Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

A Basis Study on Assessment Method of Influence Factors about the Shortening of the Construction Time Applying FMEA in Apartment Housing (FMEA를 활용한 공동주택 공기단축 영향요인 평가방법에 관한 기초연구)

  • Ha, Hee-Yoon;Ahn, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.383-386
    • /
    • 2007
  • Recently, The percentile of the apartment housing within the apartment construction of domestic is increasing daily. Especially the construction duration in apartment construction is an very important factor which affects project cost. Therefore the construction companies the effort to shorten construction duration. The influence factors of the construction duration are analyzed to shorten construction duration through this tendency. The shown factors are needed to assessment method efficiently. This study is to suggest a method for the assessment of influence factors about the shortening of the construction time in apartment housing based on the FMEA(Failure Mode and Effect Analysis) method.

  • PDF

Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor- (아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로-)

  • Han Choong-Hee;Bang Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.87-96
    • /
    • 2004
  • The construction duration in apartment construction is an important factor which affects project cost. Henceforth, the time shortening is essential to retrench project cost and project risk when there adopt Five-Day Workweek and introduce apartment sales after completion of construction. Therefore, the purpose of this study is to examine closely the affecting factors on the duration of framework which forms about $40\sim50\$ percent of total time in apartment construction by analyzing the schedule mechanism of typical floor and to show the reasonable time shortening methods by case study. The shown schedule mechanism and basic schedule table can utilize as a guideline in case of scheduling of framework in the existing construction method. Also, the shown time shortening methods by three case studies will guide the direction and process of time shortening while there need time shortening in many-sided projects.

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Analysis on Stripping Time of Form of High-Early-Strength Concrete Incorporating Binder and Admixture (결합재 및 혼화제를 사용한 조강 콘크리트의 거푸집 탈형 시기 분석)

  • Jun, Myoung-Hoon;Bang, Jong-Dae;Lee, Bum-Sik;Park, Seong-Sik;Park, Ji-Young;Cho, Gun-Hee
    • Land and Housing Review
    • /
    • v.4 no.2
    • /
    • pp.193-200
    • /
    • 2013
  • Construction duration in construction project is an important factor which affects project cost. Advanced countries have reduced project cost by time shortening. Even though domestic construction companies have tried to time shortening, they yet failed to find systematic method for time shortening. Typically, duration of structural framework is affected by stripping time of form. Therefore, it need to shorten the stripping time of form for time shortening of structural framework. In this study, specimens of high-early-strength concrete were manufactured with variety conditions and compressive strength was tested. This study proposed stripping time of side and slab forms using test results. The stripping time of form was shortened when using high-early-strength concrete in structural framework by the test results. The result of this study will be useful for time shortening of structural framework.

A study on effects of the prevention of rush work of construction sites on human accidents (건설 현장 강행공사 방지가 인적사고에 미치는 영향에 관한 연구)

  • Lee, Sung-Il;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.27-37
    • /
    • 2017
  • In the construction sites, rush (speedy construction) work have recently been overused because of budget reductions by reducing the construction duration after the long-term economic recession and construction business stagnation with institutional change including the instruction of the duration shortening bidding system and the introduction of the post-construction sales system by the Korea Research Institute for Human Settlements. Due to this, negligent accidents have frequently occurred by forcing manpower, equipment, finance, and material procurement and pressing ahead with impractical construction wok at night according to the reduction of construction schedules. Therefore, this paper has the necessity of this study to seek for alternatives to prevent negligent accidents by finding factors related to rush work in the reality that the importance for preventing negligent accidents is more emphasized while they have not been reduced in construction sites.

The State of Schedule Management and the Recognition of Duration Shortening (공정관리의 실태 및 공기 단축에 대한 인식정도)

  • Kim, Ja-Yeon;Kim, Eui-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.87-94
    • /
    • 2010
  • Construction projects are based on the actual field, so if the construction schedule that is established in the construction plan is delayed or extended for various reasons, construction companies are vulnerable to claims, and thus strive to complete a building within the planned timeline by shortening the construction time. Therefore, this study surveyed technicians in apartment construction in Gwangju, and studied their perceptions of the actual conditions of process control, construction time needs, goals, and methods. The results showed that the organization of the process control department and professional employees was lacking compared to other regions. The need for construction time was perceived as high, while the reduction of the construction cost was perceived as low. Regarding the reduction goal, they perceived highly the preparation for the delay of construction time and various claims, and for the reduction method, they mentioned the extension of working hours and the increase in employees. Based on the results of this study, technicians should consider that a reduction of construction time not only can make up for a delay in construction, but is also closely related to improvements in production through reduction of cost, and increased international competitiveness.

Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers (저층·고층 아파트가 혼합배치된 단지에서 공기단축이 건설사업비에 미치는 영향 분석)

  • Bang, Jong-Dae;Chun, Young-Soo;Jun, Myoung-Hoon;Kim, Sa-Rang;Lee, Do-Heun
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.415-421
    • /
    • 2012
  • In case of Korean housing complex, there became more mixed arrangement of buildings with different number of layers for a variety of urban skyline, recently. For example, around 33% of the construction sites of 'A' public corporation have gaps of more than 4 layers between high-rise buildings and low-rise ones in the same site, according to the survey. Generally, construction duration of the housing complex is estimated based on the layers of the highest building. Due to this baseline, whole construction duration could be extended so that the project cost could be increased. Therefore, framework duration of higher-rise buildings should be reduced to secure the feasibility of the project. On the other hands, these shortenings could adversely harm the feasibility in some cases because there are a wide range of combinations of the buildings with different number of layers in designing housing complex. Therefore, this study shows the results of analysis on effects of framework time shortening on the cost in housing complex project. Moreover, this could set the baseline of checking possibilities in condensing the construction duration of projects with buildings of different layers by supplying comprehensive database.