Han Chul-Woo;Kim Tae-Jin;Kang Dae-wook;Hyun Dong-Seok
Proceedings of the KIPE Conference
/
2002.07a
/
pp.510-514
/
2002
Power Quality and reliability are becoming important issues for critical and sensitive loads. The recent growth in the use of impactive and nonlinear loads has caused many power quality problems such as voltage flicks, harmonics and unbalances, which may cause the modem automatic devices to fail, misoperate, or shut down. This paper deals with 7-Level H-Bridge Line-Interactive Dynamic Voltage Restorer (LIDVR) system. It has the power factor near to unity under normal source voltage, can compensate the harmonic current of the load and instant interruption, and has the fast response. Currently, most of the DVR design studies are based on the assumption of the balanced three-phase system. But, actually line fault occurred $1{\phi}\;{sag}\;or\;2{\phi}$ sag. Hence, proposed new control scheme compensate asymmetry input voltage. Finally, simulation results verify the proposed 7-Level H-Bridge LIDVR system.
Chang, H.Y.;So, I.S.;Jin, T.F.;Kim, Y.S.;Yoo, Y.R.;Kang, M.S.
Corrosion Science and Technology
/
v.5
no.1
/
pp.5-14
/
2006
A lot of parts in FGD (Flue Gas Desulphurization) systems of fossil-fuel power plants show the environments in which are highly changeable and extremely acidic corrosive medium according to time and locations, e.g. in duct works, coolers and re-heaters etc.. These conditions are formed when system materials are immersed in fluid that flows on them or when exhausted gas is condensed into thin layered medium to contact materials of the system walls and roofs. The environments make troublesome corrosion and air pollution problems that are occurred from the leakage of the condensed solution. The frequent shut-down and repairing works of FGD systems also demand costs and low efficiencies of those facilities. In general, high corrosion resistant materials have been used to solve this problem. However, even the super alloys and Teflon linings sometimes have not been good enough to preventing corrosion. Further more, they are expensive and not easily repairable in short periods of operation stops. In this work, new technology that is effective, economical and easily repairable has proposed to solve the corrosion problems in FGD facilities. This technology contains cathodic protection, coatings and remote monitoring-controlling systems.
The water cooling system for VFD (Variable Frequency Drive) of a fossil fuel power plant was reported to be shut down due to a water leak at the metal connection of the heat-sink to the hoses. In order to identify the cause of the failure, the system was visually inspected, and corrosion products were analyzed with SEM equipped with EDX. The failure was observed repeatedly at the nipples of certain location, suggesting galvanic corrosion. In a U-shaped heat sink with two nipples, for inlet and outlet, only one nipple was corrosively damaged at the tip, while the other was not. Most of the corrosion products were observed at the sound nipple and in the filter, identified as $Cu(OH)_2$. Some other corrosion products, composed of mostly $Cu_2O$, were found at the corrosively attacked nipple. A fair amount of Cl was also detected on the surface of the damaged nipple. It was concluded that galvanic corrosion was occurred due to a current leakage over the whole system, and the damage was accelerated by the accumulated chlorine ions in the cooling water.
Journal of the Society of Naval Architects of Korea
/
v.33
no.1
/
pp.124-134
/
1996
In this paper the pressures and flowrate distributions in the loading/unloading piping system of LNG carrier have been investigated in the case of unsteady flow state as well as steady one. Under emergency situation the main cargo pumps are forced to fail, and the ESD(Emergency Shut Down) valves and Stop valves are closed within set-time. The surge pressures according to the variations of valve closing time have been computed to recognize the surge phenomenon due to sudden decrease of flowrate. By means of these analysis results, the most important factors on the in-pipe surge phenomenon of cargo loading/unloading piping system of LNG Carrier are the type of ESD and Stop valves, valve closing time, and the pipe arrangements.
As overhead transmission lines are exposed to the outdoor weather, lightning induced fault accounts for about 66% of faults in transmission lines. The lightning may cause the damage of power system apparatus or the shut down of electricity. Not only in order to decrease the damage of the power system itself but also to ensure the reliable power supply, an appropriate insulation design based on the long-term lightning statistics is required. Meanwhile, real time information of lightning might be more useful to quickly locate the point of lightning induced fault in the line, leading to minimization of the adverse effects derived from the fault. Korea Electric Power Corporation has been providing an on-line lightning information service, named as KLDNet, since 2006 in order to meet the need inside our company. This paper describes the development and application of the information system.
Kim, Kyoung-Rean;Kim, Seoug-Beom;Ko, Jae-Myoung;Moon, Gyoon-Young;Park, Jong-Ho
The KSFM Journal of Fluid Machinery
/
v.10
no.2
s.41
/
pp.41-45
/
2007
The shutoff unit was designed to provide rapid insertion of neutron absorbing material into the reactor core to shutdown the reactor quickly and also to withdraw the absorber slowly to avoid a log-rate trip. Four shutoff units were installed on the HANARO reactor but the half-core test facility was equipped with one shutoff unit. The reactor trip or shutdown is accomplished by four shutoff units by insertion of the shutoff rods. The shutoff rod(SOR) is actuated by a directly linked hydraulic cylinder on the reactor chimney, which is pressurized by a hydraulic pump. The rod is released to drop by gravity, when triplicate solenoid valves are de-energized to vent the cylinder. The hydraulic pump, pipe and air supply system are provided to be similar with the HANARO reactor. The shutoff rod drops for 647mm stroke within 1.13 seconds to shut down the reactor and it is slowly inserted to the full down position, 700mm, with a damping. We have conducted the drop test of the shutoff rod in order to show the performance and the structural integrity of operating system of the shutoff unit. The present paper deals with the 647mm drop time and the withdrawal time according to variation of the pool water temperature, the water level and the core flow.
Programs of energy balance, mode analysis and transient analysis for a liquid rocket engine have been introduced. The analysis methods have been verified through comparison between the present results, and the results of the other program and experimental data. An energy balance analysis is used for engine system design at the early development phase. A mode analysis is used for decision of engine operation conditions and test conditions, and studying deviation of an engine performance. A transient analysis can predict a propellant flow rate, thrust, impulse at transient phase. It is essential to establish a startup/shut down sequence. The analysis programs will be used to develop the engines of KSLV-II.
Kim, Kyung-Soo;Kwon, Oh-Eun;Kang, Gi-Hwan;Yu, Gwon-Jong;Yoon, Soon-Gil
Proceedings of the KIEE Conference
/
2011.07a
/
pp.1405-1405
/
2011
Sudden earthquake is changing national energy stratagem for future energy resource. In case Germany, current nuke power station will be shut down with several decades. Newly constructed build in Japan must have photovoltaic system as a obligations.. As a long-term sustainable energy one, PV should give confidence to customers up to more than 20 years. Today, IEC 61215 and IEC 61646 standards are representative one for ensuring performance and safety of PV module. But it is still needed to develop more realistic test method. For example, if we think about extreme condition like desert and North Pole, the temperature condition describe in test standards can have little effect on life time expectation of PV module. Installation speed of PV system is very high, but establishing test standards are very complex and not easy. So in this paper, I tried to open the long-term test method for PV module to ensure 25 year's old life time. It is just starting point of PV related long-term test methods. The specific and technical explanation will be shown in the following paper in detail.
Journal of the Korean Society for Precision Engineering
/
v.14
no.3
/
pp.156-165
/
1997
In the practical control systems, the dynamic range of actuatiors is limited(or saturated) when actuators are driven by sufficiently large signals. This gives rise to a nonlinearity as a result of actuator saturation. For example, the upper limit is imposed on productive capability by available factory space and capital equipment. Other examples of those kinds of actuator saturations are a maximum torque of the actua- ting motors and a throttle position in an aircraft speed control A saturating actuator may lead not only to a large overshoot during start-up and shut-down, but also to deterioration of the performance due to the uncertainties. That is, the speed of response is decreased and, possibly, the system output may not follow the lalrge reference inputs. The large-overshoot may be accompanied by rest wind-up(or called by integra- tor wind-up) which comes from controllers with integral action in saturation operation regions. Eventually, as the overshoot increases, the system has a limit cycle or becomes oscillatorily unstable. Due to these cir- cumstances, many studies are focused on the stability and robustness of the nonlinear systems with satu- rating actuator in the time-domain as well as in the frequency-domain.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.12
/
pp.133-140
/
2013
Cascaded H-Bridge multi-level inverters can be implemented through the series connection of single-phase modular power bridges. In recent years, multi-level inverters are becoming increasingly popular for high power applications due to its improved harmonic profile and increased power ratings. This paper presents a control method for balancing the dc-link voltage and ride-through enhancement, a modified pulse width-modulation Compensation algorithm of cascaded H-bridge multi-level inverters. During an under-voltage protection mechanism, causing the system to shut down within a few milliseconds after a power interruption in the main input sources. When a power interruption occurs finish, if the system is a large inertia restarting the load a long time is required. This paper suggests modifications in the control algorithm in order to improve the sag ride-through performance of ac inverter. The new proposed strategy recommends maintaining the DC-link voltage constant at the nominal value during a sag period, experimental results are presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.