Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • 토지주택연구
    • /
    • 제2권4호
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

FMEA를 활용한 공동주택 공기단축 영향요인 평가방법에 관한 기초연구 (A Basis Study on Assessment Method of Influence Factors about the Shortening of the Construction Time Applying FMEA in Apartment Housing)

  • 하희윤;안병주;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.383-386
    • /
    • 2007
  • 최근 국내 건설공사에 있어서 공동주택이 차지하는 비율은 나날이 증가하고 있다. 건설공사에서 공기는 직접적으로 건설사업비에 영향을 미치기 때문에 매우 중요하다. 따라서 국내에서도 공기단축을 위해 많은 노력을 하고 있는 실정이다. 이러한 추세에 따라서 공기를 단축하기 위해서는 공기에 영향을 미치는 중요요인을 분석하고, 도출된 요인들을 효과적으로 평가하기 위한 방법이 필요하다. 본 연구에서는 공동주택의 공기단축에 미치는 영향요인을 평가하는 방법으로 FMEA 기법을 제안하고자 한다.

  • PDF

아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로- (Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor-)

  • 한충희;방종대
    • 한국건설관리학회논문집
    • /
    • 제5권4호
    • /
    • pp.87-96
    • /
    • 2004
  • 건설공사에서 공기는 매우 중요한 요소로 건설사업비에 미치는 영향이 크다. 선진국들은 공기단축을 통한 건설사업비 절감을 위해 노력하고 있다. 국내에서도 공기단축의 필요성을 절감함으로써 공기단축을 위해 많은 노력을 기울여 왔지만, 그 효과는 아직 미미한 것으로 나타나고 있다. 향후 주 5일 근무제가 시행되고, 후분양제가 도입될 경우, 건설사업비 절감이나 리스크 관리측면에서 공기단축은 필수불가결한 요인이 될 것이다. 공기를 효과적으로 단축하기 위해서는 공기에 영향을 미치는 중요요인과 공정 메커니즘을 명확하게 분석해야 한다. 이러한 사항들이 규명될 때 효과적인 공기단축이 가능해져 건설사업비를 줄일 수 있게 될 것이다. 이에 본 연구에서는 아파트 건설공사에서 공기의 $40\sim50\%$를 차지하는 골조공사의 기준층에 대한 공정메커니즘을 분석하여 골조공사의 공기에 영향을 미치는 요인들을 규명하고자 한다. 또한, 도출된 요인들을 효과적으로 활용할 수 있는 방법들을 사례 분석함으로써 합리적인 공기단축방안을 제시하고자 한다.

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • 제14권3호
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

결합재 및 혼화제를 사용한 조강 콘크리트의 거푸집 탈형 시기 분석 (Analysis on Stripping Time of Form of High-Early-Strength Concrete Incorporating Binder and Admixture)

  • 전명훈;방종대;이범식;박성식;박지영;조건희
    • 토지주택연구
    • /
    • 제4권2호
    • /
    • pp.193-200
    • /
    • 2013
  • 건설공사에서 공기는 매우 중요한 요소로 건설사업비에 미치는 영향이 크다. 선진국들은 공기단축을 통해 건설사업비를 줄이고 있다. 국내 건설업체들도 공기단축을 위해 많은 노력을 기울이고 있지만, 공기단축 방법을 체계적으로 제시하지 못하고 있다. 일반적으로 골조공사의 공기는 거푸집의 존치기간에 영향을 받기 때문에 공기단축을 위해서는 거푸집의 존치기간을 단축해야 한다. 본 연구에서는 거푸집의 존치기간을 단축하기 위해 다양한 조건들의 조강콘크리트를 만들어서 압축강도 실험을 실시하였다. 이를 통해 거푸집의 탈형 시기를 제안하였다. 연구결과에 의하면 골조공사에 조강콘크리트를 사용하면 거푸집의 존치기간을 상당히 단축할 수 있는 것으로 나타났다. 본 연구결과들은 골조공사의 공기단축을 도모할 때 유용하게 활용될 수 있을 것이다.

건설 현장 강행공사 방지가 인적사고에 미치는 영향에 관한 연구 (A study on effects of the prevention of rush work of construction sites on human accidents)

  • 이성일;강경식
    • 대한안전경영과학회지
    • /
    • 제19권1호
    • /
    • pp.27-37
    • /
    • 2017
  • In the construction sites, rush (speedy construction) work have recently been overused because of budget reductions by reducing the construction duration after the long-term economic recession and construction business stagnation with institutional change including the instruction of the duration shortening bidding system and the introduction of the post-construction sales system by the Korea Research Institute for Human Settlements. Due to this, negligent accidents have frequently occurred by forcing manpower, equipment, finance, and material procurement and pressing ahead with impractical construction wok at night according to the reduction of construction schedules. Therefore, this paper has the necessity of this study to seek for alternatives to prevent negligent accidents by finding factors related to rush work in the reality that the importance for preventing negligent accidents is more emphasized while they have not been reduced in construction sites.

공정관리의 실태 및 공기 단축에 대한 인식정도 (The State of Schedule Management and the Recognition of Duration Shortening)

  • 김자연;김의식
    • 한국건축시공학회지
    • /
    • 제10권5호
    • /
    • pp.87-94
    • /
    • 2010
  • 건설공사는 현장을 중심으로 이루어지고 있어 공사계획초기 수립된 공기가 공기지연요인에 의하여 지연 또는 연장이 발생하게 되면 건설사는 클레임 등의 위험부담을 안고 있어 공기단축을 통해 공사 준공일 내에 목적물을 완공한다. 이에 광주광역시 내 공동주택 현장의 기술자들을 대상으로 공정관리 실태 및 공기단축의 필요성, 목적, 방법에 관한 인식을 파악해보았고 그 결과 타 지역에 비하여 공정관리전담부서 편성이 미흡하고 전문 인력이 부족함을 알았고, 공기단축의 필요성은 높게 인식된 반면 공사비 절감과의 관계는 낮게 인식되었다. 단축목적으로는 공기연장에 대비, 각종 클레임에 대처를 높게 인식하였으며 단축방법으로는 작업시간연장 및 작업원 증가를 통해 단축하겠다고 하였다. 이에 본 연구는 기술자들로 하여금 공기단축은 단순히 공기지연을 만회하기 위한 것이 아니라 원가절감을 통한 생산성 향상 및 대외 경쟁력 확보와 밀접한 관련성이 있다고 인식되어지길 기대한다.

저층·고층 아파트가 혼합배치된 단지에서 공기단축이 건설사업비에 미치는 영향 분석 (Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers)

  • 방종대;천영수;전명훈;김사랑;이도헌
    • 토지주택연구
    • /
    • 제3권4호
    • /
    • pp.415-421
    • /
    • 2012
  • 최근 도시 미관이 중요시 되면서 동일 아파트 건설단지 내에서 저층과 고층 아파트가 혼합배치되는 경우가 많아지고 있다. A공사에서 발주한 아파트 사업지구 중 고층 동들과 저층 동들 간의 층수 차가 4층 이상인 지구가 약 33%인 것으로 조사되었다. 일반적으로 아파트 공사의 공기는 단지 내최고층 동을 기준으로 산정한다. 이로 인해 전체 사업지구의 공사기간이 길어지고, 길어진 공기는 해당사업의 사업성에 나쁜 영향을 미친다. 그러므로 동일 단지 내 저층 고층 아파트 동들이 혼합 배치된 사업지구(이하 "혼합사업지구"라 한다)의 사업성 제고를 위해 일부 고층동 아파트의 골조공기를 단축해야 할 것이다. 그러나 혼합사업지구의 다양한 유형으로 인해 어떤 경우에는 공기단축이 사업성을 더 나쁘게 만들 수 있다. 따라서 본 연구에서는 다양한 유형을 갖고 있는 혼합사업지구의 골조공기 단축 여부를 판단할 수 있는 자료제공을 위해 혼합사업지구의 일부 고층동에 대한 골조공기 단축이 건설사업비에 미치는 영향을 분석하여 그 결과를 제시하였다.