The application of the superconducting fault current limiter (SFCL) in a power distribution system is expected to contribute the voltage-sag suppression of the bus line as well as the fault-current reduction of the fault line. However, the application effects of the SFCL on the voltage sag of the bus line including the fault current are dependent on its application location in a power distribution system. In this paper, we investigated the fault current limiting and the voltage sag suppressing characteristics of the SFCL due to its application location such as the outgoing point of the feeder, the bus line, the neutral line and the 2nd side of the main transformer in a power distribution system, and analyzed the trace variations of the bus-voltage and fault-feeder current. The simulated power distribution system, which was composed of the universal power source, two transformers with the parallel connection and the impedance load banks connected with the 2nd side of the transformer through the power transmission lines, was constructed and the short-circuit tests for the constructed system were carried out. Through the analysis on the short-circuit tests for the simulated power distribution system with the SFCLs applied into its representative locations, the effects from the SFCL's application on the power distribution system were discussed from the viewpoints of both the suppression of the bus-voltage sag and the reduction of the fault current.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.5
/
pp.60-67
/
2007
In this paper, a simulation method of the internal winding fault is proposed to calculate winding current and electromagnetic force in a distribution power transformer by suing FEM program. The model of the transformer is a single phase, 60[Hz], 1[MVA], 22.9[kV]/220[V], cable-type winding. The short-circuit current and electromagnetic force are calculated by FEM(Finite Element Method) program(Flux2D) and the results we verified with theoretical formula and PSPICE program. The simulation results are fairly good agreement with the other verified methods within 5[%] error rate. The turn-to-turn short-circuit current is 500 times of the rated current and the electromagnetic force is about $20{\sim}200times$. The method presented in this study may serve as one of the useful tools in the electromagnetic force analysis of the transformer winding behavior under the short circuit condition for design of the structure.
Social development as well as the development of consumer electronic devices due to leakage, electric shock or fire, and many are exposed to the risk of leakage currents. Premises in the control cabinet, but the circuit breaker is installed, the existing circuit breaker shuts off when a short circuit in the control cabinet, installed only have the capability. Also connected to the outlet is installed byeokmada family of devices is not easy thing to check individually. In this paper, circuit breakers and circuit analysis and circuit performance, ZigBee-based premises of consumer electronics devices using sensors to monitor the health of the leakage can be presented on how. Performance analysis, the proposed ELB leakage current control system is built into the appliance leakage circuit breaker for each household appliances because the application can check the status of a short circuit, short circuit, over the existing system can be monitored easily.
This study aims to examine the influence of growth rate, profitability and current ratio, which are confronted with static trade-off theory and pecking order theory, on capital structure of superior hospital and bankrupt hospital. Firstly, superior hospitals show positive correlation between growth rate and short-term loans, long-term loans, and short-term liabilities while bankrupt hospitals represent negative correlation. Superiority hospital and bankruptcy hospital show different financing behaviors, especially, short-term loan is the significant characteristic that discriminates between superior hospital and bankrupt hospital. Secondly, this paper studied the correlation between profitability and short-term loan, which the superior hospitals shows negative correlation, to contrast, bankrupt hospital have positive correlation. Consequently, the short-term loan is the most distinguishable factor between the superior hospital and bankrupt hospitals in terms of profitability. To conclude, this study shows that excess short-term loans can be the most important cause for hospital's bankrupt. Accordingly, strategic and effective policy about the short-term loan will be required in order to protect hospital's bankrupt.
Kim, Sun-Koo;Kim, Sun-Ho;Kim, Won-Man;La, Dae-Ryeol;Roh, Chang-Il;Lee, Dong-Jun;Jung, Heung-Soo
Proceedings of the KIEE Conference
/
2006.07b
/
pp.705-706
/
2006
Generally Short Circuit Test of transformers are tested according to IEEE std C57.12.00-2000, IEC 60076-5(2000-07), ES148(1998.6.26) or KS C4309(2003). But ES148(1998.6.26) is same as IEEE std C57. 12.00-2000 and KS C4309(2003) is revising coincidence with IEC 60076-5(2000-07). On this study condition of the transformers before short circuit test, calculation method for test current peak value, tolerance on the asymmetrical peak and r.m.s value, short circuit testing procedure, number of short circuit test, duration short circuit test, and detection of faults and evaluation of short circuit test result will be compared with ANSI and IEC.
Weld quality of GMA welding processes is closely related to arc stability. Although many researches on arc stability have been performed, real-time estimation of arc stability has not been attempted. For instance, Mita proposed a off-line statistical method in which short circuiting and arcing time, and voltage and current wave forms were sampled to assess arc stability. But this method is not suitable to assess arc stability for GMA welder which employ inverter power source due to its controlled current and voltage wave forms. In this paper, the relationship between are stability and wire feed rate fluctuation is analyzed to propose new criterion for inverter power source. When arc voltage and arc current and arcing time are analyzed, we can assess arc stability only for short circuit transfer mode. When wire feed rate is analyzed, we can estimate arc stability udner the condition of spray transfer mode as well. Hence, the wire feed rate is chosen for monitoring process variable to cover possible metal transfer modes in GMAW. Through this research, it has been identified that arc stability in GMA welding processes is closely related to wire fed rate. When inverter power source is used, conventional statistical method of estimating arc stability, such as Mita index, is no longer valid due to its controlled voltage and current wave forms. Arc stability has been also examined in phase plane diagram.
The AC loss is an important issue in the design of the high temperature superconductor (HTS) power cables, which consist of a number of lli 2223 tapes wound on a former. In the cables, the tapes have different critical currents intrinsically. And they are electrically connected to each other and current leads. These make loss measurements considerably complex, especially for short samples of laboratory size. In this work we have prepared a multi-tape conductor composed of Bi-2223 tapes. The at losses of the conductor have experimentally investigated. The loss tests indicate that the effect of tapes critical currents on AC loss measurement in the multi tape conductor is negligible only if currents in the tapes flow uniformly Moreover, the measured tosses of the conductor are in good agreement with the sum of the transport losses in the tapes. However, in the case of non-uniform current distributions, the measured AC losses considerably depend on the current distribution parameter of the positioning of a voltage lead. Thus special cautions should be needed for the measurement of the true AC losses in the short power cable samples.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.6
/
pp.1108-1114
/
2016
The cause of failure in the AT feeding system is divided into grounding, short-circuit of feeding circuit and internal faults of the railway substation. Since the fault current is very high, real-time current is detected and the failure must be immediately removed. In this paper, a new DC offset elimination filter that can remove component to decrease in the form of exponential function using low-pass filter was proposed in order to extract the fundamental wave from distorted fault current. In order to confirm the performance of the proposed filter method, AT feeder system was modelled by simulation tool and simulations were performed under various conditions such as fault location, fault resistance and fault voltage phase angle in case of trolley-rail short-circuit fault. When applying the proposed DC-offset removal method, it can be seen that the phase delay and gain error did not appear.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.26
no.7
/
pp.52-58
/
2012
In this study, we have investigated the effect of the solar power generation facilities on the power quality of interconnected solar power generation system. When the solar power generation facility was connected to the distribution system, whether the solar power generation is under operation or not, Peak factor of current was increased to 0.033[%], Frequency is deviated from $60{\pm}0.2$[Hz] and also Short term flicker indication($P_{st}$) increased to 0.213[p.u.] compare with the disconnected situation. Harmonic current [%] in orders was 11.42[%] maximum under 11th orders and was 7.861[%] between 11th and 17th orders. These values were about 3 or 4 times compared with "the power system interconnection technique standards" at the same situation above. Therefore, we could confirmed that the solar power generation facility, when it was connected to the existing distribution system, made bad influence on the power qualities such as the peak factor of current, frequency regulation, short term flicker indication($P_{st}$) and harmonic current [%] in orders etc.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.11
no.2
/
pp.259-267
/
2000
This paper presents the method for an estimation of discharge current waveshapes in short gap discharge by radiated electromagnetic fields. The method of current waveform estimation described is using the one antenna method(single field method) and two antennal method(complex field method) with a measured electric or magnetic fields at given field point by a time domain antenna. In order to verify the availability of the estimation theory, the discharge current waveshape estimation was performed by one and two antenna methods using the measured electric fields of Wilson & Ma and compared with experiments.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.