A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty (조선시대 화성성역의 공정관리 사례분석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.139-145
    • /
    • 2008
  • The objective of this paper is to analyze the construction management capacity of Choseon Dynasty and suggest a new interpretation on the construction capacity of the time management by reviewing the time management case during a representative construction project, HwaSungk construction project implemented in the latter period of Choseon Dynasty around 200 years ago. which was described in HwaSungSungYoukEuGye. The analysis results of the time management capacity during the latter period of Choseon Dynasty depicted in the HwaSungSungYoukEuGye is summarized as follows: (1) It took 2 years and 6 months to complete the Hwasung construction project. However, all of the single buildings were constructed within 6 months, a relatively short period of time. Judging from the fact, it can be assumed that the construction techniques using wood of the time were very sophisticated. (2) When the HwaSung was constructed, it took a relatively short period of time to complete works from placing the foundation to erecting columns and to placing a crossbeam on the columns. Based on the fact, it can be also inferred that assembly processing techniques of the time were also sophisticated and the level of member processing and assembling techniques of the time was considerably good as well. (3) The HwaSung construction was continued throughout the year without any influence by weather conditions, which tells us that division of labor by work was performed, and it was possible to mobilize labor force for the construction project even during the busy farming seasons.

SHORT-PERIOD VARIABILITY SURVEY (SPVS) IN BOAO (보현산천문대 단주기변광성 탐사(SPVS)연구)

  • Jeon, Young-Beom;Kim, Seung-Lee;Park, Yoon-Ho;Park, Byeong-Gon;LeeK, Chung-Uk;Lee, Eun-Jeong;Kim, Min-Su;Lee, Kyung-Hoon
    • Publications of The Korean Astronomical Society
    • /
    • v.20 no.1 s.24
    • /
    • pp.21-27
    • /
    • 2005
  • We have been performing a wide-field photometric monitoring program, named SPVS (Short-Period Variability Survey), at the Bohyunsan Optical Astronomy Observatory (BOAO). The observation system consists of a small refracting telescope (D = 155 mm, f = 1050 mm) and a $2k{\times}3k$ CCD Camera. The field of view is $1.0^{\circ}{\times}1.5^{\circ}$. Detection limit is about V = 13 for short-period small amplitude variables such as ${\delta}$ Scuti-type pulsating stars, and about V = 15 for long-period large amplitude variables such as eclipsing binaries and RR Lyrae stars. The instrument is designed to be remote-controlled through internet. The primary purpose of this project is to search for variable objects in bright Galactic open clusters. We present results of test observations conducted towards NGC 7092.

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

Benefit-Cost Analysis for Developing Jeongja Port in Ulsan (울산지역 어항개발의 경제성 평가 - 정자항을중심으로 -)

  • Kim, Tae-Yong
    • The Journal of Fisheries Business Administration
    • /
    • v.39 no.1
    • /
    • pp.63-85
    • /
    • 2008
  • The objective of this study is to review the methodology of economic analysis of fishing ports by examining the economical feasibilities of a national fishing port (Jeongja Port) in Ulsan. This study utilized market value evaluation method to measure the benefits and costs related to the development of ports. The benefit variables are income effects resulting from the developments while the cost variables are sum of construction costs and maintenance costs. The income effects are measured in two ways: (1) income from individual project resulting from the developments, (2) the income effects by utilizing investment multipliers. The results shows that the BC ratio (Benefits/Costs) of Jeongja port by using (1) income from individual project resulting from the developments was 1.07 while the BC ratio by using (2) the income effects by utilizing investment multipliers was 1.10 due to a relative short period of useful life for investment multipliers. However, the income variable utilizing investment multipliers is more sensitive to the period of duration than the income variable from individual project.

  • PDF

Evaluation indicators for the restoration of degraded urban ecosystems and the analysis of restoration performance (훼손된 도시생태계 생태복원 평가지표 제시 및 복원성과 분석)

  • Sohn, Hee-Jung;Kim, Do-Hee;Kim, Na-Yeong;Hong, Jin-Pyo;Song, Young-Keun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.6
    • /
    • pp.97-114
    • /
    • 2019
  • This study aims to analyze the effect of urban ecosystem restoration projects by evaluating the short-term restoration performance of the project sites, from both qualitative and quantitative evaluations. In this study, for the qualitative evaluation, we derived the evaluation frame from previous studies and literature. For the quantitative evaluation, the changes in ecological connectivity after the restoration project were described using landscape permeability and network analysis. In addition, changes in habitat quality after the restoration project were evaluated by using InVEST Habitat Quality Model. These evaluations were applied to the three natural madang (ecological restoration) projects and two ecosystem conservation cooperation projects. As a result, three categories, 10 indicators, and 13 sub-indicators were derived from literature as the evaluation frame for this study. In the case of quantitative evaluation of restoration performance, habitat quality increased by 45% and ecological connectivity by 37% in natural-madang, and habitat quality by about 12% and ecological connectivity by about 19% in ecosystem conservation cooperation projects. This implies that the ecological restoration project can increase the ecological connectivity and the habitat quality of degraded sites even in a short period of time by improving the land-cover and land use. The results by applying the evaluation frame indicated that ecological and environmental factors and the ecological functions were improved by the restoration works, even though the magnitude of performances were diverse depending on the specific evaluation items, project type, and site characteristics. This study clarified that the success of ecological restoration project should be assessed by both of the short-term and long-term goals, which can be achieved by the maintenance and sustainable management, respectively.

A Study on Change in Perception of Community Service and Demand Prediction based on Big Data

  • Chun-Ok, Jang
    • International Journal of Advanced Culture Technology
    • /
    • v.10 no.4
    • /
    • pp.230-237
    • /
    • 2022
  • The Community Social Service Investment project started as a state subsidy project in 2007 and has grown very rapidly in quantitative terms in a short period of time. It is a bottom-up project that discovers the welfare needs of people and plans and provides services suitable for them. The purpose of this study is to analyze using big data to determine the social response to local community service investment projects. For this, data was collected and analyzed by crawling with a specific keyword of community service investment project on Google and Naver sites. As for the analysis contents, monthly search volume, related keywords, monthly search volume, search rate by age, and gender search rate were conducted. As a result, 10 items were found as related keywords in Google, and 3 items were found in Naver. The overall results of Google and Naver sites were slightly different, but they increased and decreased at almost the same time. Therefore, it can be seen that the community service investment project continues to attract users' interest.

A study on hazard rate decrease plan in plant construction site by improving foreman's role (플랜트 건설현장의 작업반장 역할개선을 통한 위험율 저감방안 연구)

  • Eun, Nam-Gwon;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.33-44
    • /
    • 2015
  • Domestic plant construction sites have a tendency to become bigger, more various and complicated. Moreover frequency of industrial incident is increasing due to short project period, coexistence work condition and using heavy construction equipment. Installing safety facilities and safety training contribute to prevent incident. But mostly incident happens due to workers' unsafe action and wrong work method. Technically, it is very difficult for us to closely manage workers preventing incident. Therefore, the role of foreman who ordinarily works together with his workers is considered more important. Specific execution plan was drawn through industrial incident statistics from Ministry of Labor and questionnaire survey to interest parties(supervisor, safety staff and foreman). If foreman has raised sense of belonging and responsibility by conducting practical safety training for his workers, manages job site and receives proper compensation for these roles, it will be expected that it fully influences incident decrease.

Development of Model for Optimal Concession Period in PPPs Considering Traffic Risk (교통량 위험을 고려한 도로 민간투자사업 적정 관리운영기간 산정 모형 개발)

  • KU, Sukmo;LEE, Seungjae
    • Journal of Korean Society of Transportation
    • /
    • v.34 no.5
    • /
    • pp.421-436
    • /
    • 2016
  • Public-Private-Partnerships tend to be committed high project development cost and recover the cost through future revenue during the operation period. In general, long-term concession can bring on more revenue to private investors, but short-term concession less revenue due to the short recovering opportunities. The concession period is usually determined by government in advance or by the private sectors's proposal although it is a very crucial factor for the PPPs. Accurate traffic forecasting should be most important in planing and evaluating the operation period in that the forecasted traffic determines the project revenue with user fees in PPPs. In this regards, governments and the private investors are required to consider the traffic forecast risk when determining concession period. This study proposed a model for the optimal concession period in the PPPs transportation projects. Monte Carlo simulation was performed to find out the optimal concession period while traffic forecast uncertainty is considered as a project risk under the expected return of the private sector. The simulation results showed that the optimal concession periods are 17 years and 21 years at 5.5% and 7% discount level, respectively. This study result can be applied for the private investors and/or any other concerned decision makers for PPPs projects to set up a more resonable concession period.

A Study on the Impact of Project Performance According to the Implementation type of PMO Function : Focus on Information and Communication Technology Industry (PMO 기능 도입유형에 따른 프로젝트 성과의 영향 연구 : ICT 산업을 중심으로)

  • Lee, Mu-Geon;Kim, Seung-Chul;Boo, Je-Man
    • Journal of Information Technology Services
    • /
    • v.16 no.2
    • /
    • pp.61-83
    • /
    • 2017
  • It is well known that PMO (Project Management Office)s are effective for successful project performance. Since it takes a long time to develop PMO capability, many public organizations and companies that do not have internal PMOs are increasingly relying on outsourcing of PMO functions in order to introduce mature PMO capabilities in a short period of time. However, it is not verified yet whether outsourced PMO is more effective than internal PMO or not. The objective of this study is to verify the effectiveness of PMO outsourcing. There are many different definitions about PMO function, and even the same PMO function may have different effectiveness depending on the Industry. Thus, this study redefined the PMO functions and Project Performance based on the past studies, and conducted research by focusing on the ICT (Information and Communication Technology) industry. The ICT industry is an important industry economically and has been attracting global attention recently. This study is the first attempt to prove the effectiveness of outsourcing of PMO function in Korea. We found that PMO function outsourcing is effective for certain aspects of project performance, particularly technical support and infrastructure management. Overall, PMO outsourcing is usually more effective than internal PMO for improving project performance. The results of this study are expected to contribute to the development of PMO theories and practices.

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.