• Title/Summary/Keyword: Shut-off device

Search Result 14, Processing Time 0.017 seconds

A Study on the Effectiveness of Gas Safety Devices for Domestic (가정용 가스안전기기의 실효성에 관한 연구)

  • Jo Young-Do;Lee Kyung-Sik;Jang Sung-Dong;Kim Ji-Yun
    • Journal of the Korean Institute of Gas
    • /
    • v.5 no.4 s.16
    • /
    • pp.62-69
    • /
    • 2001
  • Gas safety devices are very effective to prevent catastrophic gas accident in domestic. The safety devices are included in domestic gas equipment such as extinguishing safety device and adapted at pipeline such as fuse cock, shut off device with gas alarm and so forth. In spite of using those safety devices, a few hundreds of gas accident was happened annually in residential house. In this study, we analysed systematically the domestic accidents which was happened in five years using fault tree analysis(FTA) method and analysed the effectiveness of individual safety device. And also, it was suggested that the rate of accident was decreased quantitatively by increasing safety device which is adapted in domestic. By analysis of 769 gas accidents in domestic, the order of effectiveness of safety device to prevent domestic gas accident was the multi-functional gas-safe-meter(micom-meter), fuse cock, gas leak alarm and CO alarm. If the above four kind of safety device are adapted to every house, about $59\%$ of accident will be reduced and the most of catastrophic gas accident will be Prevented in domestic.

  • PDF

Mechanism Diagnosis and Avoidance Design on Transient Acoustic Vibration of Reheater Water Supply Piping in Supercritical Boiler (초임계 보일러 재열기 급수 공급배관의 과도 음향진동 진단 및 회피설계)

  • Kim, Yeon-Whan;Bae, Yong-Chae;Kim, Jae-Won;Lee, Doo-Young;Heo, Hae-Yong
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.5
    • /
    • pp.385-393
    • /
    • 2013
  • In this paper, the mechanism identification and the avoidance measures on the phenomena of transient acoustic vibration amplified at the water-supply piping system to regulate the steam temperature of the boiler reheater in 500MW class supercritical power plant are presented. The pressure pulsation waves induced by the impeller passing of two feed-water pumps with five blades are coincident with the local acoustic modes of boiler reheater water-supply piping system. There are the phenomena amplified at the peaks of 5X, 10X, 15X and 20X in spectrums of piping vibration, sound pressure, and the feed-water's pressure pulsation waves. The shut-off device is installed in the piping system for the interception of pressure pulsation waves transmitted from two feed-water pumps and the modified design change of the piping layout is applied for the acoustic resonance avoidance. The acoustic natural frequencies are separated from the harmonics of pressure pulsation waves induced by the pump impellers passing through the design change of the span length. The acoustic vibration is gone by resonance avoidance measures. As a result, more than 20 dBA reduction is achieved from 100 dBA to 80 dBA.

A Study on the Implementation and Modeling of 20kW Scale ESS Load Test Device for Emergency Generator (소방용 비상발전기의 현장부하시험을 위한 20 kW급 ESS 부하시험장치 모델링과 구현에 관한 연구)

  • Choi, Seung-Kyou;Lee, Hu-Dong;Choi, Sung-Sik;Ferreira, Marito;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.541-550
    • /
    • 2019
  • An emergency generator is key equipment for fire-fighting to supply power to fire-fighting facilities, which protect property and people in cases of fire accidents. A rated load test for emergency generators must be carried out by connecting an emergency load to the generator in accordance with related regulations. However, a no-load test has been performed for emergency generators in general since serious problems can occur when the main power is cut off, including the damage of customer devices and shut down of critical loads. Therefore, this paper proposes a load test method for an emergency generator using energy storage system (ESS) without the interruption of main power. The emergency power system was also modeled based on PSCAD/EMTDC software, and a 200-kW scale ESS load test device was implemented. The simulation and test results show that the load test method is useful and practical for an emergency power supply system.

Remote Monitoring Panel and Control System for Chemical, Biological and Radiological Facilities (화생방 방호시설을 위한 원격감시 패널 및 제어시스템)

  • Park, Hyoung-Keun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.1
    • /
    • pp.464-469
    • /
    • 2019
  • A remote monitoring panel and control system was developed to control various valves and access control chambers, including gas shutoff valves used in CBR(Chemical, Biological and Radiological) facilities. The remote monitoring panel consisted of a main panel installed in the NBC (Nuclear, Biological and Chemical) control room and auxiliary panel installed in the clean room, and the size was divided into pure control and control including CCTV. This system can be monitored and controlled remotely according to the situation where an explosion door and gas barrier door can occur during war and during normal times. This system is divided into normal mode and war mode. In particular, it periodically senses the operation status of various valves, sensors, and filters in the CBR facilities to determine if each apparatus and equipment is in normal operation, and remotely alerts situation workers when repair or replacement is necessary. Damage due to the abnormal operation of each device in the situation can be prevented. This enables control of the blower, supply and exhaust damper, emergency generator, and coolant pump according to the state of shutoff valve and positive pressure valve in the occurrence of NBC, and prevents damage caused by abrupt inflow of conventional weapons and nuclear explosions.