• Title/Summary/Keyword: Shortage of power capacity

Search Result 38, Processing Time 0.043 seconds

The Study on the Controller for Supplying Stably Power with a Stand-Alone Photovoltaic/Wind/Small Generator Hybrid Power Generation System (독립형 태양광, 풍력, 소형발전기 복합시스템에서 안정적인 전력공급을 위한 컨트롤러에 관한 연구)

  • Choi, Byoung-Soo;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.4
    • /
    • pp.48-56
    • /
    • 2012
  • The object of this paper is the controller for supplying stably power in a separate house in which a hybrid electrical storage system with a stand-alone photovoltaic/wind power generation system and a small generator is applied. In the photovoltaic/wind hybrid power system used in the separate house, when only the battery is used in sunless days, the capacity of the battery is become larger. In particular, as in recent days, if cloudy days are frequent due to anomaly climate, it is difficult to estimate the number of sunless days. Accordingly, it is preferable to build the electrical storage system that numbers of sunshineless days are to be controlled and a shortage amount of the power generation capacity is to be handled by a small generator system. In order to supply stably power of new renewable energy such as solar to any separate houses, it is preferable to reduce the capacity of battery by decreasing the number of sunless days when estimating the capacity of battery and to drive the small generator for compensation of the power shortage. Such system needs components including inverters for photovoltaic and wind power generation system, batteries and controllers for automatically driving the small generator, based upon the nature of the stand-alone house, and it is preferable to use the controller having a simpler and higher stability by adopting the all-in-one scheme to facilitate its maintenance.

The Study on Optimize the Battery of Stand Alone PV/Wind Hybrid System for Supplying Stably Power (독립형 태양광 풍력 복합발전 시스템에서 안정적인 전력공급을 위한 축전지 용량의 최적 산정에 관한 연구)

  • Choi, Byoung-Soo;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.9
    • /
    • pp.26-32
    • /
    • 2011
  • The object of this paper is to optimize the battery system for supplying stably power in separate house in which a PV-wind hybrid power generation system is applied. In a power system to be used in a stand alone, it is very important to build optimize the electrical storage system and to utilize it for supplying stably output voltage when there is a shortage of the power generation capacity or there is no sunshine, or when power is to be supplied with a load. This paper provides an optimized method to evaluate capacity of battery by analyzing advantages and disadvantages of the existing battery evaluating method being used in each company for supplying stably power in separate house utilizing the new renewable energy such as a light of the sun.

A Restoration Algorithm using Moving the tie Switch in Distribution System in case of Fault Occur in Power system Substation MTR (변전소 내 주변압기 사고 발생 시 배전계통 연계점 이동을 통한 복구 알고리즘)

  • Hong, Jun-Ho;Lee, Seung-Jae;Choi, Myeon-Song;Lim, Il-Hyung;Kim, Tae-Wan
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.159_160
    • /
    • 2009
  • In this paper proposes a new algorithm of efficiency outage restoration using a outage load switching to a healthy MTR a fault occurrence at a MTR. In addtion, proposed algorithm includes a outage restoration method which keeps MTR optimal capacity with reorganization of distribution network in case it can not restore outage state loads caused by shortage of healthy MTR remain capacity. In case that proposed sequence still can not complete restoration, this paper suggests a efficiency outage restoration with objective function included priority in outage loads.

  • PDF

A Study on the Economic of Electrical Storage Device of Stand Alone PV/Wind Hybrid System Based upon Sunless Days (부조일에 따른 독립형 태양광 풍력 복합발전 시스템에서 전기저장장치의 경제성에 관한 연구)

  • Choi, Byoung-Soo;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.3
    • /
    • pp.16-23
    • /
    • 2012
  • This paper relates to a study on the economic of electrical storage device for supplying power in sunless days, in the stand alone PV/Wind hybrid system, which it is applied to separate houses. In a photovoltaic/wind hybrid power system used in a separate house, when only the battery is used in sunless days, the capacity of the battery is become larger. For example, as in recent days, if cloudy days are frequent due to anomaly climate, it is difficult to supply power stably by only the battery based upon pre-estimated sunless days. Accordingly, in order to supply stably power of new renewable energy such as solar to any separate houses, it is preferable to reduce the capacity of battery by decreasing the number of sunless days when estimating the capacity of battery and to drive the small generator for compensation of the power shortage.

The Capacity Increase Scheme for Cellular based LPWA (Low Power Wade Area) IoT (이동통신 기반 LPWA (Low Power Wade Area) IoT를 위한 용량 증대 방안)

  • Park, Bok-Nyong;Jung, Il-Do
    • Journal of Internet of Things and Convergence
    • /
    • v.8 no.4
    • /
    • pp.17-23
    • /
    • 2022
  • NB-IoT and LTE Cat.M1 based on LPWA(Low Power Wide Area) are commercialized and serviced by mobile carriers. As the demand for IoT devices is increased, the number of subscribers to these services is also increasing. In the beginning of service, there was no issue that eNB capacity for NB-IoT and LTE Cat.M1. However, as the number of subscribers increases, there is an issue that the eNB capacity for these service is insufficient. Active UE capacity issue may cause overload by continuous increase and temporary increase. In this paper, we propose a solution to solve the problem of LTE RRC(Radio Resource Control) Active UE capacity shortage and base station overload caused by the increase of NB-IoT and LTE Cat.M1 UE in same eNB. The proposed solution can increase a cell capacity without cell division and additional eNB, and can also improve the service quality of these UEs.

A Study on the Adapting for Interrupting Capacity Augmentation of Circuit Breaker (차단기의 차단합성성대기적에 관한 연구)

  • 황석영;조무제
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.33 no.8
    • /
    • pp.299-309
    • /
    • 1984
  • This paper proposes the adapter for interrupting capacity augmentation of circuit breaker which can be applied in case of shortage in a existing circuit breaker's interrupting capacity due to utility system extension. The adapter utilizes two winding type of reactor instead of single winding type of reactor and the control of 2ry circuit is excuted by a triac interlocked with the system protective relays actuation so as to cut out the reactor by short circuit of the 2ry winding in normal situation and to cut in the reactor by open circuit of the 2ry winding in abnomal situation such as short circuit accident. As a result of the theoritical analysis and experiment, it is proved that the adaptor can reduce the voltage crop and iron loss due to the reactor signigicantly in normal system condition and do a role of reactor upon the power system accident.

Optimal Maintenance Scheduling with the Probabilistic Costing Model (확률적 운전모델에서의 최적전원보수계획)

  • Choi, Ik-Keoun;Shim, Keon-Bo;Lee, Bong-Yong
    • Proceedings of the KIEE Conference
    • /
    • 1988.07a
    • /
    • pp.855-858
    • /
    • 1988
  • Two methods for probabilistic maintenance scheduling are developed and compared ; one with operation and supplied-shortage cost and other with risk level of LOLP. Based on the real economic power dispatch, quadratic optimal maintenance conditions are obtained and simple amtrix equations are suggested for solutions. Both methods are compared in a sample system of 26,000 [MW] peak and 32,000 [MW] generation capacity.

  • PDF

A Study on Site Survey of Emergency Generator for Resources (비상용 발전기 자원화 확대를 위한 현장실태조사에 관한 연구)

  • Cho, Sung-Koo;Han, Woon-Ki;Jung, Jin-Soo;Song, Young-Sang;Lim, Hyun-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1565-1566
    • /
    • 2015
  • As a result of increasing power demand and concern about power supply shortage in the world, various energy sources without depletion of fossil fuel are installed to electrical network. Above all, nuclear energy can be considered as the most economical energy source to generate electricity. But recently, due to problem of safety which has emerged as a key social issue, additional construction of nuclear power plants is difficult. In order to replace nuclear power, researches on the emergency generator have been actively conducting. This study conducted a survey of public institutions about specification of backup generator system and current states to secure available capacity.

  • PDF

Ice Marking Pattern of Flowing Organic Water Solution in a Horizontal Cooled Tube (수평냉각관내에서 유동하는 유기수용액의 제빙형태)

  • 박기원
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.24 no.5
    • /
    • pp.52-57
    • /
    • 2000
  • Recently large capacity of electric equipment and increasing in atomic power generation are shown. One of the reason is shortage of the electric power supply for air conditioning load during summer. And every consumer is concerning about economical refrigeration and air conditioning system to decreases electric power consumption and decrease in global warming. For these necessities, ice making thermal storage system is required. Therefore, in this paper, the possibility of continuous slurry ice making using flowing organic water solution in cooled circular tube has been investigated. The experiments was carried out under some parameters of concentration and velocity of water solution, temperature of cooled tube wall, and control pressure in tube, As a result, four types of operating conditions in the pipe, that was supercooling, continuous ice making, intermittent ice making and ice blockage, were classified . And it was found that the critical condition for continuous ice making was acquired as a function of these experimental parameters.

  • PDF

Cooling Performance Analysis of Ground-Source Heat Pump System with Capacity Control with Outdoor Air Temperature (외기 온도 제어 방식을 적용한 지열 히트펌프 시스템의 냉방 성능 분석)

  • Sohn, Byonghu
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.17 no.4
    • /
    • pp.68-78
    • /
    • 2021
  • In order to solve the increasing deterioration of the energy shortage problem, ground-source heat pump (GSHP) systems have been widely installed. The control method is a significant component for maintaining the long-term performance and for reducing operation cost of GSHP systems. This paper presents the measurement and analysis results of the cooling performance of a GSHP system using capacity control with outdoor air temperature. For this, we installed monitoring equipments including sensors for measuring temperature, flow rate and power consumption, and then monitored operation parameters from July 9, 2021 to October 2, 2021. From measurement results, we analyze the effect of capacity control with outdoor air temperature on the cooling performance of the system. The average performace factor (PF) of the heat pump was 6.95, while the whole system was 5.54 over the measurement period. Because there was no performance data of the existing GSHP system, it was not possible to directly compare the existing control method and the outdoor air temperature method. However, it is expected that the performance of the entire system will be improved by adjusting the temperature of cold water produced by the heat pump, that is, the temperature of cold water on the load side according to the outside air temperature.