• Title/Summary/Keyword: Side tunnel

Search Result 335, Processing Time 0.025 seconds

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (NATM 터널의 대심도 풍화대층에서의 지반거동 및 보강방법)

  • Sung, Hwa-Don;An, Jung-Whan;Chun, Byung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1782-1788
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analysis of failure rate and vertical stress ratio show that the tunnel for which the height of the cover(H) was higher than four times the diameter, it can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods were showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than where using Ring-cut split method. In addition the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

  • PDF

An experimental study on the behavior of tunnel excavated in a jointed mass by two-stage excavation (절리 지반에서 2단계로 굴착되는 터널의 거동특성에 대한 실험적연구)

  • Park, Seung-Jun;Kim, Dong-Gab;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.4
    • /
    • pp.303-314
    • /
    • 2004
  • This study is intended to investigate the geotechnical behavior of jointed mass on tunnel excavation experimentally. Laboratory test were conducted in various conditions of distance from joint to tunnel and in-situ stress ratio ($K_0$). In case, the ground around the tunnel that has the joint angle $90^{\circ}$ generate the greatest influence in crown and far shoulder from joint. If the in-situ stress ratio is low, tangential stress of side wall that is opposite side of the joint is increased more than in crown. Otherwise in case, joint angle $45^{\circ}$, the generated compress stress is found out that left side of the tunnel of near the joint has influence on stability of the tunnel about 3 times than non-jointed rock.

  • PDF

Effect of the circle tunnel on induced force distribution around underground rectangular gallery using theoretical approach, experimental test and particle flow code simulation

  • Vahab, Sarfarazi;Reza, Bahrami;Shadman Mohammadi, Bolbanabad;Fariborz, Matinpoor
    • Structural Engineering and Mechanics
    • /
    • v.84 no.5
    • /
    • pp.633-649
    • /
    • 2022
  • In this study, the effect of circle tunnel on the force distribution around underground rectangular gallery was investigated using theoretical approach, experimental test and Particle flow code simulation (PFC). Gypsum model with dimension of 1500×1500 mm was built. Tensile strength of material was 1 MPa. Dimension of central gallery was 100 mm×200 mm and diameter of adjacent tunnel in its right side was 20 mm, 40 mm and 60 mm. Horizontal distance between tunnel wall and gallery edge were 25, 50, 75, 100 and 125 mm. using beam theory, the effect of tunnel diameter and distance between tunnel and gallery on the induced force around gallery was analyzed. In the laboratory test, the rate of loading displacement was set to 0.05 millimeter per minute. Also sensitivity analysis has been done. Using PFC2D, interaction between tunnel and gallery was simulated and its results were compared with experimental and theoretical analysis. The results show that the tensile force concentration has maximum value in center of the rectangular space. The tensile force concentration at the right side of the axisymmetric line of gallery has more than its value in the left side of the galleries axisymmetric line. The tensile force concentration was decreased by increasing the distance between tunnel and rectangular space. In whole of the configurations, the angles of micro cracks fluctuated between 75 and 105 degrees, which mean that the variations of tunnel situation have not any influence on the fracture angle.

A Study on the Development for the Airfoil of Wind Turbine Blade using Digital Wind Tunnel (디지털 풍동을 활용한 풍력 발전기 날개 단면 형상 개발에 관한 연구)

  • Kang, Deok Hun;Woo, Young-Jin;Lee, Jang Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.15 no.5
    • /
    • pp.42-47
    • /
    • 2012
  • Newly updated wing shape to apply small vertical wind turbine is tested with digital wind tunnel in this study. Digital wind tunnel is designed to reduce length of wind tunnel and also to maximize its area of test section. Same DC fans of ninety six are installed in the end side of its rectangular duct and air can be blown out to the other side to have uniform flow with same electricity power. New wing is concluded using experimental plan and analysis with 4-parameters and 3-levels, and tested with digital wind tunnel. It shows better performance in lift to drag ratio, and can applied to the wind turbine for the higher torque and lower thrust.

Study on Ground Surface settlement of a 3-Arch-shaped Tunnel (3아치터널의 지표면 침하에 관한 연구)

  • Shin Kang Ho;Park Tu Sung;Park O Sung;Kim Jae Kwon
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1007-1013
    • /
    • 2004
  • A three-arch NATM tunnel with a total length of 53.5m has been constructed for a metropolitan subway station in Daejon, Korea. The tunnel, whose crown is located 22m below the ground, crosses the old Daejon station underneath. Since the tunnel comprises a very large section (10${\times}$28 m; largest in Korea), it shows complicated mechanical behaviors, especially near portal, due to its short length relative to width. As far as its construction step is concerned, the center tunnel is excavated with pre-excavated pilot tunnel, which is a unique feature of this tunnel (first in Korea) to secure safety during construction and prevent excessive settlements. The both side tunnels are then excavated along with the center tunnel. Since significant amount of settlement was predictable from the design stage, extensive monitoring was performed during construction. During excavation of the side tunnels, unexpected large settlements up to ${\~}$140mm (estimated 41.8 mm at design stage) was measured at the center tunnel. In this paper, we study the causes of this unusually large ground settlement. We believe that the extra-wide tunnel excavation increases the stress influence zone of portal in longitudinal direction and consequently add more settlements to the existing due to excavation and consolidation.

  • PDF

A Study on the Effects of Side Jets to the Longitudinal Aerodynamics of Subsonic Missile (측방 제트가 아음속 유도탄 종방향 공력특성에 미치는 영향 연구)

  • GO, Beom Yong;HUR, Ki Hoon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.3
    • /
    • pp.393-404
    • /
    • 2017
  • Side jet effect on the aerodynamic characteristics of a missile was investigated using experimental and computational methods. A couple of side jets were injected toward outward downstream at mid point of missile body. Cold air jet was used in the wind tunnel test, and cold and hot jet were used in the computation. Wind tunnel test was carried out with jet and without jet, and calculation was performed for three cases ; no jet, cold air jet, and hot mixture gas jet. From the comparison of measured and calculated data for all cases, two points could be deduced. Firstly, side jet made static stability to be unstable by increasing body normal force near the side jet exit and by decreasing tail normal force. Secondly, hot mixture gas had more significant effect on the static stability of a missile-type body than cold air jet.

Characteristic of Wind Flow around Building Structures for Wind Resource Assessment (풍자원 평가를 위한 건축물 주변의 유동특성)

  • Cho, Kang-Pyo;Jeong, Seung-Hwan;Shin, Seung-Hwa
    • The KSFM Journal of Fluid Machinery
    • /
    • v.14 no.3
    • /
    • pp.50-58
    • /
    • 2011
  • To utilize wind resources effectively around buildings in urban area, the magnitudes of wind velocity and turbulence intensity are important, which means the need of the information about the relationship between the magnitude of wind velocity and that of fluctuating wind velocity. In the paper, wind-tunnel experiments were performed to provide the information about Characteristic of Wind flow around buildings with the spanwise distance and the side ratio of buildings as variables. For a single building with the side ratios of one and two, the average velocity ratio was 1.4 and the velocity standard deviation ratio ranged from 1.4 to 2.6 at the height of 0.02m at the corner of the windward side, in which flow separation occurred. For twin buildings with the side ratios of one and two, the velocity ratio ranged from 2 to 2.5 as the spanwise distance varied at the height of 0.02m, and the velocity standard deviation ratio varied near 1.25. For twin buildings with the side ratios of one and two, the maximum velocity ratio was 1.75 at the height of 0.6m, and the maximum velocity standard deviation ratio was 2.1. It was also found from the results of CFD analysis and wind-tunnel experiments that for twin buildings with the side ratios of one and two, the difference between the velocity ratio of CFD analysis and that of wind-tunnel experiments at streamwise distances was near 0.75.

A Study on Safety Improvement of Safety Devices at Entrance of Expressway Tunnels (터널 입구부 안전시설물 안전성 증대방안 연구)

  • Lee, Jeom-Ho;Kim, Jang-Wook;Kim, Deok-Soo;Lee, Soo-Beom
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.235-245
    • /
    • 2008
  • Since rapidly increase of tunnel with increasing of expressway, the study on safety improvement of safety device at entrance of expressway tunnels is necessary. The existence of tunnel occurs more speed reduction than an upward slope by itself, the collision accident of tunnel entrance causes heavier damage than that of general accident on the road. So, many kinds of safety devices such as poly-ethylene barrier, guard-rail are placed on the road side. But these devices affect the drivers as an obstacle. Although there are various safety devices that are placed at tunnel entrance, this study is related to following 2-cases. One is that the poly-ethylene barrier is placed and the other is that a safety devices is not placed. The reason that these two cases are selected, is that poly-ethylene barrier is usually placed at many tunnel entrances and safety devices can affect the drivers as an obstacle. This study is related to the difference of right-hand side clearance between inside tunnel and outside tunnel, too. The average difference observed car speed and VDS(vehicle detect system) speed nearby the tunnel is analysed. Through the statistical analysis of the average difference, this study suggests an alternatives on safety improvement of safety devices at entrance of expressway tunnels. It is concluded that the small difference of right-hand side clearance is desirable to drivers when a poly-ethylene barrier is placed. And when the difference of right-hand side clearance is large, no safety devices is desirable, and when the difference of right-hand side clearance is small, poly-ethylene barrier should be placed to improve safety.

  • PDF

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (대심도 풍화대층에서 NATM 터널의 지반거동 및 보강방법)

  • Chun, Byung-Sik;Song, Seung-Hoon;An, Jung-Whan
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.8
    • /
    • pp.87-95
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analyses of failure rate and vertical stress ratio show that the tunnel for which the height of the cover (H) was higher than four times the diameter, can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than that obtained by Ring-cut split method. In addition, the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

Reinforcement of Shotcrete Lining on the Side Wall of Tunnel in Enlargement of Existing ASSM Road Tunnel (측벽부 숏크리트 보강에 의한 재래식 도로터널 단면확대)

  • Kim, Donggyou;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.81-89
    • /
    • 2012
  • The existing tunnel in urban area can be enlarged because of requirement of road-widening by traffic growth. The protector with rectangular cross section can be set up in the tunnel, which will be constructed for enlargement of width, to solve traffic jam around the tunnel. It is impossible to install the rockbolt in the lower area of tunnel due to a limited space between the protector and cutting surface. The objective of this study is to suggest the method of shotcrete thickness increase instead of rockbolt installation in the side wall of tunnel for the stability of tunnel. Numerical analysis was performed to evaluate displacement at the crown of tunnel, convergence of tunnel, and stress in shotcrete lining in 3-lane and 4-lane NATM tunnels enlarged from 2-lane conventional tunnel. There were three types of analysis condition, rockbolt installation, no rockbolt installation, and increase of shotcrete thickness without rockbolt in the side wall of tunnel. There was no difference on the displacement at the crown and the convergence of upper tunnel. In the lower tunnel, the convergence in case of no rockbolt installation was larger as maximum 1.3mm than that in case of rockbolt installation. The stress in shotcrete lining in case of no rockbolt installation was larger as maximum 1.3MPa than that in case of rockbolt installation. Numerical analysis was performed to compare the behavior of shotcrete with rockbolt with that of shotcrete, which its thickness was increased, without rockbolt. The shotcrete has an increase of 20%(250mm ${\rightarrow}$ 300mm, 4-lane tunnel)~25%(200mm ${\rightarrow}$ 250mm, 3-lane tunnel) in its thickness to reduce the stress in shotcrete lining. The behavior of shotcrete lining increased the shotcrete thickness by 20%~25% was similar to that of existing shotcrete lining with rockbolt.