• Title/Summary/Keyword: Side leakage loss

Search Result 39, Processing Time 0.022 seconds

Performance Prediction and Flow Field Calculation for Airfoil Fan with Impeller Inlet Clearance

  • Kang, Shin-Hyoung;Cao, Renjing;Zhang, Yangjun
    • Journal of Mechanical Science and Technology
    • /
    • v.14 no.2
    • /
    • pp.226-235
    • /
    • 2000
  • The performance prediction of an airfoil fan using a commerical code, STAR/CD, is verified by comparing the calculated results with measured performance data and velocity fields of an airfoil fan. The effects of inlet tip clearance on performance are investigated. The calculations overestimate the pressure rise performance by about 10-25 percent. However, the performance reduction due to tip clearance is well predicted by numerical simulations. Main source of performance decrease is not only the slip factor but also impeller efficiency. The reduction in performance is 12-16 percent for 1 percent gap of the diameter. The calculated reductions in impeller efficiency and slip factor are also linearly proportional to the gap size. The span-wise distributions of phase averaged velocity and pressure at the impeller exit are strongly influenced by the radial gap size. The radial component of velocity and the flow angle increase over the passsage as the gap increases. The slip factor decreases and the loss increases with the gap size. The high velocity of leakage jet affects the impeller inlet and passage flows. With a larger clearance, the main stream moves to the impeller hub side and high loss region extends from the shroud to the hub.

  • PDF

Optimal Design of GaN-FET based High Efficiency and High Power Density Boundary Conduction Mode Active Clamp Flyback Converter (GaN-FET 기반의 고효율 및 고전력밀도 경계전류모드 능동 클램프 플라이백 컨버터 최적설계)

  • Lee, Chang-Min;Gu, Hyun-Su;Ji, Sang-Keun;Ryu, Dong-Kyun;Kang, Jeong-Il;Han, Sang-Kyoo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.24 no.4
    • /
    • pp.259-267
    • /
    • 2019
  • An active clamp flyback (ACF) converter applies a clamp circuit and circulates the energy of leakage inductance to the input side, thereby achieving a zero-voltage switching (ZVS) operation and greatly reducing switching losses. The switching losses are further reduced by applying a gallium nitride field effect transistor (GaN-FET) with excellent switching characteristics, and ZVS operation can be accomplished under light load with boundary conduction mode (BCM) operation. Optimal design is performed on the basis of loss analysis by selecting magnetization inductance based on BCM operation and a clamp capacitor for loss reduction. Therefore, the size of the reactive element can be reduced through high-frequency operation, and a high-efficiency and high-power-density converter can be achieved. This study proposes an optimal design for a high-efficiency and high-power-density BCM ACF converter based on GaN-FETs and verifies it through experimental results of a 65 W-rated prototype.

Wind induced internal pressure overshoot in buildings with opening

  • Guha, T.K.;Sharma, R.N.;Richards, P.J.
    • Wind and Structures
    • /
    • v.16 no.1
    • /
    • pp.1-23
    • /
    • 2013
  • The wind-induced transient response of internal pressure following the creation of a sudden dominant opening during the occurrence of high external pressure, in low-rise residential and industrial buildings was numerically investigated. The values of the ill-defined parameters namely the flow contraction coefficient, loss coefficient and the effective slug length were calibrated by matching the analytical response with the computational fluid dynamics predictions. The effect of a sudden i.e., "instantaneously created" windward opening in the Texas Technical University (TTU) test building envelope was studied for two different envelope flexibility-leakage combinations namely: (1) a quasi-statically flexible and non-porous envelope and (2) a quasi-statically flexible and porous envelope. The responses forced by creating the openings at different time leads/lags with respect to the occurrence of the peak external pressure showed that for cases where the openings are created in close temporal proximity to the peak pressure, the transient overshoot values of internal pressure could be higher than the peak values of internal pressure in the pre-sequent or subsequent resonant response. In addition, the influence of time taken for opening creation on the level of overshoot was also investigated for the TTU building for the two different envelope characteristics. Non-dimensional overshoot factors are presented for a variety of cavity volume-opening area combinations for (1) buildings with rigid/quasi-statically flexible non-porous envelope, and (2) buildings with rigid/quasi-statically flexible and porous envelope (representing most low rise residential and industrial buildings). While the factors appear slightly on the high side due to conservative assumptions made in the analysis, a careful consideration regarding the implication of the timing and magnitude of such overshoots during strong gusts, in relation to the steady state internal pressure response in cyclonic regions, is warranted.

High Efficiency and Low Device Stress Voltage and Current Clamping ZVS PWM Asymmetrical Half Bridge Converter

  • Han Sang Kyoo;Moon Gun-Woo;Youn Myung Joong
    • Proceedings of the KIPE Conference
    • /
    • 2004.07a
    • /
    • pp.341-345
    • /
    • 2004
  • A high efficiency and low device stress voltage and current clamping BVS PWM asymmetrical half bridge converter is proposed in this paper. To achieve the ZVS of power switches along the wide load range, the transformer leakage inductor $L_{Ikg}$ is increased. Then, to solve the problem related to ringing in the secondary rectifier caused by the resonance between $L_{Ikg}$ and rectifier junction capacitors, the proposed converter employs a voltage and current clamping cell, which helps voltages and currents of rectifier diodes to be clamped at the output voltage and output current, respectively. Therefore, no RC-snubber for rectifier diodes is needed and a high efficiency as well as low noise output voltage can be realized. In addition, since all energy stored in $L_{Ikg}$ is transferred to the output side, the circulating energy problem can be effectively solved and duty loss does net exist. The operational principle, theoretical analysis, and design considerations are presented. To confirm the operation, validity, and features of the proposed circuit, experimental results from a 425W, 385-170Vdc prototype are presented.

  • PDF

Effect of Preventive Maintenance on Performance of Air Heater in a Power Plant (계획예방정비가 발전소 공기예열기의 성능에 미치는 영향)

  • Jang, Jin-Hyung;Hong, Eun-Kee;Hwang, Kwang-Won;Yun, Rin
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.34 no.5
    • /
    • pp.465-469
    • /
    • 2010
  • Air heater used in power plant helps increase the thermal efficiency of the boiler by recovering the heat from the boiler flue gas and thus preventing the loss of useful heat. This study investigates the effect of preventive maintenance on the performance of the air heater in a power plant. Performance indexes for the air heater are calculated to observe the changes in the performance and operation status of the air heater before and after preventive maintenance. The major performance indexes considered are temperature efficiency of the flue gas side, air leakage rate, heat recovery rate, heat transmission rate, and heat capacity ratio. The performance of the air heater is evaluated before and after preventive maintenance; our results show that all the abovementioned performance indexes are improved after the maintenance.

AN EXPERIMENTAL STUDY ON THE VASCULAR CHANGES OF RAT MOLAR PERIODONTAL LIGAMENT FOLLOWING ORTHODONTIC TOOTH MOVEMENT USING VASCULAR CORROSION CASTING METHOD (백서구치의 실험적 치아이동시 치근막 혈관변화에 관한 혈관주형법을 이용한 연구)

  • Lim, Yong-Kyu;Yang, Won-Sik
    • The korean journal of orthodontics
    • /
    • v.24 no.1 s.44
    • /
    • pp.37-62
    • /
    • 1994
  • This study was undertaken to investigate the three dimensional vascular changes of periodontal ligament following orthodontic tooth movement. Experimental tooth movement was carried out in 96 Sprague-Dawley rats with the weight of 250g. They were divided into four experimental groups (each 24 rats). The left maxillary first molar was moved mesially with 25g force in group I, and with 75g force in group II. Each three animals were sacrificed after 1, 6, 12, 24 hours, and 3, 7, 14, 21 days. In group III, 25g mesial force was applied for 3 days, and in group IV, 75g mesial force was applied for 3 days. Then the appliances were removed, and each three animals were sacrificed after 1, 6, 12, 24 hours, and 3, 7, 14, 21 days from removal of appliance. The contralateral molars were used for control group. Casting media was injected via left ventricle and polymerized in warm water. After corrosion of surrounding soft tissue, three dimensional vascular changes were examined using scanning electron microscopy. The findings of this study were as follows: 1. Pressure side of group I and II showed degenerative vascular changes such as vascular compression, reduction of vasculature, leakage of casting media. But, regenerative changes were dominant after 7 days of tooth movement. Although the degenerative vascular changes were more severe in group II, which was exposed to heavy force, the timing of these changes was not different between two groups. 2. Periodontal vasculature was reestablished by the growth of new capillaries and their differentiation and union from the remaining periodontal vessels and vessels of alveolar bone marrow. Although vascular regeneration was more rapid in group I, which was exposed to light force, the vasculature was not fully normalized in both groups even after 21 days. 3. There was no remarkable changes in tension side of group I and II, but looping of capillary, new capillary growth, dilation of vessels, redirection of vessels in the direction of tensile force were occurred. 4. In pressure side of group III and IV, in which appliance was removed after 3 days of orthodontic force, bone resorption was continued even after removal of appliance. Regeneration of vasculature was initiated after 1-6 hours, and it was more rapid in group III than group IV. In both groups, the vasculature was not fully normalized even after 21 days. 5. After removal of appliance, tension side of group III and IV showed vascular compression and loss of vasculature.

  • PDF

Design and Preliminary Performance Test for 5kWt Dish Solar Collector ($5kW_t$급 접시형 태양열 집열기의 설계 및 예비 성능실험)

  • Seo, Joo-Hyun;Ma, Dae-Sung;Kim, Yong;Seo, Tae-Beom;Han, Gui-Young
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.4
    • /
    • pp.113-120
    • /
    • 2007
  • The 5kWt dish solar collector is designed and the preliminary performance test for this is carried out. The diameter of the parabolic dish is 3.2 m, and its focal length is 2 m. It consists of 10 small reflectors which have their own curvatures, and the effective reflecting area is $5.9\;m^2$, and the rim angle of the dish is $43.85^{\circ}$. The reflectivity of reflectors is 0.95, and the thermal capacity of the system is about 5 kW thermal. The aperture diameter of the cylindrical-shape receiver which is made of stainless steel is 100 mm, and the height is 210 mm. A quartz window is installed at the receiver aperture to minimize the convective heat loss and prevent air leakage. In order to increase the heat transfer area, porous materials (nickel-alloy) are inserted into the receiver. Air flows into the upper part of the receiver which is the opposite side of the aperture. After the air flows through the inside of the receiver, that goes out of the receiver through 3 exits which are located near the aperture. The volumetric flow rates of air are varied from 600 to 1200 L/min. The results show that the system efficiency and receiver efficiency increase as the volume flow rate increases.

Development of IoT-based Safety Management Method through an Analysis of Risk Factors for Industrial Valves (산업용 밸브의 위험요소 분석을 통한 IoT 기반 안전관리 방안 개발)

  • Kim, Jung-Hoon;Kim, Young-Gu
    • Journal of the Korean Institute of Gas
    • /
    • v.23 no.5
    • /
    • pp.35-43
    • /
    • 2019
  • The safety of industrial valves, which are the core parts of plant facilities, are managed by manpower and there are difficulties because of side area for inspection and limited accessibility due to the nature of facilities. The industrial valves used in plant facilities cause problems such as interrupted production; a loss of life due to leak or explosion of poisonous material and flammable gases, and difficulty in locating accident positions in the event of leakage or failure. Therefore, safety management and control systems based on IoT technology are needed. This study is about the development of risk factor prediction technique among the safety management of industrial valves through IoT- based wireless communication and the development of actuator control system. We have developed IoT-based industrial valve safety management techniques to prevent accidents caused by main risk factors by conducting an analysis of the structural characteristics of valves and an analysis of the causes of main risk factors through review of failure data and literature and an analysis of accident scenarios.

A Study on the Leakage Protection with Polypropylene Mat in Irrigation Canal (Polypropylene Mat에 의(依)한 용수로(用水路)의 누수방지(漏水防止)에 관(關)한 연구(硏究))

  • Kang, Sin-Up;Kang, Yea-Mook;Cho, Seung-Seup
    • Korean Journal of Agricultural Science
    • /
    • v.6 no.2
    • /
    • pp.166-184
    • /
    • 1979
  • In order to prevent the water loss in the irrigation canal constructed on the sandy gravel layer or on the other highly permeable ground layer, lining has been practiced. Many studies have been done so far on the lining method to prevent the water loss in the irrigation canal and recently studies on the lining with plastic film or polyethylene film were also reported. However, the plastic film or polyethylene film has low strength and is liable to break, and water loss from pin hole caused by contacting with sand or gravel is highly predicted. This study was then conducted to find proper lining and buring method in canal construction of polypropylene mat after coated with vinyl, as one way to overcome the shortcoming frequently observed when plastic or usual polyehtylene film were used. Eventhough rather longer periods of experiments are needed to attain reliable and accurate results on the variation of durability, the durability of asphalt coated area, or on the damage due to freeze after burial or exposure of polypropylene mat, the experiemental results obtained during one year of period are summarized as follows: 1. The curvature at the area between canal bottom and side slope had increased stability and saved consruction cost. The relationship among the variation of curvature, the reduction of polypropylene mat and the reduced amount of soil cutting at each side slope was presented in Fig. 7 through 9. 2. The depth of covering material to protect polypropylene mat was desired to be over 30cm, considering the water depth, side slope, canal cleaning practices, traffic, or back pressure of irrigation period. 3. In order to increase the canal stability and to prevent slope erosion, sandy soil was required, to be placed under ground, and coarse gravel should cover the surface area of canal. 4. The studies on the stability of side slope in the canal should consider the passive area on the bottom and the slope should be about 1 to 2, considering the slope stability, allowable velocity and tractive force. 5. When compared with earth lining, the lining with polypropylene mat coated with vinyl was responsible to save 28% and 37% of canal lining cost, when the soil carrying distances were 500 and 700m. respectively. 6. The water interception was almost completely attained when the polypropylene mat coated with vinyl was used for lining. But further studies were assumed to be necessary for the use of asphalt since the strength of polypropylene mat connected with asphalt will vary with duration.

  • PDF