction methodology of a subway tunnel excavated in the soft ground beneath an existing building where the distance between the bottom of the building and the crown of the tunnel is separated by about 3 meters only. The silot tunnels are excavated in advance, and side reinforced-concrete walls are installed. Then, main tunnels are excavated with ring cut method. The steel ribs are installed and supported by the side walls made in advance. Between the steel ribs and the side walls, the screw jack is installed to apply prestressing so that settlement can be controlled at minimum. Various in-situ seasurements are made and compared with computed values obtained by numerical methods. By choosing this underpinning method with very caraful construction control, tunnelling projects could be finished successfully without having any damage to the building located very closely to the tunnel crown.

  • PDF

Estimation of Disturbed Zone Around Rock Masses with Tunnel Excavation Using PS Logging (PS검층에 의한 터널굴착에 따른 주변암반의 이완영역 평가)

  • Park, Sam Gyu;Kim, Hee Joon
    • Economic and Environmental Geology
    • /
    • v.31 no.6
    • /
    • pp.527-534
    • /
    • 1998
  • Excavation of underground openings changes stress distribution around the opening. The survey of this disturbed zone in excavation is very important to design and construct underground facilities, such as tunnel, gas and oil storage, power plant and disposal site of high- and low-level radioactive wastes. This paper presents a zoning of rock masses with tunnel excavation using PS logging. Compressional and shear wave velocities are measured in boreholes drilled in the tunnel wall, which was constructed with blasting and/or machine excavation. The disturbed zone in excavation can be estimated by comparing PS logging data with a tomographic image of compressional wave velocity and compressional and shear wave velocities of core samples. In the side wall of tunnel, the disturbed zone reaches 1.5 m and 1.0 m in thickness for blocks of blasting and machine excavations, respectively. In the roof of tunnel, however, the disturbed zone is 1.0 m and 0.75 m thick for the two blocks. These results show that the width of the disturbed zone is larger in the side wall of tunnel than in the roof, and 1.3 to 1.5 times larger for the blasting excavation than for the machine excavation.

  • PDF

Case Study about the Ground Characteristics Analysis of Tunnel Face Fault Fractured Zone (터널막장 단층파쇄대의 지반특성 분석에 대한 사례연구)

  • Min Kyoung-Nam;Lim Kwang-Su;Jang Chang-Sik;Lim Dae-Hwan
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.111-118
    • /
    • 2005
  • The area of investigation belongs to Okchon metamorphic zone and the fault fractured zone runs parallel to the tunnel direction. It causes the independent decline of tunnel face and the slackness of the tunnel surrounding base so, after all, the severe displacement has occurred within the tunnel. Accordingly, the TSP(Tunnel Seismic Prediction) survey has been performed to investigate the extent of fault fractured zone and to analize its characteristics. Also, we have analized the behavior causes by performing the tunnel face mapping and drilling investigation, and confirmed the position and scale of geological anomaly area and front fractured zone which influences tunnel excavation and supporting. Collected data analyzed ground layer condition through 3 dimensional modeling. Several variables included in the modeling were analyzed by geostastistics. The analysis of the modeling data shows that the belt of weathering by fault fractured zone is developing on the basis of the right side of tunnel and that is decreasing to the left side. The fault fractured zone was confirmed that it has strike, $N0\~5^{\circ}E$ dip NW, and it is consisted of large-scale fractured zone including several anomalies. The severe displacement in tunnel is probably caused by asymmetrical load that n generated by the crossing of discontinuity and the rock strength imbalance of tunnel's both side by fault fractured zone, and judge that need tunnel reinforcement method of grouting etc.

Landscape Design for Renovation of the Second Namsan Tunnel (남산2호터널 조형물 설계)

  • 김신원
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.2
    • /
    • pp.63-69
    • /
    • 2002
  • The Second Namsan Tunnel required renovation. The landscape design was conducted as part of the comprehensive programs for renovation. The landscape design covered site analysis, design development, a working drawing and a maintenance plan. In May of 2001, the Second Namsan Tunnel was renovated and reopened to traffic. The tunnel was recreated as a new type of tunnel with function and beauty. The entrance and retaining wall of the tunnel has public character. Users are greatly affected by the entrance and retaining walls along roads. The landscape architect had to find new materials and methods to improve the environment and to combine artwork with the entrance and walls of the tunnel. The surface of the tunnel entrance and retaining walls are artistically treated with ceramic tiles and paint. Various regional characteristics and cultural meaning are symbolically expressed. Or the tunnel entrance from the Joong-gu side, entitled "Glory of the Future", the hibiscus symbolizes the bright and glorious future of Korea. On the retaining walls, entitled "Hope", the promising Joong-gu is symbolized through image of Korean magpies, mountains, rocks, roses, winds and nature. As for the tunnel entrance from the Yongsan-gu side, entitled "Vivid Spirit", pine trees symbolize the Koreans′strong will and an enterprising spirit. On the retaining walls, entitled "Lively Motions", Yongsan-gu is symbolized through image of pigeons, mountains, rocks, roses, winds and clear skys. The entrance and retaining wall of the Second Namsan Tunnel, whose surfaces are treated with tiles and paint with artistic value, would create an atmosphere using large-scale wall paintings. In this artwork, users would perceive a unique sense of place through the symbolic images of the vertical planes of the tunnel.

Investigation on Severe Aerodynamic Load Condition about Pantograph (판토그래프 가혹공력하중에 대한 연구)

  • Hwang, Jae-Ho;Lee, Dong-Ho;Chung, Kyung-Ryul
    • Proceedings of the KSME Conference
    • /
    • 2001.06e
    • /
    • pp.361-366
    • /
    • 2001
  • The present study describes a practical estimation procedure about the pantograph under several severe aerodynamic load conditions. As the operating speed of the Korean Train Express(KTX) reaches 350km/h, structural safety at various conditions should be examined at the design stage. In the present study, a compact and reliable procedure is developed to get aerodynamic loads on each part of the pantograph regarding the typhoon condition, the train/tunnel interaction, the train/train interaction and the side wind condition. In the estimation procedure, 3-dimensional steady and unsteady CFD simulation around the high speed train facilitates assigning the external local flow condition around the pantograph. The procedure is verified using the results of the low speed wind tunnel test at JARI and applied to 7 flow conditions and 4 operation configurations.

  • PDF

Inspection for Internal Flaw and Thickness of Concrete Tunnel Lining Using Impact Echo Test (충격반향시험에 의한 콘크리트 터널 라이닝 내부결함 및 두께 조사)

  • 김영근;이용호;정한중
    • Tunnel and Underground Space
    • /
    • v.7 no.3
    • /
    • pp.230-237
    • /
    • 1997
  • As concrete structure is getting old and decrepit, its inspection and diagnosis is getting important. Therefore, it is necessary to estimate the soundness of structure using non-destructive tests for effective repairs and maintenances. But, applications of non-destructive tests in tunnel have been used restrictively, due to accessibility only from one side in tunnel lining and presence of tunnel installations. Recently, the various non-destructive techniques have been studied. Especially, ground penetrating radar(GPR) and impact echo (IE) methods have been researched for tunnel inspection. In this study, the applicability of impact echo test in tunnel lining inspection has been investigated. This paper described the tunnel inspection for lining thickness and internal flaw using impact echo tests. Model tests were carried out using impact echo test systems on two concrete models, Model I is measuring for lining thickness, Model II is detecting for internal flaw. Also, the test were applied for lining inspections in a tunnel constructed by NATM. From the results of impact echo tests, we have concluded that impact echo test is a very useful and effective technique for inspecting the concrete tunnel linings.

  • PDF

Non-Destructive Test for Tunnel Lining Using Ground Penetrating Radar (지하레이다(GPR)를 이용한 터널 라이닝 비파괴시험에 관한 연구)

  • 김영근;이용호;정한중;신상범;조철현
    • Tunnel and Underground Space
    • /
    • v.7 no.4
    • /
    • pp.274-283
    • /
    • 1997
  • It is necessary to estimate the soundness of tunnel using non-destructive tests(NDT) for effective repairs and maintenances. But, the state of tunnel lining could not be investigated using previous non-destructive techniques, due to the various types of support and accessibility only from one side in tunnel lining. Recently, the various non-destructive techniques such as ground penetrating radar(GPR) have been researched and developed for inspection of tunnel lining. In this study, the usefulness and applicability of GPR test in tunnel lining inspection has been investigated through model tests and tunnel site application. This paper described the tunnel lining inspection for lining thickness, cavity and support using GPR test. From the results of tests, we have concluded that GPR test are very useful and effective techniques to look into the interior of lining and measure the lining thickness.

  • PDF

Numerical analysis of water flow characteristics after inrushing from the tunnel floor in process of karst tunnel excavation

  • Li, S.C.;Wu, J.;Xu, Z.H.;Li, L.P.;Huang, X.;Xue, Y.G.;Wang, Z.C.
    • Geomechanics and Engineering
    • /
    • v.10 no.4
    • /
    • pp.471-526
    • /
    • 2016
  • In order to investigate water flow characteristics after inrushing in process of karst tunnel excavation, numerical simulations for five case studies of water inrush from the tunnel floor are carried out by using the FLUENT software on the background of Qiyueshan high risk karst tunnel. Firstly, the velocity-distance curves and pressure-distance curves are drawn by selecting a series of probing lines in a plane. Then, the variation characteristics of velocity and pressure are analyzed and the respective optimized escape routes are made. Finally, water flow characteristics after inrushing from the tunnel floor are discussed and summarized by comparing case studies under the conditions of different water-inrush positions and excavation situations. The results show that: (1) Tunnel constructors should first move to the tunnel side wall and then escape quickly when water inrush happens. (2) Tunnel constructors must not stay at the intersection area of the cross passage and tunnels when escaping. (3) When water inrush from floor happens in the left tunnel, if tunnel constructors meet the cross passage during escaping, they should pass through it rapidly, turn to the right tunnel and run to the entrance. (4) When water inrush from floor happens in the left tunnel, if there is not enough time to escape, tunnel constructors can run to the trolley and other equipment in the vicinity of the right tunnel working face. In addition, some rescuing equipment can be set up at the high location of the cross passage. (5) When water inrush from floor happens in the cross passage, tunnel constructors should move to the tunnel side wall quickly, turn to the tunnel without water inrush and run to the entrance. (6) When water inrush from floor happens in the cross passage, if there is not enough time to escape, tunnel constructors can run to the trolley and other equipment near by the left or the right tunnel working face. The results are of important practical significance and engineering value to ensure the safety of tunnel construction.

A Study on the Evaluation of the Daylighting Performance in the Sound Barrier Tunnel (축소모형을 이용한 방음터널의 자연채광 성능평가에 관한 연구)

  • Kim, Oim-Gon;Choi, Jeong-Min;Park, Chang-Seob;Lee, Kyung-Hee
    • Journal of the Korean Solar Energy Society
    • /
    • v.25 no.2
    • /
    • pp.35-43
    • /
    • 2005
  • This study aims to evaluate the natural lighting performance in the sound barrier tunnel. Therefore, to evaluate the daylighting performance, the combinations of 3 tunnel roof types which are flat-roof-type(type A), slope-roof-type(type B), arch-roof-type(type C) and 3 window types which are side-window-type(type 1), one-window-roof type(type 2), two-window-roof type(type 3) are evaluated by experimenting small scaled models. In this 9 cases of experiment, illuminance levels of each case are analyzed and evaluated. The conclusion of this study is that slope-roof-type(B) and arch-roof-type(C) is preferable to flat-roof-type(A) and one-window-roof-type(B) and two-window-roof-type(C) is preferable to side-window-type(A) for daylighting in the sound barrier tunnel.

Analysis on Internal Airflow of a Naturally Ventilated Greenhouse using Wind Tunnel and PIV for CFD Validation (CFD 검증을 위한 풍동 및 PIV를 이용한 자연환기식 온실 내부 공기유동 분석)

  • Ha, Jung-Soo;Lee, In-Bok;Kwon, Kyeong-Seok;Ha, Tae-Hwan
    • Journal of Bio-Environment Control
    • /
    • v.23 no.4
    • /
    • pp.391-400
    • /
    • 2014
  • The number of large scale greenhouses has recently been increasing to cope with mass consumption of agricultural product. Korean government announced a new development plan for constructing greenhouse complex in reclaimed lands for the purpose of improvement in exports and activation of domestic market of agricultural product. Wind environment in the reclaimed land is totally different from that of inland area, and it can give a strong influence on ventilation performance of naturally ventilated greenhouse facilities. In this study, internal airflow analysis of naturally ventilated greenhouse built on a reclaimed land was conducted using wind tunnel and PIV for validation research. Later, the PIV measured results will be used to improve the accuracy of 3 dimensional CFD simulation in the future. Wind profile at a reclaimed land was produced using ESDU program and it was applied to the wind tunnel. The calculated error was only 5% and 0.96 of correlation coefficient, implying that the computed profiles were designed properly. From the measured results, when external wind speed changed from $1m{\cdot}s^{-1}$ to $1.5m{\cdot}s^{-1}$, air velocities inside the greenhouse which PIV measured were also increased proportionately in case of both side vent open and side-roof vent open. Considering reduced ratio of air velocity inside the greenhouse, it was measured a minimum of 40% in case of side vent and 30% in case of side-roof vent compared with external wind speed from each vent type. From the quantitative and qualitative PIV analysis, the PIV measured results indicated that there were well ventilated and stagnant areas in the greenhouse according to external wind condition as well as ventilation design.